3DSketch

Page 2

A Selection of Projects Redevelopment of the Post Office in Cirencester, 2007 Design Leader involved in the design development, detailing. Cost; £2 Million Client: Kier Construction St Peter’s Baptist Church, Worcester, Worcestershire, 2005 – 2006 Design Leader involved in the design development, detailing and supervision of a new church; Cost £3 Million. Client: St Peter’s Baptist Church Majestic Wine Warehouse, Chippenham, Wiltshire, 2003 – 2004 Design Leader involved in the design, detailing and supervision of a new retail outlet. Cost £0.5 Million. Client: Edmont Construction Bell Field, Luckington, Wiltshire, 2003 – 2004 Design Leader involved in the design, detailing and supervision of a group of 11 new dwellings. The project was situated in a Conservation Area. Cost £2 Million Client: Colburn Homes Napier House, Headington School, Headington, Oxford 2001 – 2002 Design Leader involved in the design, detailing and supervision of a new Boarding house for Headington School. This was a three storey Timber Frame building in a Conservation Area. Cost £0.5 Million Client: Headington School Bristol & West Call Centre, Stoke Gifford, Bristol 1999 – 2001 Design Leader involved in the design, detailing and supervision of a new office block to accommodate the call centre for a Building Society. Cost £3 Million. Client: Bristol & West Dalehead Foods, Ashton Under Lyne, Manchester 1999 – 2001 Design Leader involved in the design, detailing and supervision of major extension to an existing abattoir; Cost £7 Million. Client: Dalehead Foods Century City, Cape Town, South Africa 1998 – 1999 Job Captain involved in the design, detailing and supervision regional shopping complex. This shopping centre was situated on the outskirts of Cape Town and was part of a larger development that included a Casino and Fun fair. I worked in a team of 20 Architects and was responsible for the central shopping arcade and two office blocks. Cost R1,4 Billion (£140M) Client: Shopping Centre Consortium Tonga Hospital, Mpumalanga, South Africa 1996 – 1998 Project Architect involved in the design, detailing and supervision of 450 – bed hospital serving a population of 130 000; Floor space 24 000 sqm. The project included staff housing, crèche facilities and recreation centre. I worked in a team of 2 architects and a technician and was responsible for the initial design, production drawings and detailing cost R140 Million (£14 M) Client: Mpumalanga District Council


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.