Center City Church at Movement Center

Page 1

at Movement Center

Schematic Design Package

Burgess Design Studio

Center City Church

30 November 2015

at Movement Center


Office 251.8 SF Storage 249.6 SF

Preliminary Occupancy Calculation "Sanctuary" Space Seating 2086 SF net / 7 = 298 Occupants

Mech. 8.8 SF

Riser 552.8 / 15 = 37 Occupants Storage 1005.6 SF / 300 = 4 Occupants

Storage/back of stage 583.3 SF

AV Booth 126 SF = 3 Occupants

Riser 552.8 SF

Floor Finishes Floor A Existing concrete sealed - Epoxy/Urethane System Alternate - existing concrete stained and sealed

Office 251.8 SF / 100 = 3 Occupants Coffee Serving 224 SF / 200 = 3 Occupants

Storage tables and chairs 52.8 SF

Floor B Carpet - rolled

Storage 16.4 SF

Total Occupants = 399 Occupants

Ceiling Systems Ceiling A Exposed structure painted black, AV Consultant to advise on Acoustical treatment of Steel Deck - Assumed but not shown in these schematic drawings (new ridged or batt insulation -R value TBD) set in between steel bar joist tight to steel deck covered with prefinished with acoustically transparent paint or wrapped fabric (black) 2” thick acoustical mineral fiberboard panels with finished sides, clipped to structure and tight to bottom of insulation creating minimum sandwich depth.

Wall Type 01 Sound Wall - 3 5/8”metal studs, RC-1 channel (5 places), Padding Tape all channels, ¼” closed cell acoustical foam mat (cemented to soundboard back), Sound Deadening Board, Mass Loaded Vinyl (MLV) (stapled to sound deadening board), 5/8” Gypsum “firecode” wallboard, sitting on 2” vibration pads, Floor gap filled with caulk, drywalls screws do not penetrate to studs, ¼” gap at corners and ceiling (steel deck and steel structure) filled with acoustical caulk interleaving of ¼” gaps at corners, SSP metal tape over seams of sound board, sound-board joints butters with caulk, stagger joints in sound-board, Mass Loading Vinyl and Wall board as not to align. (See illustration)

Ceiling C Floating Ceiling Cloud - Acoustical ceiling tile, mineral fiber, 24x24, Armstrong Ultima square edge lay-in 15/16” or equal with aluminum trim perimeter ½”w x 3”h;

Mech. 16.3 SF

Lobby 760 SF / 15 = 51 Occupants

Wall Types

Ceiling B Existing steel roof deck, exposed, cleaned, painted to match exposed painted steel structure

Floor C Carpet - tiles

Storage Table and Chair 81.5 SF

Plumbing Fixture count to support Church Use 399 / 2 = 200 M 200 F

Wall Base WB-01 Vinyl Base 4”

200M / 150 = 1.33 Fixtures Male 200 F / 75 = 2.66 Fixtures Female

WB-02 Wood Base Painted ¾”x7 ½” – Pine or Popular (not MDF due to mopping of hard floor finishes)

Seating non fixed 2,086 SF NET

BurgessDesignStudio

Mechanical

Finishes and System Descriptions

Wall Type 02 3 5/8”’ metal studs 5/8” gypsum drywall each side extended and finished to bottom of steel deck Wall Type 03 3 5/8” metal studs 5/8” gypsum drywall each side extended and finished to 10' 0" a.f.f. Wall Type 04 Existing metal Stud wall – add sound batt insulation, one layer of 5/8” drywall with tape and mud

PO Box 1194 Davidson NC 28036 704 895 8110

Zone 1 Multi-Purpose room (400+ people) Zone 2 Stage area (stage lighting, 5-10 people plus electrical music equipment) All duct work in zone 1 and 2 is exposed painted black, oversized to reduce noise, insulation and 90 degree elbows to acoustically isolate space for units startup noise and fan noise, ductwork to run along perimeter (north and south on the page) with no duct work above or in front of the stage in order to maximize view of Video screens mounted at maximum height Oversized ducted return at minimal length with insulation and 90 degree elbows to reduce sound from units and fans Zone 1 and 2 Low velocity air movement to minimize disturbance of haze and maximize “hang time” of haze for lighting effects NOTE for fire alarm system – Haze Generators maybe in just during worship and or other music events Zone 3 Lobby and Lobby/meeting – exposed ductwork painted black, ductwork to run along perimeter – Minimal ducted return Zone 4 Back of House – exposed ductwork painted black Zone 5 Office and Classroom suite - exposed ductwork painted black

