PORTFOLIO
1
FABRIZIO VENERUSO
FABRIZIO VENERUSO currently living in Ferrara (IT) born 03/03/1998 CONTACTS: fabrizio.veneruso@edu.unife.it +327 4572464
EXPERIENCESANDWORKSHOP: March 2021-Present Collaboration with studio “PEA progettazioni e architettura s.R.L.” For the realization of outdoor furniture December-June 2020/21 Participation in the participatory process “Forestazione urbana, insieme per una città sostenibile” Organized by “csv terre estensi”, as a member of the collective “suber rebus” November 2019 Study trip “Balkan Architectures” to Slovenia, Bosnia Herzegovina and Croatia, organized by Proviaggiarchitettura April 2018 Workshop of architectural survey: four days At cloister of Basilica of Saint Francis in Bologna (IT) November 2018 Workshop “architecture from the wildness”, chaired by “Parasite 2.0” Studio and organized by “HPO” studio, Ferrara (IT) October - December 2018 Basic course Casaclima (klimhouse) and application workshop with Certificate issue, chaired by arch. Federico Arieti June - September 2017 Internship in the “g.S.T. Topographic services group” studio, Reggio Emilia (IT), improved the competences in the architectural survey with laser Scanner.
EDUCATION: September 2017 – Present University degree: Department of architecture (DA) – University of Ferrara (Ferrara, IT) 2012– 2017 Diploma of surveyor at ITG, A.Secchi, Reggio Emilia (IT). Final grade 98/100. Principal subject: estimation and financial math, topography, building site management, architectural design
SKILLS: Autodesk Autocad 2d, Autodesk Revit, Adobe Indesign, Adobe Photoshop, Adobe Illustrator, Rhinoceros 6, Maxon Cinema 4d r19, Sketchup pro 2018, Model making
INDEX URBAN REGENERATION OF THE “EX OGR” Bologna, Laboratory of architectural design IV, 2021
6
URBAN REGENERATION OF THE “CASERMA TITO” Sarajevo, Laboratory of architectural design III, 2019
18
URBAN REGENERATION “NORTHERN SECTOR” Bologna, Laboratory of urban planning, 2020
26
“JOREJICK FAMILY HOME IN TANZANIA” Competition project, organized by ArchStorming Team, 2020
32
“SENEGAL ELEMENTARY SCHOOL” Competition project, organized by ArchStorming Team, 2020
34
“PALAZZO TASSONI” Ferrara, Laboratory of monument restoration, 2020
36
“TOURISM BOX” INNOVATIVE AND SUSTAINABLE ACCOMMODATION CENTER Veneto, Laboratory design and construction 1, 2018
40
EXTENSION OF THE MUNICIPALITY OF CALDERARA DI RENO Bologna, Laboratory design and construction 2, executive project, 2021
44
DRAWINGS
48
URBAN REGENERATION OF THE “EX OGR” Bologna, Laboratory of architectural design IV, 2021 partners: Lorenzo Del chierico, Gulce Tufan, Gregorio Gabbrielli supervisor: prof. Nicola Marzot
The ex-OGR industrial area is a large infrastructure which was originally dedicated to train maintenance, a large production centre for Bologna but also an alienating presence in the Ravone district. The idea of regenerating this area therefore stems from the “city by parts”, in which, as in Rossi’s conception, the local parts are each architecturally characterised and clearly defined. Here, however, we have also tried to focus on what happens between the parts, that is, the “transition areas”, and so we can talk about a new generation infrastructure, no longer the original one, developed according to an incremental approach, which develops a new concept of work space divided into production, display and application.
01
6
7
Production
Exhibition
Application
Union
Trade
Reuse
City
Union
Conceptual diagram
Aerial view of the intervention with its context
8
9
0
5 10
20
50
N
TRADE: The edge is reconnected to the city through an architectural pathway
10
11
0 10 20
50
N
PRODUCTION: The old train maintenance system becomes a new system for producing “objects” for the city
The Depò is the last stage of the production process, the exposure and it is also the limit with the out-of-control exterior.
