at Movement Center
Schematic Design Package
Burgess Design Studio
Center City Church
30 November 2015
at Movement Center
Office 251.8 SF Storage 249.6 SF
Preliminary Occupancy Calculation "Sanctuary" Space Seating 2086 SF net / 7 = 298 Occupants
Mech. 8.8 SF
Riser 552.8 / 15 = 37 Occupants Storage 1005.6 SF / 300 = 4 Occupants
Storage/back of stage 583.3 SF
AV Booth 126 SF = 3 Occupants
Riser 552.8 SF
Floor Finishes Floor A Existing concrete sealed - Epoxy/Urethane System Alternate - existing concrete stained and sealed
Office 251.8 SF / 100 = 3 Occupants Coffee Serving 224 SF / 200 = 3 Occupants
Storage tables and chairs 52.8 SF
Floor B Carpet - rolled
Storage 16.4 SF
Total Occupants = 399 Occupants
Ceiling Systems Ceiling A Exposed structure painted black, AV Consultant to advise on Acoustical treatment of Steel Deck - Assumed but not shown in these schematic drawings (new ridged or batt insulation -R value TBD) set in between steel bar joist tight to steel deck covered with prefinished with acoustically transparent paint or wrapped fabric (black) 2” thick acoustical mineral fiberboard panels with finished sides, clipped to structure and tight to bottom of insulation creating minimum sandwich depth.
Wall Type 01 Sound Wall - 3 5/8”metal studs, RC-1 channel (5 places), Padding Tape all channels, ¼” closed cell acoustical foam mat (cemented to soundboard back), Sound Deadening Board, Mass Loaded Vinyl (MLV) (stapled to sound deadening board), 5/8” Gypsum “firecode” wallboard, sitting on 2” vibration pads, Floor gap filled with caulk, drywalls screws do not penetrate to studs, ¼” gap at corners and ceiling (steel deck and steel structure) filled with acoustical caulk interleaving of ¼” gaps at corners, SSP metal tape over seams of sound board, sound-board joints butters with caulk, stagger joints in sound-board, Mass Loading Vinyl and Wall board as not to align. (See illustration)
Ceiling C Floating Ceiling Cloud - Acoustical ceiling tile, mineral fiber, 24x24, Armstrong Ultima square edge lay-in 15/16” or equal with aluminum trim perimeter ½”w x 3”h;
Mech. 16.3 SF
Lobby 760 SF / 15 = 51 Occupants
Wall Types
Ceiling B Existing steel roof deck, exposed, cleaned, painted to match exposed painted steel structure
Floor C Carpet - tiles
Storage Table and Chair 81.5 SF
Plumbing Fixture count to support Church Use 399 / 2 = 200 M 200 F
Wall Base WB-01 Vinyl Base 4”
200M / 150 = 1.33 Fixtures Male 200 F / 75 = 2.66 Fixtures Female
WB-02 Wood Base Painted ¾”x7 ½” – Pine or Popular (not MDF due to mopping of hard floor finishes)
Seating non fixed 2,086 SF NET
BurgessDesignStudio
Mechanical
Finishes and System Descriptions
Wall Type 02 3 5/8”’ metal studs 5/8” gypsum drywall each side extended and finished to bottom of steel deck Wall Type 03 3 5/8” metal studs 5/8” gypsum drywall each side extended and finished to 10' 0" a.f.f. Wall Type 04 Existing metal Stud wall – add sound batt insulation, one layer of 5/8” drywall with tape and mud
PO Box 1194 Davidson NC 28036 704 895 8110
Zone 1 Multi-Purpose room (400+ people) Zone 2 Stage area (stage lighting, 5-10 people plus electrical music equipment) All duct work in zone 1 and 2 is exposed painted black, oversized to reduce noise, insulation and 90 degree elbows to acoustically isolate space for units startup noise and fan noise, ductwork to run along perimeter (north and south on the page) with no duct work above or in front of the stage in order to maximize view of Video screens mounted at maximum height Oversized ducted return at minimal length with insulation and 90 degree elbows to reduce sound from units and fans Zone 1 and 2 Low velocity air movement to minimize disturbance of haze and maximize “hang time” of haze for lighting effects NOTE for fire alarm system – Haze Generators maybe in just during worship and or other music events Zone 3 Lobby and Lobby/meeting – exposed ductwork painted black, ductwork to run along perimeter – Minimal ducted return Zone 4 Back of House – exposed ductwork painted black Zone 5 Office and Classroom suite - exposed ductwork painted black
General Notes: The Package is conceptual in nature and at this phase of development there maybe conflicting in information. These sheets are to scale when printed at 24X37