General Notes: The Package is conceptual in nature and at this phase of development there maybe conflicting in information. These sheets are to scale when printed at 24X37

Wall Type 05 Areas of existing exposed brick wall cleaned and unpainted – East Wall in Multi-Purpose and Back of Stage areas - with areas of insulated 3 5/8" stud wall covering most of exposed brick AV Acoustical analysis may require sound insulation panels of specified thickness and materials Wall Type 06 Exposed areas of Existing exterior masonry wall - cleaned and unpainted

Paint Finishes Paint-01 Eggshell - rolled - color Black or other dark color TBD in Multi-Purpose

Storage 13.2 SF

Paint-02 Open ceiling areas in lobby, multi-purpose and back of stage – spray on structure, HVAC duct work, exposed electrical conduit and junction boxes and all other exposed cables and conducts allowed to be painted by code. Applied before install of acoustical ceiling panels - Color Black or other dark color TBD

Elec. Dimmer Panels 28.6 SF AV Booth 126 SF

Door and Frame types Frame Types - 2” 16 Ga. hollow metal painted Door Types – 1 ¾” Solid Core Wood Veneer plane sliced select birch with stain finish 3’0” x 7’0”. Sidelites 3’w x 7’h

Paint-03 Eggshell - rolled - color white

Lobby 760 SF

Paint-04 Eggshell - rolled - color Accent Color Paint-05 Open ceiling areas – spray on structure, HVAC duct work, exposed electrical conduit and junction boxes and all other exposed cables and conducts allowed to be painted by code. Applied before install of acoustical ceiling panels - Color White or color to match base building esposed common areas

Coffee Serving 224 SF

11/19 /15

Sliding doors at table and chair storage – 1 1/2" x 3’6 x 7’ Wood Veneer plane sliced select birch with stain finish on overhead track sliding hardware system, thumb latch at bottom, recessed finger pulls, not lockable

Preliminary Occupancy Calculations

Finishes and Systems by Room/Area Room 123-01 Multi-Purpose Ceiling - Ceiling A Floor – Floor A Walls (note north is down on page)

Scope of Work of Services and Elements provided by Church Provided by and installed by Center City Church 1) Lobby Display/Branding wall in lobby Contractor it install continuous 1/2" plywood in wall blocking between metal studs and finished drywall for mounting of display wall final area and size of display to be determined 2) Portable riser/stage system 3) Purchase and Install of Furniture 4) Security Alarm System - Provided by and installed by church hired Consultant; Contractor to coordinate install, concealment of conduct and wiring, Contractor to provide power as required, Contractor to provide routing coordination and painting of exposed parts and conduits as in keeping with other similar systems and parts 5) Window Treatment in Greenroom Deduct alternates for services provided by Church 1) Painting of lobby walls 2) Painting of Office suite walls 3) Painting of Back of Stage walls 4) Construction of storage cages at Back of Stage area 5) Floor Finish in Office Suite Provided by and Installed by AV Design Build Consultant 1) Video Projectors - Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant 2) Operable video screens - Contactor to provide power to location as required by screens 3) Stage Lighting - Contractor to provide clean power and data conduit with pull string if required, Location and Requirements as specified by AV Design Build Consultant 4) Lobby Video Monitors (assumed 3), Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant 5) Green Room Video Monitor, Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant 6) AV Booth Equipment, Contractor to provide AV Booth per design with clean power and data conduits with pull string, Location and Requirements as specified by AV Design Build Consultant 7) Vocalist Reference Video Monitor above AV Booth, Contractor to provide clean power and data conduit with pull string, Location and Requirements as specified by AV Design Build Consultant Acoustical Treatments in Multi-Purpose Room Acoustical design of multi-purpose to be by AV Consultant, Procurement Fabrication and installation of Acoustical treatment by Contractor Sound Isolation Sound Isolation recommendations to be by AV Consultant. Sound walls and sound isolations systems to be by Contractor

