Portfolio Elaine Lopez 2019

Page 1

e l ai n e opez p ortfolio


EDUCATION 2017-2019

Georgia Institute of Technology | Masters of Architecture

2012-2017

University Of Puerto Rico, Rio Piedras | Bachelor Of Environmental Design

2015

Cornell University, Ithaca, N.Y. | Joint Studio

2009-2012

Vocational High School | Architectural Drawing

EXPERIENCE May-Aug 2018

Niles Bolton Associates Atlanta, GA. Intern Architect Produced BIM drawings and 3D models Developed design concepts and renders Coordinated with consultants on mixed-use projects

Mar-May 2017

Coleman Davis Pagan Architects San Juan, PR. Intern Architect Site Visits |Schematic design plans|Website Management

Aug-Dec 2016

Design and Construction Office University of Puerto Rico.Intern Architect Development of construction documents and drawings Produced construction plans including interior and exterior details Analyzed and collected data of existing conditions Prepared inventory sheets with furniture and equipment

June-Dec 2015-2016

Polis Group, LLC San Juan, PR. Architecture + Interiors Intern Architecture and Interior Architecture Intern Developed design ideas and schematic drawings Produced construction drawings Created 2D & 3D visualizations Rendered 3D models and animations for project presentations


COMPETITIONS Jan 2018

Portman Studio Prize Competition

June 2016

Branching Durban Competition Exhibited in the Food and Agriculture Organization (FAO) Rome, Italy

June 2016

Laka Reacts Competition Project Selected As Promotional Material for Webpage

Dec 2016

London Public Library Competition Certificate Of Recognition Archmedium

PUBLICATIONS Mar 2019

Al-Atassi, M., Davis, C., Haltom, S., Guo, R., Peponis, J., & Wirt, E. (Eds.). (2019). Architecture description depiction . Atlanta: School of Architecture - Georgia Tech.

SKILLS

Revit Adobe Illustrator Adobe InDesign Adobe Photoshop AutoCad Lumion SketchUp Rhino MS Office


CONTENT


01

06

CONTAINED

BELTLINE BRIDGE

02

07

TEMPER

BRANCHING DURBAN

03

08

FERMOR CENTER

LONDON LIBRARY

04

09

INPLACE

UNIVERSAL HOME

05

10

Z HOUSE

COLLISION FURNITURE

P. 01-06

P. 07-08

P. 09-14

P. 15-20

P. 21-26

P. 27-30

P. 31-34

P. 35-38

P. 39-44

P. 45-46


01

CONTAINED

Design + Research Studio Spring 2019 Individual Project Professor: George Johnston This thesis challenges the way we have been thinking about architecture, and how the things we do today serve a foundation for tomorrow. I propose the design of adaptable service modules to address the housing needs of the community and to serve as frameworks for long term recovery working within existing urban fabrics. CORRUGATED STEEL ROOF INCLINED FOR SOLAR PANELS

END WALL PANEL

GLASS WINDOW

SIDE WALL PANEL

CROSS MEMBERS PLYWOOD FLOORING OVER SUBSTRATE STEEL CHANNEL STRUCTURAL FRAME

01


115

120’

115’

8

10

8

8

100’

20

8

52’

ATLANTIC OCEAN

LA TORRECILLA LAGOON

8

16

8

SITE PLAN

10

UNIT CATALOG

8

20

10

8

8

8

10

8

8

16

8

10

02 10


PHASE 1: Temporary units are deployed on site on pre-cast concrete piers

03

PHASE 2: Ground is prepared, foundations are built. Transitional units start to be installed and boundaries are established.


PHASE 3: Long term transitional units are added, installed on site and attached to the concrete foundation

PHASE 4: Houses continue to expand, existing units may change program in order to accommodate further needs

04


UNIT 1

05

UNIT 2


UNIT 3

06


02

TEMPER

Design + Research Studio Fall 2018 Individual Project Professor: John Peponis THE

COLD COLD BATH IS VERY

WIDE AND

S P A C I O U S

time.

S P A C I O U S

ON SWIM YOU HAVE A FULL PROSPECT OF THE SEA

SWIM YOU HAVE A FULL PROSPECT OF THE SEA

WALLS ARE FIXED TWO BATHING CISTERNS... AS WERE YOU

THE COLD BATH IS VERY WIDE

07

AND SPACIOUS ON

OPPOSITE

OPPOSITE

SEA

THE COLD BATH IS VERY WIDE

AND SPACIOUS ON

FULL PROSPECT OF THE

ELAINE G. LOPEZ ALSINA

WALLS ARE FIXED TWO BATHING CISTERNS... AS WERE YOU

OP

WALLS A R E F I X E D T W O B A T H I N G C I S T E R N S A S W E R E

ON

POSITE

SWIM YOU HAVE A

OP

As you walk through, the temperature changes bringing forth di˜ erent sensations. Cold. Warm. Hot. These are words used to describe the environment by its e˜ ects upon the body. Sensations relate space and feeling. Indoors. Outdoors. A transition between the absence of light and full prospects. Water and sea. Framing what is reachable and what is afar. What is serene and what is unsettled.

