Johnstone South West - IGI Design Study

Page 58

Johnstone High School Sub-catchment 9 New wet pond and retention area within school grounds are linked to deculverted Floors Burn.

Existing park Sub-catchment 10 Deculverting of Floors Burn within existing parkland to form new wet pond and retention area.

Thomas Shanks Park Sub-catchment 11 Floors Burn deculverted within Thomas Shanks Park and connected to new wet woodland.

Cochrane Castle and Auchengreoch Sub-catchments 12, 13, 14 Retrofit measures implemented to reduce pressure on combined sewerage system. Craigbog Burn deculverted along Sycamore Avenue with large green retention area to South and pond/wetland at Crikey Park to the North. © Crown copyright and database right 2012. All rights reserved. Ordnance Survey Licence Number 1000332510

This document has been prepared by AECOM Limited for the sole use of our Client (the “Client”) and in accordance with generally accepted principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

Legend

Site Boun

Sub-Cath

Pond/Woo Total Sub (50% imp

Pond/Woo Design St (40% imp

Thomas Shanks Park

Surface W Temporary

13

14

Surface W Temporary

11

De-culver

10

Bluebell Woods

Swale

Existing C

12

Milliken Park Rail Station

Proposed

Johnstone High School

8 9 7

Cochrane Castle Golf course

Client

ocument has been prepared by AECOM Limited for the sole use of our Client (the “Client”) and in accordance with generally accepted principles, the budget for fees and terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

6

Ren

Legend

Community Growth Site

Site Boundary

2

5 4

Pond/Wooded Wetland Total Sub-catchment (50% impermeable) Pond/Wooded Wetland Design Study Development Area (40% impermeable)

1

$

3

Site

Surface Water Exceedance Route / Temporary Floodplain - Option 2

Swale Existing Culvert Proposed Culvert

BASED ON ORDNANCE SURVEY MAPPING WITH PERMISSION OF THE CONTROLLER OF HER MAJESTY’S STATIONARY OFFICE (C) CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO CIVIL PROCEEDINGS. LICENCE NO. 100023417

Fig 4.4 Surface water management strategy, AECOM 2010. Not to scale. STRATEGIC DRAINAGE

$

Spateston Sub-catchments 1, 3, 4, 5, 6 Pond and dual recreational/flood attentuation floodplain Client Renfrewshire Council formed within sub-catchment 3 to hold surface water runoff as far as possible before it travels north into subcatchments 5 and 6. Spateston Burn is deculverted within sub-catchments 5 and 6 to form a key blue-green Green Networks Project Integrated Urban Infrastructure route linked to new local shopping hub withSites associated 6 Candidate wet ponds to existing open space. Site

Johnstone South West

Title

Site SuDS Layout

Figure 2.7a

Ref Scale

NTS

Drawn by

BOC

Date

Nov'10

Chk'd by

PR

Site

Title Ref

De-culverted Watercourse

Spateston North Sub-catchments 7, 8 No substantial green or amenity areas existing within these areas to accommodate larger SuDS features. Runoff could be attenuated by retrofitting permeable paving and rainwater harvesting.

John

Surface Water Exceedance Route / Temporary Floodplain

Highcraig Quarry

N

Spateston West Sub-catchment 2 Wildflower meadow with wet pond created to outer edge of catchment as SuDS buffer for future development . Potential to extend wildflower meadow and wetland features to the perimter of the proposed community growth site to the north west.

G Integrated 6

Project

Sub-Cathment

Rev. -

Scale

NTS

Draw

Date

Nov'10

Chk'


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Johnstone South West - IGI Design Study by GCR Green Network - Issuu