West (New corridor wall) Existing wall acoustically seal drywall to steel roof deck and structural penetrations, acoustically seal any electrical or other penetrations in wall, add Sound insulation and 1 layer of Drywall, with 1” space add second Wall Type 01 drywall Finish – Paint-01, Wall Base - WB-01 North (adjacent to Lobby wall) Wall Type 03 Wall Type 03 Paint-04 South (Stage Backdrop wall) Wall Type 01 WB-01Paint-01 East (Existing Brick wall) Wall Type 06 varying sizes placed on wall in patterns to allow with exposed brick areas between some panels –electrical boxes and conduits dropped from above at each section of drywall panels as to not cross exposed section of brick wall Doors Existing Base building doors in East Wall Add acoustical treatments as allowed by door rating, continuous seal on door stops, jambs and head and acoustically sweep All other doors into room 123-01 (except closets) Solid Core 1¾” wood veneer door Automatic door bottom sweeps, Sound absorbing neoprene door jams for the vertical sides and top of the door, Acoustical door astragals Existing sprinklers lines and heads Raise main sprinkler line running north south to bottom of steel beam, secondary lines running east west as required running in between webs of bar joist as to be higher than main line as much as possible, minimize head drops as much as possible, however head locations must coordinate with video projectors, video screen, stage lighting, and mechanical ductwork along perimeter of room.Table and chair storage “closets” are screen walls with sliding panel doors, without ceilings and are open to the multi-purpose ceiling (top of wall at approximately 10' 1” above finish floor. bottom of steel deck approximately 12' 10 " a.f.f.) HVAC Five Zones Total – Zone 1 main room (400 people) – Zone 2 Stage area (stage lighting, 5-10 people plus electrical music equipment) Zone 3 Lobby and Coffee Serving – All duct work in these areas round exposed painted to match exposed steel structure/metal deck etc..., oversized to reduce noise, insulation and 90 degree elbows to acoustically isolate space for units startup noise and fan noise, ductwork to run along perimeter of room, with no duct work above or in front of the stage in order to maximize view of video screens mounted at maximum height Low velocity air movement to minimize disturbance of haze and maximize “hang time” of haze for lighting effects. Zone 4 Back of Stage Area - Green room, Music Equipment Storage, Corridor and Open wire cage storage, exposed round ductwork painted to match painted exposed steel structure/metal deck. Zone 5 Office/Classroom Suite - Open Office Area and Two Conference/classrooms ceilings open to structure with suspended acoustical ceiling floating "clouds". round exposed painted ductwork to match painted steel structure/metal deck above.

NOTE for fire alarm system – Haze Generators maybe in just during worship and or other music events Electrical Requirements Multi-purpose general electrical outlets are to be separated from electrical outlets for video equipment, projectors, wall mounted TVs and Flat screens and all electrical power drops to serve the stage, Music Equipment room and computers and sound board Multi-purpose Electrical outlets for video equipment, projectors, wall mounted TVs and Flat screens and all electrical power drops to serve the stage, Music Equipment room and computers and sound board are to be “clean Power” drops free from noise from Multi-Purpose general room dimmers and Stage Lighting dimmers. See Plans for (CP) Clean Power symbols and locations. Lighting Main Room General room lighting – evenly space and centered between bar joist, dimmable LED pendant down light as tight to bottom of bar joist as possible – computer operated dimmer system from AV booth and with presets (minimal of 4) in wall mounted panels/plates Lighting Stage Light Fixtures and Lighting trusses not included in contract/pricing (N.I.C.), Dimmer panels in dimmer closet N.I.C. Included in pricing are electrical conduit and Junction boxes mounted to steel deck and bar joist as required for stage lighting system, conduct to and from dimmer panel closet (123-13) as required

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Video Projectors Two ceiling mounted “clean power” electrical junction boxes and data drops (By AV design build consultant - not including in pricing) Video Screens Two operable projection screens (By AV design build consultant - not including in pricing) Sound System (By AV design build consultant - not including in pricing) AV booth Stage IntelliStage system – portable 4’x4’ panels 8” or 16” height (By Church - not including in pricing)

Schematic Design Package DESCRIPTION

Schematic Design General Information ISSUE

30 November 2015

A0.00


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1

2

4

3

5

A

B

Remove section of Wall to allow new continuous sound wall

Remove existing door and frame

Remove section of Wall to allow new continuous sound wall

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

C

Remove section of Wall to allow new continuous sound wall

PROJECT New door opening

Remove existing door and frame

Center City Church at Movement Center

Remove section of Wall to allow new continuous sound wall D

Opening for new entry to church lobby from corridor

Remove section of storefront to add new double 3'0" storefront doors

Schematic Design Package DESCRIPTION

Floor Plan ISSUE

30 November 2015

N

A

Floor Plan - Demo

01

scale: 1/8" = 1' 0"

A0.01


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1

4

3

2

5

23'-0"

5

5

music equip storage

5

6

Green Room/Office

1

123-05

123-04

2

2 1

12'-1/4"