Wall Type 05 Areas of existing exposed brick wall cleaned and unpainted – East Wall in Multi-Purpose and Back of Stage areas - with areas of insulated 3 5/8" stud wall covering most of exposed brick AV Acoustical analysis may require sound insulation panels of specified thickness and materials Wall Type 06 Exposed areas of Existing exterior masonry wall - cleaned and unpainted
Paint Finishes Paint-01 Eggshell - rolled - color Black or other dark color TBD in Multi-Purpose
Storage 13.2 SF
Paint-02 Open ceiling areas in lobby, multi-purpose and back of stage – spray on structure, HVAC duct work, exposed electrical conduit and junction boxes and all other exposed cables and conducts allowed to be painted by code. Applied before install of acoustical ceiling panels - Color Black or other dark color TBD
Elec. Dimmer Panels 28.6 SF AV Booth 126 SF
Door and Frame types Frame Types - 2” 16 Ga. hollow metal painted Door Types – 1 ¾” Solid Core Wood Veneer plane sliced select birch with stain finish 3’0” x 7’0”. Sidelites 3’w x 7’h
Paint-03 Eggshell - rolled - color white
Lobby 760 SF
Paint-04 Eggshell - rolled - color Accent Color Paint-05 Open ceiling areas – spray on structure, HVAC duct work, exposed electrical conduit and junction boxes and all other exposed cables and conducts allowed to be painted by code. Applied before install of acoustical ceiling panels - Color White or color to match base building esposed common areas
Coffee Serving 224 SF
11/19 /15
Sliding doors at table and chair storage – 1 1/2" x 3’6 x 7’ Wood Veneer plane sliced select birch with stain finish on overhead track sliding hardware system, thumb latch at bottom, recessed finger pulls, not lockable
Preliminary Occupancy Calculations
Finishes and Systems by Room/Area Room 123-01 Multi-Purpose Ceiling - Ceiling A Floor – Floor A Walls (note north is down on page)
Scope of Work of Services and Elements provided by Church Provided by and installed by Center City Church 1) Lobby Display/Branding wall in lobby Contractor it install continuous 1/2" plywood in wall blocking between metal studs and finished drywall for mounting of display wall final area and size of display to be determined 2) Portable riser/stage system 3) Purchase and Install of Furniture 4) Security Alarm System - Provided by and installed by church hired Consultant; Contractor to coordinate install, concealment of conduct and wiring, Contractor to provide power as required, Contractor to provide routing coordination and painting of exposed parts and conduits as in keeping with other similar systems and parts 5) Window Treatment in Greenroom Deduct alternates for services provided by Church 1) Painting of lobby walls 2) Painting of Office suite walls 3) Painting of Back of Stage walls 4) Construction of storage cages at Back of Stage area 5) Floor Finish in Office Suite Provided by and Installed by AV Design Build Consultant 1) Video Projectors - Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant 2) Operable video screens - Contactor to provide power to location as required by screens 3) Stage Lighting - Contractor to provide clean power and data conduit with pull string if required, Location and Requirements as specified by AV Design Build Consultant 4) Lobby Video Monitors (assumed 3), Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant 5) Green Room Video Monitor, Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant 6) AV Booth Equipment, Contractor to provide AV Booth per design with clean power and data conduits with pull string, Location and Requirements as specified by AV Design Build Consultant 7) Vocalist Reference Video Monitor above AV Booth, Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant Acoustical Treatments in Multi-Purpose Room Acoustical design of multi-purpose to be by AV Consultant, Procurement Fabrication and installation of Acoustical treatment by Contractor Sound Isolation Sound Isolation recommendations to be by AV Consultant. Sound walls and sound isolations systems to be by Contractor
