The Messenger 178

Page 50

ESO/M. Zamani

Astronomical News

Students and project supervisors at the First ESO Summer Research Programme pose for a photo at the Supernova Planetarium and Visitor Centre (see p. 57).

The ESO contract for the design and production of the cell for the M5 mirror of the Extremely Large Telescope was signed with SENER Aerospacial (Spain) on 29 November 2019. The contract was signed by the ESO Director General Xavier Barcons and the General Director of SENER Aeroespacial José Julián Echevarría.

50

The Messenger 178 – Quarter 4 | 2019


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.