Tools and Resources to Assist Practitioners Achieve Victoria’s Stormwater Planning Requirements.

Page 1

Tools and resources to assist practitioners achieve Victoria’s stormwater planning requirements To add slide and view/choose layout: Home > New Slide (click on the arrow) > choose layout for new slide the you need from the various options available. To change layout of existing slide: Click on the page > Home > Layout (click on arrow) > choose alternative layout. To replace image/s in the first three master slide options: 1.

Click on the slide of the layout you want to change > View > Slide Master > Click on the grouped transparent elements > right mouse click > Send to back > click on current photo > right mouse click > change picture > then choose your photo from the location on your computer. If pasting in a photo from another document delete the current photo and paste in your new photo.

2.

Expand the pasted image to the width of the page. To fix image ratio go to the Picture Tools (Format) tab: choose the Crop tool > Fill > position image in area to suit.

3.

Click on the new photo and right mouse click > Send to back so it is behind the grouped transparent elements.

4.

To go back to your presentation: View > Normal.

5.

Click on this instruction box and delete.

Delete any slides you do not require. These slides are included as examples only.

Mandy Bolton – DELWP Petra Katona – Clearwater Caroline Chandler – E2DesignLab

OFFICIAL


State policy context for cooler, greener environments and healthier waterways • • • • •

Water for Victoria Plan Melbourne Yarra Strategic Plan Port Phillip Bay Environmental Management Plan Sustainable Water Strategies – Central Region & Gippsland region review underway

OFFICIAL

2


IWMIW IWM Framework for Victoriaa IWM Forums established for: • Each of the major waterway catchments of Greater Metro Melbourne (5) • Regional areas defined by water corporation boundaries (10) Key partners: • Local Government, Catchment Management Authorities, Traditional Owners, Water Corporations, others as relevant e.g. Victorian Planning Authority

OFFICIAL


Planning reforms – 2018 Improving Stormwater Management Advisory Committee • •

Provided report to Government with 18 recommendations Planning reforms (Oct 2018) under Amendment VC154: • Broadened types of developments required to meet stormwater management requirements • New IWM clause in Planning Policy Framework OFFICIAL

4


Victoria’s stormwater planning requirements

Since 2006 • Residential subdivision Since 2017 • Apartments Since 2018 • Residential multi-dwellings (e.g. townhouses) • Commercial subdivisions and developments • Industrial subdivisions and developments • Public use developments OFFICIAL

5


Capacity building initiatives underway by DELWP

Training and information sessions • 24 information sessions have been delivered statewide to an audience of over 1100 people Resources • DELWP stormwater planning website, checklists and guidance • Online Navigator Tool Resource Portal

OFFICIAL

Developed in partnership between DELWP and Clearwater 6


DELWP resources: website, checklists and example development scenarios Stormwater webpage for urban developments Stormwater report checklists – handy compliance reference for applicants and assessors 1. Subdivision 2. Buildings and works Example development scenarios - cross reference checklists and provide further detail and resources 1. Non residential building and works (such as commercial/retail) 2. Medium to high-density residential building and works (such as apartments) 3. Multi-dwelling building and works (such as townhouses) 4. Non-residential subdivision OFFICIAL

7


Online Navigator Tool Resource Portal

• Decision support tool to assist planning system users identify stormwater management requirements set out in VPPs • Non statutory guide, supported by checklists and context specific guidance • Links to DELWP checklists and example development types • Links to additional resources (e.g. EPA, Melbourne Water, local council) • Outlines site management and asset maintenance requirements • Launched in March 2021 – online webinar OFFICIAL

8


Portal Development Milestones

March 2021

Draft Content Testing

© copyright clearwater / clearwatervic.com.au

Web creation and upload

User Acceptance Testing #1

User Acceptance Testing #2

LAUNCH


Online Navigator Tool Resource Portal 1/2

© copyright clearwater / clearwatervic.com.au


Online Navigator Tool Resource Portal 2/2

https://clearwatervic.com.au/resource-library/toolkits/stormwater-planning/

Contact: info@clearwatervic.com.au © copyright clearwater / clearwatervic.com.au


KEY RESOURCES IWM CHECKLISTS AND DEVELOPMENT SCENARIOS


Key resources ∕ Stormwater checklists: compliance references for applicants and assessors ∕ Example development scenarios: four worked examples of a stormwater report ∕ IWM Case studies for Fishermans Bend: worked examples for four typical development typologies

Statewide requirements

Precinct specific IWM requirements


Stormwater Checklists

Applicant checklist for Integrated Water Management (IWM)

Content Proposed Development description Site layout, catchment areas and WSUD treatment systems Hydraulic calculations / Modelling and compliance Design for best practice environmental management (BPEM) for urban stormwater Cooling and amenity Concept design considerations Site management plan Asset Maintenance Program


Example Development Scenarios


Relevant stormwater planning requirements

16


Proposed Development Description

17


Site layout, catchment areas and WSUD


Modelling and compliance

19


Cooling and Amenity

20


Concept and functional design

21


Site management

22


Asset maintenance

23


Relevant links

24


Other relevant resources

25


IWM Case Studies

IWM Case Studies for Fishermans Bend Development typologies 1. Multi-level, mixed use residential development with podium 2. Multi-tower, mixed use residential development with podium 3. Commercial development in the employment precinct 4. Large townhouse development


Precinct specific IWM requirements

Third pipe

Rainwater tanks

Fit for purpose treatment

Green Star rating

Onsite greening

Use of recycled water

Connection and inspection


Case Study Format Sustainability Management Plan

Case Study Format

A. Development description B. Site Layout, catchment and IWM systems C. IWM Modelling and Compliance D. Functional Design considerations E. Green Star Response F. Green Infrastructure: Green Factor Response G: Construction H: Commissioning I: Asset Maintenance

Applicant checklist for Integrated Water Management (IWM) in Fishermans Bend


Multi tower mixed use development with podium

IWM Response and Recommendations

Large townhouse development


IWM Response and Recommendations

Mixed Use Development with Podium Legend


Further Information

Online Navigator Tool Resource Portal: https://clearwatervic.com.au/resource-library/toolkits/stormwaterplanning/

Stormwater Management for Urban Development (DELWP): https://www.water.vic.gov.au/liveable/stormwater/Stormwatermanagement-for-urban-development

© copyright clearwater / clearwatervic.com.au


Questions

OFFICIAL


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.