West (New corridor wall) Existing wall acoustically seal drywall to steel roof deck and structural penetrations, acoustically seal any electrical or other penetrations in wall, add Sound insulation and 1 layer of Drywall, with 1” space add second Wall Type 01 drywall Finish – Paint-01, Wall Base - WB-01 North (adjacent to Lobby wall) Wall Type 03 Wall Type 03 Paint-04 South (Stage Backdrop wall) Wall Type 01 WB-01Paint-01 East (Existing Brick wall) Wall Type 06 varying sizes placed on wall in patterns to allow with exposed brick areas between some panels –electrical boxes and conduits dropped from above at each section of drywall panels as to not cross exposed section of brick wall Doors Existing Base building doors in East Wall Add acoustical treatments as allowed by door rating, continuous seal on door stops, jambs and head and acoustically sweep All other doors into room 123-01 (except closets) Solid Core 1¾” wood veneer door Automatic door bottom sweeps, Sound absorbing neoprene door jams for the vertical sides and top of the door, Acoustical door astragals Existing sprinklers lines and heads Raise main sprinkler line running north south to bottom of steel beam, secondary lines running east west as required running in between webs of bar joist as to be higher than main line as much as possible, minimize head drops as much as possible, however head locations must coordinate with video projectors, video screen, stage lighting, and mechanical ductwork along perimeter of room.Table and chair storage “closets” are screen walls with sliding panel doors, without ceilings and are open to the multi-purpose ceiling (top of wall at approximately 10' 1” above finish floor. bottom of steel deck approximately 12' 10 " a.f.f.) HVAC Five Zones Total – Zone 1 main room (400 people) – Zone 2 Stage area (stage lighting, 5-10 people plus electrical music equipment) Zone 3 Lobby and Coffee Serving – All duct work in these areas round exposed painted to match exposed steel structure/metal deck etc..., oversized to reduce noise, insulation and 90 degree elbows to acoustically isolate space for units startup noise and fan noise, ductwork to run along perimeter of room, with no duct work above or in front of the stage in order to maximize view of video screens mounted at maximum height Low velocity air movement to minimize disturbance of haze and maximize “hang time” of haze for lighting effects. Zone 4 Back of Stage Area - Green room, Music Equipment Storage, Corridor and Open wire cage storage, exposed round ductwork painted to match painted exposed steel structure/metal deck. Zone 5 Office/Classroom Suite - Open Office Area and Two Conference/classrooms ceilings open to structure with suspended acoustical ceiling floating "clouds". round exposed painted ductwork to match painted steel structure/metal deck above.
NOTE for fire alarm system – Haze Generators maybe in just during worship and or other music events Electrical Requirements Multi-purpose general electrical outlets are to be separated from electrical outlets for video equipment, projectors, wall mounted TVs and Flat screens and all electrical power drops to serve the stage, Music Equipment room and computers and sound board Multi-purpose Electrical outlets for video equipment, projectors, wall mounted TVs and Flat screens and all electrical power drops to serve the stage, Music Equipment room and computers and sound board are to be “clean Power” drops free from noise from Multi-Purpose general room dimmers and Stage Lighting dimmers. See Plans for (CP) Clean Power symbols and locations. Lighting Main Room General room lighting – evenly space and centered between bar joist, dimmable LED pendant down light as tight to bottom of bar joist as possible – computer operated dimmer system from AV booth and with presets (minimal of 4) in wall mounted panels/plates Lighting Stage Light Fixtures and Lighting trusses not included in contract/pricing (N.I.C.), Dimmer panels in dimmer closet N.I.C. Included in pricing are electrical conduit and Junction boxes mounted to steel deck and bar joist as required for stage lighting system, conduct to and from dimmer panel closet (123-13) as required
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Video Projectors Two ceiling mounted “clean power” electrical junction boxes and data drops (By AV design build consultant - not including in pricing) Video Screens Two operable projection screens (By AV design build consultant - not including in pricing) Sound System (By AV design build consultant - not including in pricing) AV booth Stage IntelliStage system – portable 4’x4’ panels 8” or 16” height (By Church - not including in pricing)
Schematic Design Package DESCRIPTION
Schematic Design General Information ISSUE
30 November 2015
A0.00
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1
2