3

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

2

3

Cage Storage

elec

123-08

5

mech

2

2

sound proof room

123-07

Corridor 123-03

123-06

1

2

45'-10 1/2"

6

4

4

1

A

6

3

1

6

3

5

4

Table/Chair Storage 123-09

20'-0"

4

B 2

Classroom A 124-02

5

Sliding door panels typ side storage closets

32'-0"

Open office 124-01 2

4 1

storage 123-10

3

75'-11 1/4"

abandoned elevator shaft below

2

4

1

2

6

C

Corridor 124-04

Multi Purpose 123-01

6

open above to mutli-purpose

4

Skylight left exposed with new protective barrier or sloping wall to prevent occupation of this area

CLIENT Table/Chair Storage 123-11

Sliding door panels typ side storage closets

29'-8"

6

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Classroom B 124-03

4

32'-0"

5

PROJECT open above to mutli-purpose

New door in existing wall

3

1

Center City Church at Movement Center

10'-6"

6

2

123 -13

6

D

Dimmer Panel Closet

4'-6 3/4"

storage 123-12 1

6

2 1

6

Lobby

27'-8 3/4"

123-02

1

5

Schematic Design Package DESCRIPTION

6

Floor Plan 5

6

ISSUE

30 November 2015

New double clear glass doors in existing storefront wall system

N

A

Floor Plan

02

scale: 1/4" = 1' 0"

A0.02


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1

music equip storage

4

3

2

5

Green Room/Office

123-05

123-04

elec

123-06

123-08

Cage Storage Cage Storage

mech

sound proof room

123-07

Corridor 123-03

123-06

AV booth

A

Worship Platform Table/Chair Storage

B

Classroom A 124-02

Sliding door panels typ side storage closets

Open office 124-01

Corridor 124-04

Multi Purpose 123-01

abandoned elevator shaft below

Skylight left exposed with new protective barrier or sloping wall to prevent occupation of this area

open above to mutli-purpose

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

C

Classroom B 124-03

PROJECT open above to mutli-purpose

New door in existing wall

Center City Church at Movement Center

Sound booth Steel mesh "cage and doors" on welded 2" steel angle frame doors lockable with pad locks

123 -13

Dimmer Panel Closet

D

Lobby

123-02

Branding/Mission display Wall

Schematic Design Package DESCRIPTION

Furniture Plan ISSUE

30 November 2015

New double clear glass doors in existing storefront wall system

N

A

Floor Plan

03

scale: 1/4" = 1' 0"

A0.03


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110 1

4

3

2

5

ACT Ceiling Cloud

music equip storage

Green Room/Office

123-05

123-04

mech

123-08

elec

Cage Storage

123-07

Corridor 123-03

Mech. ductwork exposed

123-06 open above to mutli-purpose

House Lighting A

Table/Chair Storage

Projection Screen

B

Classroom A 124-02 Open office 124-01

Speaker Mains storage

Corridor 124-04

Stage Lighting system

Multi Purpose 123-01 C

Mech. ductwork exposed

CLIENT

Classroom B 124-03

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Sprinkler Line

PROJECT Sprinkler Main

Center City Church at Movement Center

123 -13

Dimmer Panel Closet

D

Lobby

Branding/Mission display Wall

123-02

Special lighting mr16 pendant spot (15 fixtures) on track/cable system

Schematic Design Package DESCRIPTION

Ceiling Plan ISSUE

30 November 2015

N

A

Ceiling Plan

04

scale: 1/8" = 1' 0"

A0.04


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

back of house supply

CP

zone 4

Green Room/Office

CP

music equip storage back of house return

123-05

123-04

CPCP

CPCP

music equip storage 123-04

Green Room/Office 123-05

Cage Storage

123-06 CPCP

CP CP

Worship Platform

zone 2

zone 2

Table/Chair Storage

stage supply

stage supply

A

stage supply

stage return

stage return

Cage Storage 123-06

elec elec 123-08 123-08

stage supply

mech mech

123-07 123-07

Corridorzone 2 Corridor 123-03 123-03

CP CP

5

Sliding door panels typ side storage closets

B office suite supply

CPCP

4

3

2

CPCP

CPCP

1

Classroom A 124-02 Open office 124-01

storage

Multi Purpose 123-01

office suite return

Corridor 124-04

Open office 124-01

CP

zone 5 multi purpose return

Main Room supply

CP

CP

zone 1

Table/Chair Storage

CP

Main Room supply

C

Classroom B 124-03

office suite supply

Multi Purpose 123-01

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

zone 1

PROJECT Table and chair storage spaces open above to multi-purpose

storage

CP

PC

PC

PC

AV booth

zone 1

PC

123 -13

PC

D

Main Room Return

PC

PC

at Movement Center

Dimmer Panels

CP

Center City Church

CP

PC

PC

CP

Lobby

lobby return

123-02 zone 3

CP

CP

lobby supply

Schematic Design Package DESCRIPTION

HVAC and Power Plan

Coffee Service

CP

CP

ENTRY

ISSUE

30 November 2015

N

A

HVAC and Clean Power Diagram

05

scale: 1/8" = 1' 0"

