IMIESA August 2021

Page 28

WATER & WASTEWATER

Pressure control to fight water shortages in Eastern Cape Nelson Mandela Bay Municipality (NMBM) is experiencing a drought, with its largest supply dam, Kouga Dam, dropping to its lowest level since it was commissioned in 1969. Water pressure management is considered as the most effective real loss and water demand management intervention by NMBM.

N

MBM is a water services authority (WSA) and water services provider (WSP). It encompasses the Gqeberha (formerly Port Elizabeth), Kariega (formerly Uitenhage), Despatch and KwaNobuhle areas, and supplies water to Kouga Municipality (its largest water consumer). High water pressure contributes towards an increased number of burst pipes and a greater volume of water lost due to underground leaks. The aim of pressure management

St Georges Strand PRV during construction

Lyle Francis, acting deputy director: Water Demand Management, NMBM

Pieter Joubert, professional engineer at Engineering Advice & Services

is to reduce pressure to an acceptable level and, therefore, actual water losses. Water pressure management also decreases water consumption and increases the asset life. NMBM has appointed two service providers – Re-Solve Consulting and Engineering Advice & Services – to formulate and implement a water pressure management plan. “The NMBM region is divided into supply zones, with plans to install one or more pressure-reducing valves (PRVs) into as many zones as possible. Currently, there are 68 pressure-managed zones within NMBM, which covers approximately 25% of the water network,” explains Lyle Francis, acting deputy director: Water Demand Management, NMBM.

26

IMIESA August 2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
IMIESA August 2021 by 3S Media - Issuu