AND

A space between public and private. Close enough to have a soiree yet distant enough for you to lose track of

WIDE

Calm state of mind. Tranquility. Somewhere along the way from the villa to Pliny’s private apartment are the baths.

THE

BATH IS VERY

T E MPE R

POSITE

W


AS I WALK THROUGH THE VILLA TO MY DELIGHTFUL GARDEN APARTMENT ALONG

THE WAY WE FIND THE

YOU CAN SWIM AS IF YOU WERE IN THE SEA, WHILE BATHING IN THE SUN

BATHS, IDEAL FOR FRIENDLY GATHERINGS OR ENJOYING A

AT ONE END

SECLUDED AND SEPARATED FROM EVERYONE

THE LARGEST MOUNTAINS AND AT THE OTHER ENDLESS OCEAN.

THE SOUND OF SOLITUDE SO PEACEFUL YET SO LIVELY.

BOOK WITH THE MAGESTIC VIEW AND

L

VILLA RECONSTRUCTION

Temper is the reinterpretation of Pliny’s villas based on sensory experiences described in the letter to Gallus, taking temperature as topic of study. It is a preamble to the next project or it can be viewed on its own. 08


03

FERMOR STUDY CENTER

Design + Research Studio Fall 2018 Individual Project Professor: John Peponis

Located in the coast of Kardamyli, Greece the study and creation wcenter features essentially two buildings within the Patrick and Joan Fermor site. The first volume are dwellings and the second one is the maker space which extends seamlessly to a small agora upfront.

009 1


R

Towards the south side of the site is the Fermor’s house connected by a straight path to the maker building, aligned with the olive grove. Another path cuts its way through a landscape of trees of different color and shades and hugs seats in stone that look as if they emerged from the ground.

10


ERE

H TW

OS

C OU RY

R OO

O

NS

DE

R GA

VI

ND

TA

N BRA

AN

ALM

O OL FC

O LL

FU

FR

AM

IN

G

TH

E

VI

EW

S

T

AS

E RG FO

TH

IF

W

EY

E

AR

U YO

ER

LIV

E

IN

G

PA

IN

TI

NG

S

IND

A ST

RA IG HT T PA H TA KE E S M FR

S THE PATH C U T

OM TH IL E V LA

W

DIR

IT S

A Y

TO

AN D

OF ES PS IM GL

DS

SH A D ES

R WA

UG H A L ANDS CAPE OF TREES OF D IFFERE NT HU ES

T LY

RO

EC

TH

S G U H

AK E M

D

TH

A N

ER

S AT SE

ILD IN

NE O ST

BU

IN

G

11

N EE ES AR KY ES H DT AN HT LIG

LS AL EW TH H UG RO TH


SHORT SECTION 1/32” = 1ʼ-0”

SHORT SECTION SHORT SECTION 1/32” = 1ʼ-0”

SECTION A - ROOMS

SECTION A - ROOMS 1/32” = 1ʼ-0”

SECTION A - ROOMS 1/32” = 1ʼ-0”

SECTIONS

SECTION B - PATIO

ELEVATION A

ELEVATION B

SECTIONS

Descending the plaza stairs you encounter the lounge, between the chambers and study space framing the views as if it were living paintings. Submerging into the bedroom chambers the first thing you see is an indoor garden so vibrant and full of color you can almost forget were you are. Glimpses of light and the sky are seen through the walls.

12


SPATIAL EXPLORATIONS

13


14


04

INPLACE

Portman Studio Spring 2018 Team: Razan Altiraifi, Rucheng Guo Professor: Jen Pindyck Located in the heart of the Amicalola Falls, GA the proposal extends the interface between ecology and architecture into immersive technologies. This began by looking at communication methods and the transfer of information historically.

15

2”x8” WOOD PANEL HEAVY LUMBER PVDF FILM COVERD, WATER RESITANCE MAINTANCE FREE 2”X 4” WOOD STICK HEAVY LUMBER

2”X 6” WOOD STICK HEAVY LUMBER

4”X 8” WOOD STICK HEAVY LUMBER

1’ DIAMETER WOOD COLUMN HEAVY LUMBER


STRUCTURE The structure is made of the wood harvested on site. Acting as a bridge on top of the river, the project is accesed through the street onto an enclosed vessel which is the immersive space.