Container
Dumbo
Silo
Bacco
Devonshire
Forum
Foucault
shed
Galileo
Gunes
sarlo
Tarkovskij
Oppio
Mendel
1
Oppidanis
12
13 Abaco of the “objects” that move in the park Setup type scenario
Annual attendance intensity
G
G
M
F
A
M
1
1
2
3
4
5
6
7
8
9
2
10
M
F
G
4
5
11
12
13
M
A
L
3
A
6
7
14
15
G
S
8
16
9
O
10
17
18
11
12
19
A
L
N
13
20
S
O
N
2
D
D
14
21
15
22
16
17
23
24
18
19
20
21
22
23
24
3
APPLICATION
Stages of setting up the park 1.transport 2.assembly 3.voilà
14
15
The park in the morning
The park in the evening
acque bianche
pendolino acque grigie
specie macrofite utilizzate
Degrassatore in cemento
pendolino
16
vetiver (Chrysopogon zizanioides)
17
impianto di riuso dell'acqua depurata per uso domestico cannuccia di palude (Phragmites australis) pozzetto di prelievo campioni
tifa(Typha latifolia)
camino di ventilazione tessuto non tessuto
pozzetto di regolazione battente idraulica e pozzetto di prelievo campioni
sistema di irrigazione del parco con acqua riciclata
refluo depurato Il "fuoco" è una serra che viene alimentata dall'acqua depurata della fitodepurazione e dall'energia termica prodotta dal conegeratore, i prodotti della serra vengono esposti nel parco
Bacino di raccolta dell'acqua depurata
REUSE: The new concept of work is not only about ‘objects’ but also about waste
ghiaia grossa pezzatura 16-32mm
tubo di uscita D:110mm
ghiaia lavata di fiume pezzatura 8-12mm
Impianto di fitodepurazione orizzontale per il trattamento delle acque reflue, previo trattamento, dimensioni 1500mq, h=90cm, utenza stimata 200 A.E.
URBAN REGENERATION OF THE “CASERMA TITO” Sarajevo, Laboratory of architectural design III, 2019 partners: Federico M. Polani, Silvia Zimarino supervisor: prof. Marcello Marchesini
18
The development of the city di Sarajevo has a linear course along the river, and this conformation allows the definition of an “assembled landscape” of individual independent parts, fragments, which live as autonomous figures within the totality of the urban context. The compromise lies in finding and reinforcing the links that allow the connection between the parts to be experienced in a more spontaneous and natural way. Analysing the intervention area, it was decided that the matrix of the project would be the intersection of two urban meshes: one of the barracks and the second of the city rotated by 15 degrees, the intersection of these two meshes generated a path that took the form of a portico. This element then became the generator of architecture just like the first settlements along the river banks.
Physical model
19
Floor plan
Torre
20
21 Cattedrale
Esedra
Anfiteatro
1
22
23
2
3 Axonometric view of the cathedral with swimming pool and SPA
Internal views: 1.ground floor swimming pool 2. first floor swimming pool 3.“Portico”v
1
24
25
2
3 Aerial view showing the seam created with the Portico
Internal views: 1.“Anfiteatro” for sports events 2.“Torre” as a vertical gymnasium 3.“Esedra” as a refreshment area
URBAN REGENERATION “NORTHERN SECTOR” Bologna, Laboratory of urban planning, 2020 partners: Federico M. Polani, Silvia Zimarino, Filippo G.N. Marchetta supervisor: prof. Marco Zaoli
26
Garden
Viale
Market
Borgo
27
Longitudinal section
Longitudinal section
28
29
Ground floor plan
Ground floor plan
The old Casaralta factories are being reused as a hydroponic farm in urban areas, with part of the produce going to the market in front of them and the remainder for export.
“The open block” was created by studying the work of Jane Jacobs and trying to update it in a place where properties are divided into closely spaced private lots of similar size, divided into blocks. So what we propose is to open up the blocks internally and manage the space more efficiently with car parks, green areas and paths.
Longitudinal section
Longitudinal section
30
31
Ground floor plan
“Naked street” through the abolition of the pavement, the design of the paving and the use of furniture, an attempt has been made to create a mixed street to enhance the commercial activities on Via Ferrarese.
Ground floor plan
The proposal for “Civico 59”, a disused industrial building, is the creation of a theatre and an exhibition space that can interact on certain occasions through staging and performances.