A0.05


1

1

2

2

BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Portable Riser 12' x 28' - installed by Church

Sub speakers on floor, one each side of riser Installed by Design-Build AV Engineer

D

D

Protable Stage 8" or 16" risers

Projection screen one each side Installed by Design-Build AV Engineer

Table Chair Storage

Center Line of Stage

Main Speakers suspended from structure Installed by Design-Build AV Engineer

Storage Closet

Stage Lighting System Installed by Design-Build AV Engineer

Table Chair Storage

Multi-purpose 124-01

CLIENT

D

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

D

PROJECT

Center City Church at Movement Center

C A20

D A20

Storage Closet

Sound booth - Steel expanded mesh "cage and doors" Mesh Weldon on welded 2" steel angle frame welded together operable front panels and doors, doors lockable with Combination pad locks, front panels secured from inside

Schematic Design Package DESCRIPTION

Enlarged Multi-Purpose Dimmer Panel Closet

D

A A20

N

A

Enlarged Floor Plan Multi-Purpose

06

scale: 1/4" = 1' 0"

ISSUE

30 November 2015

D

B A20

B 06

Enlarged Ceiling Plan Multi-Purpose scale: 1/4" = 1' 0"

A0.06


New HVAC Roof Units Zone 3 Return

BurgessDesignStudio

Zone 3 Supply

PO Box 1194 Davidson NC 28036 704 895 8110

Steel Roof Deck Steel Bar Joist Steel Beam Main Sprinkler Line

House Lighting

Table and Chair Storage

0'-0" a.f.f. 1st flr

D

Interior Elevation - Looking at Stage

08

scale: 1/4"=1' 0"

Steel Bar joist Steel Beam 1'-2 1/2"

New Roof Top HVAC Units House Lighting

2'-0"

Steel Bar Joist Steel Beam Mechanical Ductwork tight to bottom of steel beam Zone 1 Supply Sprinkler piping

10'-1"

+10'-9"

Main Sprinkler Line AV Booth

0'-0" a.f.f. 1st flr

C 07

Section/Interior Elevation - looking West at table and chair storage wall

CLIENT

scale: 1/4"=1' 0"

House Lighting

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Steel Bar Joist

PROJECT

Center City Church at Movement Center

AV booth

0'-0" a.f.f. 1st flr

B

Section/Interior Elevation - looking West at table and chair storage wall

07

scale: 1/4"=1' 0"

Storage Closet

Mechanical ductwork

Sliding Door at Table and Chair storage

Storage Closet

All electrical conduct drops from above and electrical boxes contained in drywall section, no horizontal routing of conduct between drywall sections

Schematic Design Package DESCRIPTION

Multi-Purpose Elevations ISSUE

30 November 2015

0'-0" a.f.f. 1st flr

A

Section/Interior Elevation - looking East at brick wall

07

scale: 1/4"=1' 0"

Exposed Brick Area

8" Wood Wall Base PTD

Drywall Wall Section, Insulated, PTD

Brick Structural Pier

A0.07


New HVAC Roof Units Zone 4 Return

BurgessDesignStudio

Zone 4 Supply

PO Box 1194 Davidson NC 28036 704 895 8110

Steel Roof Deck Steel Bar Joist Steel Beam Main Sprinkler Line

House Lighting

Table and Chair Storage

0'-0" a.f.f. 1st flr

D

Interior Elevation - Looking at stage wall

08

scale: 1/4"=1' 0"

F 08

Interior Elevation - Looking at stage Stage backdrop By Church not including in GC pricing

scale: 1/4"=1' 0"

Riser By Church not included GC in pricing

Video screen, video projectors, speaker mains and sub-speakers provided and installed by Design built AV consultant

Steel Bar joist Steel Beam 1'-2 1/2"

New Roof Top HVAC Unit

House Lighting

2'-0"

Steel Bar Joist Steel Beam Mechanical Ductwork tight to bottom of steel beam Zone 1 Supply Sprinkler piping