ROOF: EXTERNAL WOOD PANELS ON WOOD FRAMING

EXTERIOR WOOD PANELS WITH INTERIOR WOOD FINISH

WOOD COLUMNS

WOOD FLOOR DECK

WOOD FRAMING

WOOD COLUMNS

Concept model showing movement

16


CENTER FOR LAND USE

As the visitor weaves through the wooden columns, they not only feel the microenvironments but see the effect on the live data feed. For example, as they experience the difference in temperature between a shaded area and an area exposed to direct sunlight, their experience is confirmed and augmented by the data projected around them. The extraction site from which the wood comes for the construction of the center serves as a research outpost for the Center for Land Use History and Ecological Interpretation. Sensors and cameras are also placed throughout site three to collect information regarding the effects of the extraction and regrowth. This extractin site information is alsopart of the display in the enclosed immersive environment and the live data feed bridge.

17


Upon entering the enclosed immersive environment, imagery is projected on all surfaces. The visitor winds around, completely removing them from the outside environment, until they emerge to a breathtaking view of the waterfall beyond.

Looking towards the vessel

As they begin their journey, they enter the live feed bridge; seeing, smelling and hearing the natural environment around them. This experience is enhanced by live data projected throughout captured from sensors placed within the environment, reminding the visitor that this is an educational and research center.

Looking towards the waterfall 18


EXISTINGEXISTING CREEK CREEK

EXISTING EXISTING ROAD ROAD

EXISTING CONDITION EXISTING CONDITION OAK TREEOAK ZONE ; 1294 TREE ZONE ; 1294 2’-4’ diameter 50’-75’ length 2’-4’; diameter ; 50’-75’ length PINE TREEPINE ZONE ; 5907 TREE ZONE ; 5907

19

0 YEAR: CLEAR CUT CUT 0 YEAR: CLEAR HARVEST HARVEST RESEARCHRESEARCH LAB LAB

OAK: exterior materials formaterials center + for labcenter + lab OAK: exterior PINE: interior materials formaterials center + for labcenter + lab PINE: interior 2 trees left 2per acre + trees around creek trees left per acre + trees around creek

2 YEARS 2

TANAGER PRESENT

IMPACTE

They are for them i


UT

s for center + lab s for center + lab tion, treeslook around creek oak forest.

ROTATING YEARS 2 YEARS: RE-PLANT clear cut other zones for research and financial purposes TANAGER BIRD PRESENT MIGRATION ROUTE

FURTHER GROWTH ROTATING YEARS

FURTH

clear cut other zones for research and financial purposes

IMPACTED MIGRATION ROUTE They are sensitive to habitat fragmentation, look for them in large, undisturbed tracts of oak forest.

20


Z House is a mixed-building project located on South Downtown Atlanta within 50 years in the future. It focuses on urban interactions and the connectivity between the adjacent MARTA stations and Castleberry Hill.

21

EXTEND TRINITY AVE. TO BROAD ST.

EXPAND NELSON ST. RIGHT OF WAY

BROAD STREET

FORSYTH STREET

BROAD STREET

FORSYTH STREET

Advanced Building Studio Fall 2017 Individual Project Professor: Brian Bell

BROAD STREET

Z HOUSE

FORSYTH STREET

05

OP EN BUILDING AND PLAZA TO MARTA STATION


PARTI The project reimagines a city with more development and pedestrian traffic. Hence, a courtyard building with multiple entrances and a lobby that extends towards the outside for venues.

SITE PLAN DIAGRAM EXISITING PROPOSED

DW

DW WO

WO

22 OW


NELSON STREET

coffee shop

lobby

retail

retail

FORSYTH STREET

restaurant

service

BROAD STREET

retail

service

TRINITY AVENUE

LOCAL SITE PLAN 23


DW

WO

DW WO

DW WO

OW

WO

SCALE: 1/16=1’-0”

WO

3 F L OOR P L AN

3 FLOOR PLAN

DW

SCALE: 1/16=1’-0”

DW

DW

WO

WD

WO

1-2 FLOOR PLAN

1-2 FLOOR PLAN

4-5 FLOOR PLAN SCALE: 1/16=1’-0”

4-5 FLOOR PLAN

24


S HORT S E CT I O N SECTION A

SCALE: 1/16=1’-0”

LON G S E CT I ON

25 SECTION B


The stacked courtyrards allow light to flow through the building creating multiple roof terraces with peak through instances.

26


06

BELTLINE BRIDGE

Advanced Building Studio Fall 2017 Individual Project Professor: Brian Bell The bridge is located in the east side trail of the Atlanta Beltline. A steel structure that works as a shading shell which provides resting spaces inside while protecting pedestrians from the adjacent light rail.