“JOREJICK FAMILY HOME IN TANZANIA” Competition project, organized by ArchStorming Team, 2020 partners: Andreas Theodoridis, Filippo G.N. Marchetta
2
1
32
33
3
Plan and longitudinal section
1.view of the entrance 2.view of the courtyard with the curtains 3.view of the inner courtyard with the well
“SENEGAL ELEMENTARY SCHOOL”
Competition project, organized by ArchStorming Team, 2020 partners: Fracesca Pucci, Chiara Marcantonio, Valerio Zulì
34
Plan and longitudinal section
1
2
3
4
1.entrance to the school 2.entrance to the library 3.loggia for eating and playing indoors 4.library
35
“PALAZZO TASSONI”
Ferrara, Laboratory of monument restoration, 2020 partners: Federico M. Polani, Anna Marcon supervisor: prof. Luca Rocchi
36
37 SEZIONE LONGITUDINALE AA' - FOTOPIANO SCALA 1:20
0
0.2
0.5
1m
Restoration of the loggia in the palace courtyard with an 18th-century wooden door and a 15th-century “caselle and cantinelle” ceiling
SEZIONE LONGITUDINALE AA' - FOTOPIANO SCALA 1:20
Photo plan of the actual state
0
0.2
0.5
1m
SEZIONE LONGITUDINALE AA' - STATO DI PROGETTO SCALA 1:20
Restoration work includes plastering with “scialbatura” the entire wall, restoring the stucco and doorway and completing the upper frieze. 0
0.2
0.5
1m
SEZIONE LONGITUDINALE AA' - STATO DI PROGETTO SCALA 1:20
0
0.2
0.5
1m
A
A'
N
Ground floor
First floor
1
38
Cross section
2 Longitudinal section
Technological section scale 1:20 The new building staircase
Internal views of the new building staircase: 1.first floor 2.ground floor
39
“TOURISM BOX” INNOVATIVE AND SUSTAINABLE ACCOMMODATION CENTER Veneto, Laboratory design and construction 1, 2018 supervisor: prof. Pietromaria Davoli
40
41
Axonometric cross-section of the SPA
Aerial view with SPA and living modules
42
43
0 0.2
0.5
1
Technological section housing module scale 1:50
Physical model
EXTENSION OF THE MUNICIPALITY OF CALDERARA DI RENO Bologna, Laboratory design and construction 2, executive project, 2021 partners: Caterina Rondina, Anna Marcon supervisor: prof. Giovanni Zannoni 2
1
3
492
4
492
492
8 492
451 XVII
XVIII
3
2
3 2
3
1
3
184
2
157
CV02
PV02 CV03
CV01
PV02
CV01
160 210
2
1
7 492 7'
5' 602
VI
87
1
152
D
PV02
CV03
PV02
1
V
IV
III 135
492
4' 451
II 152
6
5
492 2'
I
CV02
90 210
P.4
P.7
D
+60 160 210
1/105 LOCALE TECNICO
P.7
1/106 UFFICIO TRIBUTI
1/108 UFFICIO RESPONSABILE TRIBUTI
1/107B DISTRIBUTIVO
1/109 UFFICIO RESPONSABILE ANAGRAFE
PV01
1/111 UFFICIO RESPONSABILE URP
1/110 UFFICIO RESPONSABILE SERVIZIO CITTADINANZA
PV01
1/112 UFFICIO ELETTORALE
1/113 ARCHIVIO UFFICIO ELETTORALE
5 4 3 2 1
90 210
P.5
P.5
492 185
P.4 1/114A UFFICIO URP
g F.5
+62
145 210
90 210
F.5 CV01
F.5
CV01
P.1
P.1
145 210
F.5 1/101A RECEPTION
1/104A UFFICIO ACCETTAZIONE E CONTROLLO
F.5
f
1 2 3
F.5
1/101B AREA GIOCO
1/101 INGRESSO
PV04
1/114B UFFICIO ANAGRAFE, ASSESSORATO E INCONTRI AL PUBBLICO
PV07
e
184
492
145 210
185
F.5
F.5
F.5
847
F.5
F.5
CV03
P.9
CV02
CV03
CV01
P=8%
184
+60
P.10
150 210
3/101 COLLEGAMENTO
+60
CV05
P.10
150 210
246
3
CV05
5
1108
184
CV04
152 III
87 IV
157
387
554 VII
VI
V
492
492 A' TAV3
6
+0.00
7
8 b
235
135
F.5
c
492
+0.00
4
215
2'
II
F.5
+60
184
492
3'
602
307
247
VIII
215 5'
4'
a
I
F.5
XI
185
IX
6'
7' a
XII
368
PANNELLO MULTIMEDIALE 236
184
480
A TAV3
2
370
184
492
756
184
492
1
F.5
3 2 1
CV04
246
369
b
F.5