4
3
5
A
B
Remove section of Wall to allow new continuous sound wall
Remove existing door and frame
Remove section of Wall to allow new continuous sound wall
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
C
Remove section of Wall to allow new continuous sound wall
PROJECT New door opening
Remove existing door and frame
Center City Church at Movement Center
Remove section of Wall to allow new continuous sound wall D
Opening for new entry to church lobby from corridor
Remove section of storefront to add new double 3'0" storefront doors
Schematic Design Package DESCRIPTION
Floor Plan ISSUE
30 November 2015
N
A
Floor Plan - Demo
01
scale: 1/8" = 1' 0"
A0.01
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1
4
3
2
5
23'-0"
5
5
music equip storage
5
6
Green Room/Office
1
123-05
123-04
2
2 1
12'-1/4"
3
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
2
3
Cage Storage
elec
123-08
5
mech
2
2
sound proof room
123-07
Corridor 123-03
123-06
1
2
45'-10 1/2"
6
4
4
1
A
6
3
1
6
3
5
4
Table/Chair Storage 123-09
20'-0"
4
B 2
Classroom A 124-02
5
Sliding door panels typ side storage closets
32'-0"
Open office 124-01 2
4 1
storage 123-10
3
75'-11 1/4"
abandoned elevator shaft below
2
4
1
2
6
C
Corridor 124-04
Multi Purpose 123-01
6
open above to mutli-purpose
4
Skylight left exposed with new protective barrier or sloping wall to prevent occupation of this area
CLIENT Table/Chair Storage 123-11
Sliding door panels typ side storage closets
29'-8"
6
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Classroom B 124-03
4
32'-0"
5
PROJECT open above to mutli-purpose
New door in existing wall
3
1
Center City Church at Movement Center
10'-6"
6
2
123 -13
6
D
Dimmer Panel Closet
4'-6 3/4"
storage 123-12 1
6
2 1
6
Lobby
27'-8 3/4"
123-02
1
5
Schematic Design Package DESCRIPTION
6
Floor Plan 5
6
ISSUE
30 November 2015
New double clear glass doors in existing storefront wall system
N
A
Floor Plan
02
scale: 1/4" = 1' 0"
A0.02
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1
music equip storage
4
3
2
5
Green Room/Office
123-05
123-04
elec
123-06
123-08
Cage Storage Cage Storage
mech
sound proof room
123-07
Corridor 123-03
123-06
AV booth
A
Worship Platform Table/Chair Storage
B
Classroom A 124-02
Sliding door panels typ side storage closets
Open office 124-01
Corridor 124-04
Multi Purpose 123-01
abandoned elevator shaft below
Skylight left exposed with new protective barrier or sloping wall to prevent occupation of this area
open above to mutli-purpose
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
C
Classroom B 124-03
PROJECT open above to mutli-purpose
New door in existing wall
Center City Church at Movement Center
Sound booth Steel mesh "cage and doors" on welded 2" steel angle frame doors lockable with pad locks
123 -13
Dimmer Panel Closet
D
Lobby
123-02
Branding/Mission display Wall
Schematic Design Package DESCRIPTION
Furniture Plan ISSUE
30 November 2015
New double clear glass doors in existing storefront wall system
N
A
Floor Plan
03
scale: 1/4" = 1' 0"
A0.03
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1
4
3
2
5
ACT Ceiling Cloud
music equip storage
Green Room/Office
123-05
123-04
mech
123-08
elec
Cage Storage
123-07
Corridor 123-03
Mech. ductwork exposed
123-06 open above to mutli-purpose
House Lighting A
Table/Chair Storage
Projection Screen
B
Classroom A 124-02 Open office 124-01
Speaker Mains storage
Corridor 124-04
Stage Lighting system
Multi Purpose 123-01 C
Mech. ductwork exposed
CLIENT
Classroom B 124-03
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Sprinkler Line
PROJECT Sprinkler Main
Center City Church at Movement Center
123 -13
Dimmer Panel Closet
D
Lobby
Branding/Mission display Wall
123-02
Special lighting mr16 pendant spot (15 fixtures) on track/cable system
Schematic Design Package DESCRIPTION
Ceiling Plan ISSUE
30 November 2015
N
A
Ceiling Plan
04
scale: 1/8" = 1' 0"
A0.04
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
back of house supply
CP
zone 4
Green Room/Office
CP
music equip storage back of house return
123-05
123-04
CPCP
CPCP
music equip storage 123-04
Green Room/Office 123-05
Cage Storage
123-06 CPCP
CP CP
Worship Platform
zone 2
zone 2
Table/Chair Storage
stage supply
stage supply
A
stage supply
stage return
stage return
Cage Storage 123-06
elec elec 123-08 123-08
stage supply
mech mech
123-07 123-07
Corridorzone 2 Corridor 123-03 123-03
CP CP
5