P

O

N

C

E

L B W

27

A

L

K

W

E

A

LT

Y

L

IG IN

H

E

T

R

A

IL


R A IN C O L L E C TIN G D IA G R A M S CALE: 1 / 8 ” = 1 ’- 0” ra in w a t e r

STRU CTURA L DI A G R AM S C A LE: 1/8” = 1’ -0” comp res s io n te nsi o n l oa ds

LON G SECTI O N SC ALE: 1/8” = 1’ -0”

ST RU C T U RE D I A G R A M S C AL E : 1/ 8” = 1’ - 0”

SH O RT SE C TIO N S CALE: 1 / 8 ” = 1 ’- 0”

21 86


CONCEPT MODEL

29


30


07

BRANCHING DURBAN

Competition Studio Fall 2015 Team: Charlotte London Professor: Edgardo Arroyo, Carlos Garcia

This project branches out using natures intelligences and proposes a intimate interaction by questioning our enclosed spaces and giving the human an opportunity to spread out in life towards nature.

31


circulation car train

create the void

place structures

context

SITE ANALYSIS

connect

FORM GENERATOR

3D MODEL

32


20’

A programatic core organizes the modules to provide different living experiences. These modules were articulated in such a way that no unit is completely enclosed, nature as an active agent in the definition

green

green

25 ft2 room

store

25 ft2

100 ft2

100 ft2

Secretary 75 ft2

bathroom

living room 75 ft2

50 ft2

green bathroom

closet

green 50 ft2

2nd office

commercial/restaurant

75 ft2

50 ft2

25 ft2

closet

green

green 50 ft2

+

kitchen + dinner 75 ft2

closet 25 ft2

bathroom 50 ft2

of space.

conference room

store

bathroom

green

office

living room 75 ft2

25 ft2

+

50 ft2

75 ft2

room 100 ft2

conference room 100 ft2

storage

office 75 ft2

closet 25 ft2

green 50 ft2

bathroom 50 ft2

HOUSING UNIT

COMMERCIAL UNIT

WORK UNIT green 25 ft2 conference room 100 ft2

Secretary

store

75 ft2

bathroom

75 ft2

green

closet

green

store

2nd office

50 ft2

commercial/restaurant

closet 25 ft2

bathroom office

50 ft2

75 ft2

conference room 100 ft2

office 75 ft2

conference room

store

green 50 ft2

storage

bathroom 50 ft2

store

green

conference room

store

commercial/restaurant

store

storage

33

store

conference room

kitchen + dinner 75 ft2

20’


34


08

LPL

Competition Studio Fall 2015 Team: Isaias Rubert Professor: Edgardo Arroyo, Carlos Garcia Located in front of the Thames River the proposed library redefines the role of books and tecnology in this era by focusing on the user and their relationship with the outside.

35

SOLID VOLU ME BOOK S

DIS S OLV ES INTO THE CLO U D TRA NS PA RE NCY

P ROG RAM LIB RA RY LE IS U RE

E LE VATE D TO P RES ERV E THE E X IS TING PA RK


CONCEPT A transition from tangible to invisible based on the book as an object in contrast with the modern day technology. This is accomplished by creating a library in the core and platforms with open learning and gathering spaces. The existing park remains the same while bringing the outside to the inside.

36


GROUND FLOOR PLAN 1. FRONT DESK MACHINE ROOM 1

FIRST FLOOR PLAN 1. RESEARCH LABS 2. COFFEE SHOP

5 2 1

3. COMPUTER ROOM

4

3

4. STUDY LOUNGE 5. TERRACE

3

4

SECOND FLOOR PLAN 1. LIBRARY OFFICES

5 2 1

2. COFFEE SHOP

4

3. KIDS PLAYGROUND

6

4. AUDITORIUM 5. TERRACE

3

1

2

2 1

1

PROGRAM

EXPLODED AXON

R E S TA U R A N T

COFFEE SHOP EXPOSITION OFFICES& ARCHIVES

READING AREA COMPUTER LOUNGE PLAZA

37


The library programme is located in the core, as an independent volume which connects to the platforms.

38


09

UNIVERSAL HOME

Intermediate Architecture Design Spring 2014 Team: Studio Project Professor: Esteban Sennyey

Proposal for the Puerto Rico Assistive Technology Program (PRATP) where a model house was designed following the Principles of Universal Design and ADA from schematics through construction documents. Located in Rio Piedras, Puerto Rico.