d
c
492
F.5
CV03
185
F.5
184
F.5
235 270
F.5
A
d +62
F.5
d
184
A
B
A'
P.3
B' TAV4
C'
Fermata bus +0.00
P.1 1/101D Ristoro
PV06
P.2
C
F.5
PV02
145 210
80 210
PV02
80 210
145 210
1/102 VANO SCALA P.1
PV07
P.2
D'
h
F.5
90 P.6 210
1/103A WC
187 210
1/101C DEPOSITO
1/101C DEPOSITO
P.1
F.5
90 210
P.10
321
P.5
i
PV02 1/107D DISTRIBUTIVO
492
P.6
P.4
492
90 P.6 210
PV01
p=30cm a=17cm
PV02 F.5
A'
90 210
9 8 7 6
P.5
80 210
P.5 1/103B WC
90 210
P.4
201
90 210 P.5
90 210
P.6
PV02
5 4 3 2 1
CV03
+102
1090
B
80 210
80 210
P.7
90 210
80 210
160 210
90 210
PV02
1/107C DISTRIBUTIVO
80 210
51
p=30cm a=17cm
26 36
m
P.8
+147
PV02
PV02
507
p n B'
201
492
B TAV4
90 210
PV03 PV05
P.8
P.4
1/104B CENTRALINO E MESSO COMUNALE
1
62
321
2 q
90 210
80 210
3
PV01
694
184
P.8 1/107A DISTRIBUTIVO
C'
C
P.4
P.4
PV03
90 210
369
P.4
90 210
P.4
P.4
90 210
127
90 210
3/102 SCALA ANTINCENDIO
PV02
90 210
492
PV02
PV03
185
X
246 XIII
307
554
183
493
XIV
XIV
XV
XVI
XVII
44
45 1
I
II
III
IV
V
2'
VI 2
1
chiusura orizzontale C02: copertura verde estensivo con vegetazione a base di Sedum (soluzione Daku Estensivo Standard)
chiusura verticale C02: infissi a taglio termico Schuco FWS 25 PD
CO02
4' 3
struttura portante: orditura secondaria con travi IPE 240
controsoffitto in gliglia metallica appeso con pendini regolabili, ispezionabile (sistema KNAUF Amstrong Mesh Lay-in)
controsoffitto in cartongesso appeso con pendini
7'
5' 6
5
4
sistema di sicurezza antincendio: finestra per tetti piani VELUX INTEGRA CVP con cupola motorizzata
struttura portante: setto in cemento armato
7
struttura portante: trave IPE 550 specifica per la sala del consiglio
sistema impiantistico: sfiati dei servizi igienici
CO02
8
controsoffitto in plafoni S.T.B fonoassorbenti tav10 appeso con pendini
struttura portante: pilastro circolare Ø21cm
chiusura verticale C01: infissi fissi a taglio termico Schuco FWS 25 PD
+1266
+1248
+1225
2
+1217
+1040
PV02
PV02
PV02
PV02
sistema di ombreggiamento: frangisole orientabile in lamiera stirata, percentuale di ombreggiamento 50% (Mariani Tech. modello Soho)
PV02
CV01 PO01
+855
+855
+855
+672
+847 sistema di ombreggiamento: pensilina realizzata con profili in acciaio scatolari rettangolari 300x100 orditura principale e 150x80 orditura secondaria
+670
XVII
PV02
PV02
PV02
PV02
CV01
XVIII
PV02
PV05
PV05 PO01
+485
+485
PO01
+485
+485 +439
+314
+302
CV01
PV02
PV02
+147
PV02
PV02
PV02
+102 +62
+62
CO01
+62
CO01
+60
60
CO01
+0.00
sistema di collegamento verticale: scala di emergenza esterna in acciaio (a=17, p=30)
struttura portante: pilastro in acciaio Ø21
struttura portante: platea di fondazione in ca. armato sp. 50 cm, posata su magrone di sp. 8 cm e sottofronfo drenante di ghiaia
sistema di collegamento verticale: scala in acciaio (a=17, p=30)
Ground floor plan and longitudinal section
partizione verticale PV01: parete in cartongesso doppia lastra su profilati guida metallici (sistema Knauf)
3
+0.00
pavimentazione podio esterno realizzata con pavimentazione galleggante in gres effetto marmo, con piedini regolabili in polipropilene
1.view of the facade by day 2.view of the facade by night 3.view of the building from the square
46
47
Technological section scale 1:20 with elevation
Technological nodes scale 1:5 with fixings
48
DRAWINGS
49
50
51
52
53
54
55
56
57
58
59
60