Federation Villages Floodplain Risk Management Study and Plan
Chart 3 Breakdown of Total Annual Average Damages by Village
Urana $225,200
Oaklands $178,600
Boree Creek $724,100
Chart 5 Distribution of Commercial AAD across the Villages
Urana $118,500
Boree Creek $340,500
Oaklands $98,400
R
Oaklands $80,300
Urana $106,700
Rand $35
PU
Rand $596
BL
IC
Chart 4 Distribution of Residential AAD across the Villages
EX
Morundah $194,600
H IB IT IO
N
Rand $630
Morundah $45,900
D
R
AF
T
FO
Morundah $148,700
Boree Creek $383,700
5.6.3. First Event Flooded
In addition to estimating direct tangible costs in design flood events and determining Annual Average Damages, the damages assessment is useful in identifying the frequency of event in which residential and commercial buildings are likely to first be flooded above floor level, and identifying these buildings spatially. Figure 3 (Sheets 1-5) show all buildings in each village’s Study Area estimated to be flooded above floor, categorised by the design event in which they are expected to be subject to over-floor flooding. This information can assist in identifying areas subject to the greatest flood risk, where investment in flood mitigation works may be warranted, as well as highlight areas where planning controls (such as land use zoning and minimum floor level controls) have been implemented effectively.
118048: R211211_FederationVillagesFRMSP.docx: 11 December 2021
42