Sliding door panels typ side storage closets
B office suite supply
CPCP
4
3
2
CPCP
CPCP
1
Classroom A 124-02 Open office 124-01
storage
Multi Purpose 123-01
office suite return
Corridor 124-04
Open office 124-01
CP
zone 5 multi purpose return
Main Room supply
CP
CP
zone 1
Table/Chair Storage
CP
Main Room supply
C
Classroom B 124-03
office suite supply
Multi Purpose 123-01
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
zone 1
PROJECT Table and chair storage spaces open above to multi-purpose
storage
CP
PC
PC
PC
AV booth
zone 1
PC
123 -13
PC
D
Main Room Return
PC
PC
at Movement Center
Dimmer Panels
CP
Center City Church
CP
PC
PC
CP
Lobby
lobby return
123-02 zone 3
CP
CP
lobby supply
Schematic Design Package DESCRIPTION
HVAC and Power Plan
Coffee Service
CP
CP
ENTRY
ISSUE
30 November 2015
N
A
HVAC and Clean Power Diagram
05
scale: 1/8" = 1' 0"
A0.05
1
1
2
2
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Portable Riser 12' x 28' - installed by Church
Sub speakers on floor, one each side of riser Installed by Design-Build AV Engineer
D
D
Protable Stage 8" or 16" risers
Projection screen one each side Installed by Design-Build AV Engineer
Table Chair Storage
Center Line of Stage
Main Speakers suspended from structure Installed by Design-Build AV Engineer
Storage Closet
Stage Lighting System Installed by Design-Build AV Engineer
Table Chair Storage
Multi-purpose 124-01
CLIENT
D
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
D
PROJECT
Center City Church at Movement Center
C A20
D A20
Storage Closet
Sound booth - Steel expanded mesh "cage and doors" Mesh Weldon on welded 2" steel angle frame welded together operable front panels and doors, doors lockable with Combination pad locks, front panels secured from inside
Schematic Design Package DESCRIPTION
Enlarged Multi-Purpose Dimmer Panel Closet
D
A A20
N
A
Enlarged Floor Plan Multi-Purpose
06
scale: 1/4" = 1' 0"
ISSUE
30 November 2015
D
B A20
B 06
Enlarged Ceiling Plan Multi-Purpose scale: 1/4" = 1' 0"
A0.06
New HVAC Roof Units Zone 3 Return
BurgessDesignStudio
Zone 3 Supply
PO Box 1194 Davidson NC 28036 704 895 8110
Steel Roof Deck Steel Bar Joist Steel Beam Main Sprinkler Line
House Lighting
Table and Chair Storage
0'-0" a.f.f. 1st flr
D
Interior Elevation - Looking at Stage
08
scale: 1/4"=1' 0"
Steel Bar joist Steel Beam 1'-2 1/2"
New Roof Top HVAC Units House Lighting
2'-0"
Steel Bar Joist Steel Beam Mechanical Ductwork tight to bottom of steel beam Zone 1 Supply Sprinkler piping
10'-1"
+10'-9"
Main Sprinkler Line AV Booth
0'-0" a.f.f. 1st flr
C 07
Section/Interior Elevation - looking West at table and chair storage wall
CLIENT
scale: 1/4"=1' 0"
House Lighting
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Steel Bar Joist
PROJECT
Center City Church at Movement Center
AV booth
0'-0" a.f.f. 1st flr
B
Section/Interior Elevation - looking West at table and chair storage wall
07
scale: 1/4"=1' 0"
Storage Closet
Mechanical ductwork
Sliding Door at Table and Chair storage
Storage Closet
All electrical conduct drops from above and electrical boxes contained in drywall section, no horizontal routing of conduct between drywall sections
Schematic Design Package DESCRIPTION
Multi-Purpose Elevations ISSUE
30 November 2015
0'-0" a.f.f. 1st flr
A
Section/Interior Elevation - looking East at brick wall
07
scale: 1/4"=1' 0"
Exposed Brick Area
8" Wood Wall Base PTD
Drywall Wall Section, Insulated, PTD
Brick Structural Pier
A0.07
New HVAC Roof Units Zone 4 Return
BurgessDesignStudio
Zone 4 Supply
PO Box 1194 Davidson NC 28036 704 895 8110
Steel Roof Deck Steel Bar Joist Steel Beam Main Sprinkler Line
House Lighting
Table and Chair Storage
0'-0" a.f.f. 1st flr
D
Interior Elevation - Looking at stage wall
08
scale: 1/4"=1' 0"
F 08
Interior Elevation - Looking at stage Stage backdrop By Church not including in GC pricing
scale: 1/4"=1' 0"
Riser By Church not included GC in pricing
Video screen, video projectors, speaker mains and sub-speakers provided and installed by Design built AV consultant
Steel Bar joist Steel Beam 1'-2 1/2"
New Roof Top HVAC Unit
House Lighting
2'-0"
Steel Bar Joist Steel Beam Mechanical Ductwork tight to bottom of steel beam Zone 1 Supply Sprinkler piping
10'-1"
+10'-9"
Main Sprinkler Line AV Booth
0'-0" a.f.f. 1st flr
C 08
Section/Interior Elevation - looking at AV booth in closed position
E 08
scale: 1/4"=1' 0"