39


STRUCTURE: L. DAZA ELECTRICAL: F. CERRATO / CAMPA & CERRATO MECHANICAL: A. DAJER / ADG ENGINEERING CIVIL: M. MARTINEZ /CONCRETEK ARCHITECTS COLABORATORS: E. LATOUR, H. CAVALLIN PRATP PROGRAM DIRECTOR: M. MIRANDA ACOUSTICS LAB: J. ROCAFORT AUDIOLOGIST: M. VICENTY INTERIOR DESIGNER: SEBASTIAN VAZQUEZ PRESIDENT NFB: A. ROLON : DESIGN:

DRAW BY:

DATE: FILE: REVIEWS:

SAN JUAN, PUERTO RICO

DESCRIPTIONS

UNIVERSITY OF PUERTO RICO

DATE

CASA UNIVERSAL

S EC TI O N B OWNER :

SEC TI O N A

FINAL DESIGN DEVELOPMENT DRAWINGS:

NUM.

TITLE: SITE SECTION

SCALE: 3/8” = 1’-0”

DRAWING PAGE:

SORT BY:

SS-1 SET TOTAL PAGE:

FLOOR PLAN The public area of the house is located at the front while the bedrooms are in the back. It has an interior garden and modular spaces that allow the user to modify the rooms according to the need. A ceiling hoist was designed in order to transport with people with limited mobility. 40


PUERTO RICO ASISTIVE TECHNOLOGY PROGRAM

UNIVERSITY OF PUERTO RICO

RIO PIEDRAS CAMPUS

SCHOOL OFASISTIVE ARCHITECTURE PUERTO RICO TECHNOLOGY PROGRAM ENVIRONMENTAL DESIGN PROGRAM ARQU 4134-002

UNIVERSITY OF PUERTO RICO

INTERMEDIATE ARCHITECTURAL DESIGN II

RIO PIEDRAS CAMPUS

UNIVERSITY OF PUERTO RICO RIO PIEDRAS CAMPUS SCHOOL OF ARCHITECTURE PO BOX 21909 SAN JU`AN PROGRAM PR ENVIRONMENTAL DESIGN 00931-1909

ARQU 4134-002 SITE: earq.uprrp.edu

INTERMEDIATE ARCHITECTURAL DESIGN II UNIVERSITY OF PUERTO RICO IMPORTANT NOTICE: RIO PIEDRAS CAMPUS PO 21909 SAN JU`AN ALL BOX DESIGNS, DRAWINGS ANDPR COPIES ISSUED BY THE 00931-1909 ARCHITECT, ARE PROPERTY OF THE ARCHITECT, AND CANNOT BE REPRODUCED OR EXHIBITED IN ANY

SITE: earq.uprrp.edu MANNER OR PLACE EXCEPT FOR THE PURPOSE OF ITS DESIGN INTENT OR BY WRITTEN CONSENT OF THE ARCHITECT. IMPORTANT NOTICE:

IF FOR ANY REASON, PART OR ALL OF THE ALL DESIGNS, DESIGN DRAWINGS AND COPIES ISSUED BY THE ARCHITECT’S IS ISSUED OR BUILT WITHOUT ARCHITECT, ARE PROPERTY OF THE ARCHITECT, HER/HIS CONSENT, THE PARTIES INVOLVED SHALLAND PAY CANNOT BE REPRODUCED OR EXHIBITED IN ANY THE ARCHITECT FEE IN FULL. MANNER OR PLACE EXCEPT FOR THE PURPOSE OF ITS DESIGN INTENT OR BY WRITTEN GENERAL CONTRACTOR NOTICE:CONSENT OF THE ARCHITECT. THE GENERAL CONTRACTOR SHALL VERIFY ALL IF FOR ANY REASON, ALL OF THEAT THE SITE DIMENSIONS, LEVELSPART , ANDOR CONDITIONS ARCHITECT’S DESIGN IS ISSUED OR WORK, BUILT WITHOUT PRIOR TO COMMENCEMENT OF THE ANY HER/HIS CONSENT, THE PARTIES INVOLVED DISCREPANCIES, EROOR OR OMISSIONS IN SHALL PAY THE ARCHITECT FEE IN FULL. DIMENSIONS, ASSEMBLIES, CONSTRUCTIVE METHODS, ELECTRICAL, MECHANICAL, PLUMBING, STRUCTURAL, GENERAL CONTRACTOR NOTICE: SITE CORDINATION AND/OR BUILDINGS CODES IN THE PLANS, SHALL BE NOTIFIED TO THE ARCHITECT IN THE GENERAL SHALL VERIFY ALL WRITTEN FORMCONTRACTOR PRIOR TO COMMENCEMENT OF THE DIMENSIONS, LEVELS , AND CONDITIONS ATFOR THEANY SITE WORK SO CORRECTIONS CAN BE MADE. IF PRIOR TOTHIS COMMENCEMENT THE WORK, ANY ARE REASON SAID ERRORS OF AND/OR OMISSIONS DISCREPANCIES, OR OMISSIONS IN NOT NOTIFIED TO EROOR THE ARCHITECT. THE GENERAL DIMENSIONS, ASSEMBLIES, CONSTRUCTIVE CONTRACTOR SHALL BE SOLELY ASSUME METHODS, ELECTRICAL, MECHANICAL, STRUCTURAL, RESPONSABILITY , FOR ANYPLUMBING, CONSEQUENCES SITE CORDINATION AND/OR BUILDINGS IN THE DERIVED FROM SUCH ERRORS AND/ORCODES OMISSIONS. PLANS, SHALL BE NOTIFIED TO THE ARCHITECT IN WRITTEN FORM PRIOR COMMENCEMENT THE AT NO TIME SHALL THE TO CONTRACTOR UTILIZEOF FOR WORK SO CORRECTIONS BE DRAWING MADE. IF FOR ANYTO CONSTRUCTION AND ANYCAN OTHER ISSUED REASON THIS SAID ERRORS AND/ORUNLESS OMISSIONS ARE HIM/HER PRIOR TO CONSTRUCTION SIGNED NOT NOTIFIED TO‘’OGPE’’ THE ARCHITECT. THE GENERAL AND SEALED BY IRREGULATIONS AND CONTRACTOR SHALL BE SOLELY ASSUME PERMITS ADMINISTRATION AND/OR THE ARCHITECT. RESPONSABILITY , FOR ANY CONSEQUENCES DERIVED FROM SUCH ERRORS AND/OR OMISSIONS.

