GEEP Project – New boiling and mixing equipment in an Ice Cream factory This ice cream factory is in the process of modernising all its equipment. At present it produces around 1600 tons of ice cream a year and meets 20-25% of the national demand. This year it is time to replace the ice cream mixture preparation, boiling and cooling units during the winter (non-productive) season ready for new production in the spring. An energy audit was performed in order to identify key areas for energy efficiency measures. Energy consumption at the ice cream factory is a big part of the production cost. This is because:   

The ice cream mixture preparation, boiling and cooling equipment is old and inefficient; The gas-fired ovens for wafer cups production are old, manually controlled; The electrical MV/LV substation consists of outdated equipment.

The analysis indicated that complete replacement of the ice cream mixture preparation, boiling and cooling equipment, with a cost of about 245,000 USD, is the best option, with annual savings of 574,600 kWh, which means around 46,000 USD can be saved from operational expenses.

Georgia

The Company Main activities

Ice Cream Production

Region

Gurjaani, Georgia

Project Goal and Main Investments Project goals

 Replacing the old mixture preparation, boiling and cooling equipment

Main investments

 Installation of new mixture preparation, boiling and cooling equipment

Investment size

Approximately USD 245,000

Expected Results  Better usage of electricity  Modern technology line including ice cream mixture Operational preparation, boiling and cooling results  Automatic operation and control of this part of the process. Investment profitability

 Annual savings of almost 46,000 USD  Payback period of 5.3 years  An IRR of around 19% on the investment

For more information on how your company can receive financing for energy efficiency projects, visit www.energocredit.ge, or call +995 32 224962. The GEEP assignment in funded by EBRD though grant funds by: United Kingdom Sustainable Energy Initiatives Funds, Canadian International Development Agency, EBRD-Special Shareholders Fund and Early Transition Countries Funds


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.