Section/Interior Elevation - looking at AV booth in open position scale: 1/4"=1' 0"
AV booth in open position
House Lighting
Steel Bar Joist
Lobby Beyond
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
AV booth
0'-0" a.f.f. 1st flr
B
Section/Interior Elevation - looking West at table and chair storage wall
08
scale: 1/8"=1' 0"
Storage Closet
Mechanical ductwork
Sliding Doors at Table and Chair storage
Storage Closet
New HVAC rooftop units - Zone 1 All electrical conduct drops from above and electrical boxes contained in drywall section, no horizontal routing of conduct between drywall sections
Schematic Design Package DESCRIPTION
Multi-Purpose Worship Elevations ISSUE
30 November 2015
0'-0" a.f.f. 1st flr
A
Section/Interior Elevation - looking East at brick wall
08
scale: 1/8"=1' 0"
Exposed Brick Area
8" Wood Wall Base PTD
Drywall Wall Section, Insulated, PTD
Brick Structural Pier
A0.08
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Lobby
AV Booth Green room
Storage Cages
Basement Level
CLIENT
B
Section/Perspective
09
scale
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Stage Lobby
AV Booth
Multi-Purpose
Schematic Design Package DESCRIPTION
Multi-Purpose Section/Perspectives ISSUE Basement Level
A
Section/Perspective
09
scale
A
Sectional Perspective of Worship Setup
06
scale: 1/8"=1' 0"
30 November 2015
A0.09
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Schematic Design Package DESCRIPTION
Multi-Purpose Section/Perspectives ISSUE
30 November 2015
A
Sectional Perspective of Worship Setup
06
scale: 1/8"=1' 0"
A
Section/Interior Elevation - looking at Stage
10
scale: 1/8"=1' 0"
A0.10
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
B
Aerial view of stage
D
Aerial view of AV booth in open position
11
scale:
11
scale:
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Schematic Design Package DESCRIPTION
Multi-Purpose Worship Perspectives ISSUE
30 November 2015
A
Aerial view of stage and storage wall
11
scale:
A0.11
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
B
View from Worship Stage
D
View of Entry into Worship
12
scale: 1/8"=1' 0"
12
scale: 1/8"=1' 0"
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Schematic Design Package DESCRIPTION
Multi-Purpose Worship Perspectives ISSUE
30 November 2015
A
View from AV Booth
12
scale: 1/8"=1' 0"
A0.12
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
B
Perspective of Worship Setup
D
Perspective of Banquet Setup
13
scale:
13
scale:
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Schematic Design Package DESCRIPTION
Multi-Purpose Layouts ISSUE
30 November 2015
A
Perspective of Rectangular Table Setup
C
Perspective of Rectangular Table Setup
13
scale:
13
scale:
A0.13
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Room 123-02 Lobby Ceiling - Ceiling A and Ceiling C Floor – Floor A Walls (note north is down on page) West (New corridor/office wall) Existing wall acoustically seal drywall to steel roof deck and structural penetrations, acoustically seal any electrical or other penetrations in wall, add Sound insulation and 1 layer of Drywall, with 1” space add second Wall Type 01 drywall Finish – Paint-01, Wall Base - WB-01 North (exterior wall storefront system and masonry and metal stud) WB-01 Paint-03 on drywall New Storefront Doors South (adjacent to Multi-Purpose) Wall Type 01 with continuous layer 1/2 plywood between studs and drywall for display attachment WB-01 Paint-04 Main Church interior signage, exhibit display system, provided by and installed by church East (Existing Brick wall) Wall Type 06 with continuous layer 1/2 plywood between studs and drywall for display attachment WB-01 Paint-03 Main Church interior signage, exhibit display system, provided by and installed by church
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204 1
2
1
2
Sound Control Wall D
D
PROJECT
3'-5"
Existing Common Corridor
Dimmer Panels 123-13
Multi-purpose 124-01
Center City Church at Movement Center
Special lighting mr16 pendant spot (14) on track/cable system
Pendant Industrial themed Cage Lighting Branding/Mission display wall By Church Mounting blocking in wall by contractor
C A20
New Doors Rooftop HVAC Unit
D A20
26'-11"
14'-4"
House Lighting
Bar joist Lobby 124-02
Schematic Design Package
Exposed Ductwork
DESCRIPTION
Enlarged Lobby
New Store Front Doors
9'-2"
ISSUE Coffee Service Area
A A20
N
30 November 2015
ENTRY
B A20
A