SECTION AA

SCALE: 1/4”=1’-0”

INFORMAL CONSULTING: AT NO TIME SHALL THE CONTRACTOR UTILIZE FOR CONSTRUCTION AND ANY OTHER DRAWING ISSUED TO STRUCTURE: L. DAZA HIM/HER PRIOR TO CONSTRUCTION UNLESS SIGNED AND SEALED BY ‘’OGPE’’ IRREGULATIONS AND ELECTRICAL: F. CERRATO / CAMPA & CERRATO PERMITS ADMINISTRATION AND/OR THE ARCHITECT.

SECTION AA

MECHANICAL: A. DAJER / ADG ENGINEERING

SCALE: 1/4”=1’-0”

INFORMAL CONSULTING: CIVIL: M. MARTINEZ /CONCRETEK STRUCTURE: DAZA ARCHITECTS L. COLABORATORS: E. LATOUR, H. CAVALLIN ELECTRICAL: F. CERRATO / CAMPA & CERRATO PRATP PROGRAM DIRECTOR: M. MIRANDA MECHANICAL: A. DAJER / ADG ENGINEERING ACOUSTICS LAB: J. ROCAFORT CIVIL: M. MARTINEZ /CONCRETEK AUDIOLOGIST: M. VICENTY ARCHITECTS COLABORATORS: E. VAZQUEZ LATOUR, H. CAVALLIN INTERIOR DESIGNER: SEBASTIAN PRATP PROGRAM DIRECTOR: PRESIDENT NFB: A. ROLON M. MIRANDA ACOUSTICS LAB: J. ROCAFORT : AUDIOLOGIST: M. VICENTY DESIGN:

DRAW BY:

INTERIOR DESIGNER: SEBASTIAN VAZQUEZ DATE: PRESIDENT NFB: A. ROLON FILE: : REVIEWS: DESIGN: NUM. DATE:

DRAW BY: DATE

DESCRIPTIONS

DATE

DESCRIPTIONS

FILE: REVIEWS: NUM.

SECTION BB

SAN JUAN, PUERTO SAN JUAN, RICOPUERTO RICO OWNER :

FINAL DESIGN FINAL DEVELOPMENT DESIGN DEVELOPMENT DRAWINGS:DRAWINGS:

SCALE: 1/4”=1’-0”

CASA CASA UNIVERSAL UNIVERSAL

SECTION BB

OWNER :

TITLE:

UNIVERSITY OF UNIVERSITY PUERTO RICO OF PUERTO RICO

SCALE: 1/4”=1’-0”

ARCHITECTURAL PLANS TITLE:

SECTION CC

ARCHITECTURAL PLANS

SECTION CC

DRAWING PAGE:

SCALE: 1/4”=1’-0”

SCALE: 1/4”=1’-0” SORT BY:

A-3

SCALE: 1/4”=1’-0”

SCALE: 1/4”=1’-0” SET TOTAL PAGE: DRAWING PAGE:

