CESA Aon Awards publication 2021

Page 28

Mentor of the Year

Amal Doorgapershad Knight Piésold engineering judgement by exposing them to tasks of increasing responsibility throughout their candidacy. He emphasises the need for a holistic approach, since registered professionals need to be capable of making decisions that address all aspects of a problem, not just the technical components. Under his guidance, candidates have had opportunities to work on some of the largest steel pipeline projects in KwaZulu-Natal, including the preliminary design, detail design and construction monitoring of: • Western Aqueduct Phase 1 for Umgeni Water – diameters up to 1 600 mm • Western Aqueduct Phase 2 for

A

eThekwini Municipality – diameters up to 1 400 mm • Northern Aqueduct for eThekwini Municipality – diameters up to 100 mm

mal Doorgapershad is

development of young engineering

a professional civil

professionals, particularly for graduates

engineer with over

entering the industry. Aside from sharing

25 years of experience in

his technical knowledge with his mentees,

Most recently, candidates have been

the planning and design of bulk water

he also seeks to uphold the dignity and

afforded opportunities to work on large-

supply infrastructure. Throughout his

ethics of the engineering profession and

scale, cross-border water projects such as

career, he has mentored candidate

leads by example.

the Lesotho-to-Botswana Water Transfer

professionals under his supervision and

He recognises that a blanket approach

• North-South Carrier Phase 2.3 for Water Utilities Corporation (Botswana).

Pre-feasibility Study and the Lomahasha

has been instrumental in creating an

to mentorship cannot be applied and

Namaacha Water Supply project between

environment within Knight Piésold’s

therefore ensures that he acquaints

Eswatini and Mozambique.

KwaZulu-Natal branch, as regional

himself with candidates on a one-on-one

manager, that promotes tutelage and

level and seeks to understand them, their

professionals to learn as much as

knowledge-sharing.

interests and personalities in order to

possible about the management aspects

tailor his mentorship strategy to each of

of engineering. Aside from management

the candidate’s needs.

of projects in terms of resourcing and

Most recently, three of his candidates have successfully obtained their professional registration with ECSA within the past two years. Amal believes that a mentor has tremendous responsibility in the

When scheduling work activities for

Amal encourages young engineering

budget planning and monitoring, the

mentees, Amal assigns tasks to ensure

mentees are always asked to consider

that the mentees are given ample

the risks associated with the designs

opportunity to constantly improve their

and decisions.

26 C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 1


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Daveng Consulting Engineers

1min
page 26

Edward Archer | SMEC South Africa

2min
page 27

Bigen Group

2min
page 24

Koleko

1min
page 25

Amal Doorgapershad | Knight Piésold

2min
page 28

Xolani Mandidi | AECOM

1min
page 32

AECOM

2min
page 29

Koleko

1min
page 30

Knight Piésold

2min
page 23

BVi Consulting Engineers

1min
page 22

Kuils River Upgrade by Zutari for City of Cape Town, Western Cape

2min
page 18

Construction of Mgcobaneni Bus Route and Culvert by Nathoo Mbenyane Engineers for the City of Mbombela, Mpumalanga

2min
page 19

Engineering 4.0 Building by Spoormaker & Partners for the University of Pretoria, Tshwane

2min
page 20

Plankenbrug Main Outfall Sewer and Associated Works - Phases 2 & 3 by AECOM for Stellenbosch Municipality, Western Cape

2min
page 17

Xhora Off-channel Dam Project by Hatch for Amathole District Municipality, Eastern Cape

2min
pages 15-16

Design and Construction of the Emoyeni Reservoir by Knight Piésold for eThekwini Municipality, KwaZulu-Natal

2min
page 14

Vopak Terminal Lesedi Admin Building by Zutari for Vopak South Africa Developments in Joint Venture with Royal Vopak and Reatile Resources, Gauteng

2min
page 21

The UCL 175 TCH Factory Expansion Project by Bosch Projects for UCL Company, KwaZulu-Natal

2min
page 12

The Leonardo by RMCE for Legacy Group, Sandton, Gauteng

2min
page 8

16 on Bree by Zutari for FWJK Developments, Cape Town

1min
page 9

Upgrading of National Route 7, Section 1 between Atlantis South and Kalbaskraal by AECOM for SANRAL, Western Cape

1min
page 10

Trans African Concessions (TRAC

2min
page 7

Dr PD (Dempsey) Naidoo

2min
page 6

Mareesburg Tailings Storage Facility (Phase 2) by SRK Consulting for Anglo American Platinum, Limpopo

1min
page 11

Aon: An opportunity to build a ‘new better’

2min
page 5

CESA: Making engineering future-proof

2min
page 4
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CESA Aon Awards publication 2021 by 3S Media - Issuu