Enlarged Lobby Floor Plan
B
Enlarged Lobby Ceiling Plan
01
scale: 1/4" = 1' 0"
14
scale: 1/4" = 1' 0"
A0.14
New Roof Top HVAC Unit Zone 3, Contractor to coordinate with building owner to provide screening of unit if required by zoning, or building owner Sprinkler piping
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Steel Bar Joist
Exposed HVAC Ductwork
Coffee Serving Area 0'-0" a.f.f. 1st flr
D
Interior Elevation - Lobby Branding Wall
15
scale: 1/4"=1' 0"
New Storefront doors New HVAC units beyond
Lighting
Sprinkler pipe with heads Sprinkler Main pipe, relocated to light below steel beam MR16 pendant display lighting on track system
Branding/Display wall with continuous blocking
0'-0" a.f.f. 1st flr
C 15
Interior Elevation - Lobby Branding Wall
CLIENT
scale: 1/4"=1' 0"
New HVAC rooftop unit
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Front Face of Building
PROJECT
Center City Church
Sprinkler Main Pipe
at Movement Center
Existing storefront and door
0'-0" a.f.f. 1st flr
B
Section/Interior Elevation - looking West at table and chair storage wall
15
scale: 1/4"=1' 0"
Schematic Design Package DESCRIPTION
Lobby Elevations MR16 display lighting
ISSUE Display/Branding Wall
30 November 2015
Sound Wall
Display wall with continuous plywood blocking
0'-0" a.f.f. 1st flr
A
Section/Interior Elevation - looking East at brick wall
15
scale: 1/4"=1' 0"
A0.15
New Roof Top HVAC Units, Contractor to coordinate with building owner to provide screening of unit if required by zoning, or building owner Sprinkler piping
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Steel Bar Joist
Exposed HVAC Ductwork
Lobby Video Monitors
Coffee Serving Area 0'-0" a.f.f. 1st flr
D
Interior Elevation - Lobby Branding Wall
16
scale: 1/4"=1' 0"
New Storefront doors New HVAC units beyond
Lighting
Sprinkler pipe with heads Sprinkler Main pipe, relocated to light below steel beam MR16 pendant display lighting on track system
Branding/Display Branding/Display wall with continuous blocking
0'-0" a.f.f. 1st flr
C 16
Interior Elevation - Lobby Branding Wall
CLIENT
scale: 1/4"=1' 0"
New HVAC rooftop unit
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Front Face of Building
PROJECT
Center City Church
Sprinkler Main Pipe
at Movement Center
Branding/Display
Existing storefront and door
0'-0" a.f.f. 1st flr
B
Section/Interior Elevation - looking West at table and chair storage wall
16
scale: 1/4"=1' 0"
Schematic Design Package DESCRIPTION
Lobby Elevations MR16 display lighting
ISSUE Display/Branding Wall
30 November 2015
Sound Wall
Display wall with continuous plywood blocking
0'-0" a.f.f. 1st flr
A
Section/Interior Elevation - looking East at brick wall
16
scale: 1/4"=1' 0"
A0.16
BurgessDesignStudio
Branding/Display Wall Coffee Serving Area
PO Box 1194 Davidson NC 28036 704 895 8110
Exposed Brick area Drywall Partition
B
Aerial View Lobby
D
Lobby Plan Perspective
17
scale: 1/8"=1' 0"
17
scale:
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Sound Control Wall
C A20 Branding/Display Wall
Display Wall Lighting
D A20
Main Lobby Lighting Industrial pendant Light to match house lighting in multi-purpose room
Schematic Design Package DESCRIPTION
Enlarged Lobby ISSUE
30 November 2015
A A20
N
B A20
A
Floor Plan
A
Lobby Plan Perspective
17
scale: 1/4" = 1' 0"
06
scale:
A0.17
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Sprinkler Main Pipe MR16 Display Lighting Lobby Branding wall
Common Corridor beyond
To Multi-Purpose/Worship
B
Perspective of Lobby
18
scale: 1/8"=1' 0"
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church MR16 Display Lighting
at Movement Center
Lobby Branding wall
Schematic Design Package DESCRIPTION
Lobby Perspectives ISSUE
30 November 2015
A
Perspective of Lobby
18
scale: 1/8"=1' 0"
A0.18
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center 1
1
F A20
10'-8 3/4"
23'-0
Music Equipment Storage and Electric Guitar Amp Room 123-04
Green Room/Office 123-06
Schematic Design Package 6'-0"
Corridor 123-09
6'-0"
6'-0"
6'-0"
DESCRIPTION
Enlarged Back of Stage
12'-1/4"
ISSUE
30 November 2015 Optional Elec Closet 123-11
Five 6'x6' Storage Cages
6'-1/4"
C A20
6'-0"
Optional Mech Closet 123-10
B A20
Multi-purpose 123-01
N
A
Enlarged Back of Stage Floor Plan
19
scale: 1/4" = 1' 0"
D A20
E A20
D A20
D A20
D
Enlarged Back of Stage Ceiling Plan
19
scale: 1/4" = 1' 0"
A0.19
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