SORT BY:

A-3 SET TOTAL PAGE:

PUERTO RICO ASISTIVE TECHNOLOGY PROGRAM

PUERTO UNIVERSITY RICO ASISTIVE TECHNOLOGY PROGRAM OF PUERTO RICO

RIO PIEDRAS CAMPUS

SCHOOL OF OF ARCHITECTURE UNIVERSITY PUERTO RICO ENVIRONMENTAL DESIGN PROGRAM

RIO PIEDRAS CAMPUS

SCHOOL OF ARCHITECTURE ARQU 4134-002

ENVIRONMENTAL DESIGN PROGRAM INTERMEDIATE ARCHITECTURAL DESIGN II

UNIVERSITY OF PUERTO RICO

ARQU 4134-002 RIO PIEDRAS CAMPUS

INTERMEDIATE DESIGN PO BOXARCHITECTURAL 21909 SAN JU`AN PR II 00931-1909 UNIVERSITY OF PUERTO RICO RIO PIEDRAS CAMPUS earq.uprrp.edu PO BOX SITE: 21909 SAN JU`AN PR 00931-1909 IMPORTANT NOTICE:

SITE: earq.uprrp.edu

ALL DESIGNS, DRAWINGS AND COPIES ISSUED BY THE ARCHITECT, ARE PROPERTY OF THE ARCHITECT, AND IMPORTANT NOTICE: CANNOT BE REPRODUCED OR EXHIBITED IN ANY MANNER OR PLACE EXCEPT FOR THE PURPOSE OF ITS ALL DESIGNS, DRAWINGS AND COPIES ISSUED BY THE DESIGN INTENT OR OF BYTHE WRITTEN CONSENT ARCHITECT, ARE PROPERTY ARCHITECT, ANDOF THE ARCHITECT. CANNOT BE REPRODUCED OR EXHIBITED IN ANY MANNER OR PLACE EXCEPT FOR THE PURPOSE OF ITS IF FOR OR ANYBY REASON, PART OR ALLOF OF THE DESIGN INTENT WRITTEN CONSENT THE ARCHITECT’S DESIGN IS ISSUED OR BUILT WITHOUT ARCHITECT. HER/HIS CONSENT, THE PARTIES INVOLVED SHALL PAY THE ARCHITECT FULL. IF FOR ANY REASON, PARTFEE OR IN ALL OF THE ARCHITECT’S DESIGN IS ISSUED OR BUILT WITHOUT GENERAL THE CONTRACTOR NOTICE: SHALL PAY HER/HIS CONSENT, PARTIES INVOLVED THE ARCHITECT FEE IN FULL. THE GENERAL CONTRACTOR SHALL VERIFY ALL LEVELS , AND CONDITIONS AT THE SITE GENERALDIMENSIONS, CONTRACTOR NOTICE: PRIOR TO COMMENCEMENT OF THE WORK, ANY DISCREPANCIES, EROOR OR OMISSIONS THE GENERAL CONTRACTOR SHALL VERIFY ALL IN DIMENSIONS, ASSEMBLIES, CONSTRUCTIVE DIMENSIONS, LEVELS , AND CONDITIONS AT THE SITE METHODS, MECHANICAL, PLUMBING, PRIOR TOELECTRICAL, COMMENCEMENT OF THE WORK, ANY STRUCTURAL, SITE CORDINATION AND/OR BUILDINGS CODES IN THE DISCREPANCIES, EROOR OR OMISSIONS IN PLANS, SHALL BE NOTIFIED TO THEMETHODS, ARCHITECT IN DIMENSIONS, ASSEMBLIES, CONSTRUCTIVE WRITTEN FORM PRIOR TO COMMENCEMENT ELECTRICAL, MECHANICAL, PLUMBING, STRUCTURAL, OF THE WORK SO AND/OR CORRECTIONS CANCODES BE MADE. IF FOR ANY SITE CORDINATION BUILDINGS IN THE REASON THIS SAIDTO ERRORS AND/OR OMISSIONS ARE PLANS, SHALL BE NOTIFIED THE ARCHITECT IN NOTIFIED TOCOMMENCEMENT THE ARCHITECT. THE GENERAL WRITTENNOT FORM PRIOR TO OF THE SHALL BEMADE. SOLELY WORK SOCONTRACTOR CORRECTIONS CAN BE IF ASSUME FOR ANY REASON THIS SAID ERRORS, FOR AND/OR ARE RESPONSABILITY ANYOMISSIONS CONSEQUENCES NOT NOTIFIED TO THE ARCHITECT. THE GENERAL DERIVED FROM SUCH ERRORS AND/OR OMISSIONS. CONTRACTOR SHALL BE SOLELY ASSUME RESPONSABILITY , FOR ANYTHE CONSEQUENCES AT NO TIME SHALL CONTRACTOR UTILIZE FOR DERIVED CONSTRUCTION FROM SUCH ERRORS AND/OR OMISSIONS. AND ANY OTHER DRAWING ISSUED TO HIM/HER PRIOR TO CONSTRUCTION UNLESS SIGNED AT NO TIME SHALL THEBY CONTRACTOR UTILIZE FOR AND AND SEALED ‘’OGPE’’ IRREGULATIONS CONSTRUCTION AND ANY OTHER DRAWING TO PERMITS ADMINISTRATION AND/ORISSUED THE ARCHITECT. HIM/HER PRIOR TO CONSTRUCTION UNLESS SIGNED AND SEALED BY ‘’OGPE’’ IRREGULATIONS AND PERMITS ADMINISTRATION AND/OR THE ARCHITECT.

