key 6
1.
existing buildings
2.
reconfigured IBM factory units
3.
proposed new built development (locations altered from Highcross masterplan)
4.
planted landscape structure
5.
proposed linear wetland
6.
improved Spango Burn corridor
7.
green link thro’ site
5
6
3
4
1
7 1
1
4
3
7 3
1 5 2
2
6 4
5 4
Š Crown Copyright and database right 2012. All rights reserved. Ordnance Survey Licence number 100023421.
D
62
integrated green infrastructure design study, spango valley - inverclyde
0m
50m
100m
200m