HVAC Supply to Stage HVAC Return from Stage
Storage Cages To Multi-Purpose/Worship
0'-0" a.f.f. 1st flr
C 20
Corridor Elevation of storage cages looking North scale: 1/4" = 1' 0"
Sprinkler Main Pipe HVAC Supply HVAC Return
To Greenroom
Back of Stage Corridor
0'-0" a.f.f. 1st flr
B
Corridor Elevation looking South
G
Elevation of Music Storage and Green Room looking South
20
scale: 1/4" = 1' 0"
20
scale: 1/4" = 1' 0"
CLIENT
HVAC Rooftop Unit Zone 4
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Sprinkler with heads Main Sprinkler Pipe
PROJECT
ACT Ceiling Cloud
Center City Church at Movement Center
Pendant Lighting Exposed Brick Area Existing Window Music Equipment Storage and Elec. Guitar Amp Room Green Room
F A20 F
Music Equipment Storage and Electric Guitar Amp Room 123-04
20
Green Room/Office 123-06
Elevation of Music Storage and Green room looking South
HVAC Rooftop Unit Zone 4
scale: 1/4" = 1' 0"
Zone 2
Green Room
Zone 4
Corridor Storage Cages
DESCRIPTION
Optional Mech Closet 123-10
B A20
Corridor 123-09
Schematic Design Package
Enlarged Back of Stage
C A20
ISSUE Optional Elec Closet 123-11
Five 6'x6' Storage Cages
30 November 2015
Multi-purpose 123-01
N
A
Stage and Back of Stage Plan Perspective
20
scale:
D A20
E A20
D A20
D A20
D
Elevation Section Thru Corridor and Green Room
20
scale: 1/4" = 1' 0"
E 20
Elevation Section Thru Corridor and Storage Cages scale: 1/4" = 1' 0"
A0.20
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
Room 124-01 - 03 Office and Classroom Suite Open office Ceiling B and Ceiling C Floor A WB-01 Classrooms Ceiling C Floor B WB-01 Walls (note north is down on page) West (Existing Painted masonry Wall) Wall Type 07 WB-01 Paint-03 North (Existing Gypsum Wall Board) WB-01 Paint-03 South (Existing Gypsum Wall Board) WB-01 Paint-03 East (Existing Gypsum Wall Board) WB-01 Paint-03 Walls between rooms Wall Type 02 WB-01 Paint-03
2
2
A
A
Suspended ACT ceiling "cloud" 16' x12'
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Pendant Indirect Lighting Classroom A 124-02
PROJECT
Center City Church at Movement Center
D A22
Open Office 124-01
Corridor 124-04
Suspended ACT ceiling "cloud" 16'x 16'
Suspended ACT ceiling "cloud" 14' x12'
Schematic Design Package Classroom B 124-03
DESCRIPTION
C
Enlarged Office/Classroom
C
ISSUE
30 November 2015
C A22
N
A
Enlarged Office/Classroom Area
01
scale: 1/4" = 1' 0"
B A22
A A22
B 01
Enlarged Office/Classroom Ceiling Plan scale: 1/4" = 1' 0"
A0.21
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
0'-0" a.f.f. 1st flr
D
Elevation of Entry and Office Area looking South
22
scale: 1/4" = 1' 0"
Suspended ACT ceiling "cloud" Indirect pendant Lighting
0'-0" a.f.f. 1st flr
C
Elevation of Conference Rooms looking West
22
scale: 1/4" = 1' 0"
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center Suspended ACT ceiling "cloud"
0'-0" a.f.f. 1st flr
B
Elevation Looking East
22
scale: 1/4" = 1' 0"
Schematic Design Package DESCRIPTION
Office/Classroom Elevations ISSUE
Steel Beam
30 November 2015
Exposed Mechanical Ductwork
9'-0"
Insulated metal studs and drywall over existing CMU Suspended ACT ceiling "cloud"
0'-0" a.f.f. 1st flr
A
Elevation Looking West
22
scale: 1/4" = 1' 0"
A0.22
BurgessDesignStudio
Room 124-01 - 03 Office and Classroom Suite
PO Box 1194 Davidson NC 28036 704 895 8110
Open office Ceiling B and Ceiling C Floor A WB-01 Classrooms Ceiling C Floor B WB-01 Walls (note north is down on page) West (Existing Painted masonry Wall) Wall Type 07 WB-01 Paint-03 North (Existing Gypsum Wall Board) WB-01 Paint-03 South (Existing Gypsum Wall Board) WB-01 Paint-03 East (Existing Gypsum Wall Board) WB-01 Paint-03 Walls between rooms Wall Type 02 WB-01 Paint-03
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
Classroom A 124-02
PROJECT
Center City Church at Movement Center
D A22
Corridor 124-04
Open Office 124-01
Schematic Design Package Classroom B 124-03
DESCRIPTION
Enlarged Office/Classroom ISSUE
30 November 2015
C A22
N
A
Plan Perspective of Office Suite
23
scale
B A22
A A22
A0.23
BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110
B
Aerial View of Enlarged Office Suite
24
scale:
CLIENT
Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204
PROJECT
Center City Church at Movement Center
Schematic Design Package DESCRIPTION
Office/Classroom Perspectives ISSUE
30 November 2015
A
Enlarged Office Suite
24
scale:
A0.24