NORTH ELEVATION

SCALE: 1/4”=1’-0” NORTH ELEVATION SCALE: 1/4”=1’-0”

INFORMAL CONSULTING: STRUCTURE: L. DAZA

INFORMAL CONSULTING: ELECTRICAL: F. CERRATO / CAMPA & CERRATO STRUCTURE: L. DAZA MECHANICAL: A. DAJER / ADG ENGINEERING ELECTRICAL: F. CERRATO / CAMPA & CERRATO CIVIL: M. MARTINEZ /CONCRETEK MECHANICAL: A. DAJER / ADG ENGINEERING ARCHITECTS COLABORATORS: E. LATOUR, H. CAVALLIN CIVIL: M. MARTINEZ /CONCRETEK PRATP PROGRAM DIRECTOR: M. MIRANDA ARCHITECTS COLABORATORS: E. LATOUR, H. CAVALLIN ACOUSTICS LAB: J. ROCAFORT PRATP PROGRAM DIRECTOR: M. MIRANDA AUDIOLOGIST: M. VICENTY ACOUSTICS LAB: J. ROCAFORT

A floor pattern system was installed

INTERIOR DESIGNER: SEBASTIAN VAZQUEZ AUDIOLOGIST: M. VICENTY PRESIDENT NFB: A. ROLON INTERIOR DESIGNER: SEBASTIAN VAZQUEZ : PRESIDENT NFB: A. ROLON DESIGN:

:

DRAW BY:

DESIGN: DATE: DATE: FILE:

DRAW BY:

along with another tactile materials. The

FILE: REVIEWS:

REVIEWS:NUM. NUM.

DATE

DATE

DESCRIPTIONS

DESCRIPTIONS

SCALE: SCALE:1/4”=1’-0” 1/4”=1’-0”

41

TITLE:

SAN JUAN, PUERTO RICO

columns. UNIVERSITY OF PUERTO RICO

SAN JUAN, PUERTO RICO

concrete slab, steel trusses, beams and OWNER : OF PUERTO RICO UNIVERSITY

FINAL DESIGN DEVELOPMENT DRAWINGS:

at the center. The structure is made of a

OWNER :

CASA UNIVERSAL CASA UNIVERSAL

SOUTH SOUTHELEVATION ELEVATION

FINAL DESIGN DEVELOPMENT DRAWINGS:

house features a small vertical garden

TITLE:

ARCHITECTURAL PLANS ARCHITECTURAL PLANS

SCALE: 1/4”=1’-0” SCALE: 1/4”=1’-0” DRAWING PAGE: DRAWING PAGE:

SORT BY:

SORT BY:

A-4A-4 SET TOTAL PAGE: SET TOTAL PAGE:


Built-in movable and rearrangable furniture.

42


43


D

D

C

C D

D

C

C

2

C

C

2 2

2

D

C

D

D C

C

D

D

S 1.1

S 1.1

S 1.1

S 1.1

44


10

COLLISION FURNITURE

Elementary Architecture Design Spring 2014 Team: Isaac Mangual Professor: Edgardo Arroyo

A chair and an ottoman, based on the number four. Made from two panels of half an inch marine plywood. It’s the result of new ways to build with wood, contrasting the lightweightness of its interior with the thickness of the frame. It can be assembled in 10 minutes and the estimated cnc cutting time is two hours.

45


The designed emerged from the testing of multiple ergonomic structures, through a variery of iterations with materials and jointing techniques. The result is a combination of marine plywood with hidden nuts and bolts inside the frame for a clean and seamless elevation.

AX O N

EL EVATI O N S 46


PERU 2014

47


48


ELAINE G. LÓPEZ ALSINA | 787-3 28-2412 |EGL .ALSINA@GMAIL .COM


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.