ENGINE
EN-59
Hino K13C Hino K13D Unit: mm {in.}
Inspection Item
Standard
Limit
Remedy
Crankshaft Oil Hole Clogged
Clean.
Crankshaft: Cracks and Damage (Dye penetrate check)
Replace.
Inspection Procedure Visual check
SM3-J262
Crankshaft Bend
0.05 {0.0019}
Replace. (K13C-T)
Measure.
Regrind under size. (K13D-T) SM3-J688
Piston Ring Width
Top 2nd
Measure.
3.306 {0.1302}
I
Replace. 3.5 {0.1378}
3.25 {0.1280}
K13C-T
5 {0.1969}
4.95 {0.1948}
K13D-T
6 {0.2362}
5.95 {0.2343}
3rd Oil Piston Ring Groove Width
Measure.
Top Replace piston.
2nd 3rd Oil Clearance between Piston Ring and Piston Ring Groove
SM3-J546
3.5 {0.1378}
3.75 {0.1476}
K13C-T
5 {0.1969}
5.05 {0.1988}
K13D-T
6 (0.2362}
6.05 {0.2382}
Top 2nd 3rd Oil
0.07--0.11 {0.0028--0.043}
0.20 {0.0078}
0.04--0.08 {0.0016--0.0031}
0.10 {0.0039}
Replace piston ring and/or piston.
SM3-J545
Hino K13C Engine Parts Contact: email EngineParts@HeavyEquipmentRestorationParts.com Phone: 269 673 1638 Website: www.HeavyEquipmentRestorationParts.com