10'-1"

+10'-9"

Main Sprinkler Line AV Booth

0'-0" a.f.f. 1st flr

C 08

Section/Interior Elevation - looking at AV booth in closed position

E 08

scale: 1/4"=1' 0"

Section/Interior Elevation - looking at AV booth in open position scale: 1/4"=1' 0"

AV booth in open position

House Lighting

Steel Bar Joist

Lobby Beyond

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

AV booth

0'-0" a.f.f. 1st flr

B

Section/Interior Elevation - looking West at table and chair storage wall

08

scale: 1/8"=1' 0"

Storage Closet

Mechanical ductwork

Sliding Doors at Table and Chair storage

Storage Closet

New HVAC rooftop units - Zone 1 All electrical conduct drops from above and electrical boxes contained in drywall section, no horizontal routing of conduct between drywall sections

Schematic Design Package DESCRIPTION

Multi-Purpose Worship Elevations ISSUE

30 November 2015

0'-0" a.f.f. 1st flr

A

Section/Interior Elevation - looking East at brick wall

08

scale: 1/8"=1' 0"

Exposed Brick Area

8" Wood Wall Base PTD

Drywall Wall Section, Insulated, PTD

Brick Structural Pier

A0.08


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Lobby

AV Booth Green room

Storage Cages

Basement Level

CLIENT

B

Section/Perspective

09

scale

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Stage Lobby

AV Booth

Multi-Purpose

Schematic Design Package DESCRIPTION

Multi-Purpose Section/Perspectives ISSUE Basement Level

A

Section/Perspective

09

scale

A

Sectional Perspective of Worship Setup

06

scale: 1/8"=1' 0"

30 November 2015

A0.09


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Schematic Design Package DESCRIPTION

Multi-Purpose Section/Perspectives ISSUE

30 November 2015

A

Sectional Perspective of Worship Setup

06

scale: 1/8"=1' 0"

A

Section/Interior Elevation - looking at Stage

10

scale: 1/8"=1' 0"

A0.10


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

B

Aerial view of stage

D

Aerial view of AV booth in open position

11

scale:

11

scale:

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Schematic Design Package DESCRIPTION

Multi-Purpose Worship Perspectives ISSUE

30 November 2015

A

Aerial view of stage and storage wall

11

scale:

A0.11


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

B

View from Worship Stage

D

View of Entry into Worship

12

scale: 1/8"=1' 0"

12

scale: 1/8"=1' 0"

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Schematic Design Package DESCRIPTION

Multi-Purpose Worship Perspectives ISSUE

30 November 2015

A

View from AV Booth

12

scale: 1/8"=1' 0"

A0.12


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

B

Perspective of Worship Setup

D

Perspective of Banquet Setup

13

scale:

13

scale:

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Schematic Design Package DESCRIPTION

Multi-Purpose Layouts ISSUE

30 November 2015

A

Perspective of Rectangular Table Setup

C

Perspective of Rectangular Table Setup

13

scale:

13

scale:

A0.13


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Room 123-02 Lobby Ceiling - Ceiling A and Ceiling C Floor – Floor A Walls (note north is down on page) West (New corridor/office wall) Existing wall acoustically seal drywall to steel roof deck and structural penetrations, acoustically seal any electrical or other penetrations in wall, add Sound insulation and 1 layer of Drywall, with 1” space add second Wall Type 01 drywall Finish – Paint-01, Wall Base - WB-01 North (exterior wall storefront system and masonry and metal stud) WB-01 Paint-03 on drywall New Storefront Doors South (adjacent to Multi-Purpose) Wall Type 01 with continuous layer 1/2 plywood between studs and drywall for display attachment WB-01 Paint-04 Main Church interior signage, exhibit display system, provided by and installed by church East (Existing Brick wall) Wall Type 06 with continuous layer 1/2 plywood between studs and drywall for display attachment WB-01 Paint-03 Main Church interior signage, exhibit display system, provided by and installed by church

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204 1

2

1

2

Sound Control Wall D

D

PROJECT

3'-5"

Existing Common Corridor

Dimmer Panels 123-13

Multi-purpose 124-01

Center City Church at Movement Center

Special lighting mr16 pendant spot (14) on track/cable system

Pendant Industrial themed Cage Lighting Branding/Mission display wall By Church Mounting blocking in wall by contractor

C A20

New Doors Rooftop HVAC Unit

D A20

26'-11"

14'-4"

House Lighting

Bar joist Lobby 124-02

Schematic Design Package

Exposed Ductwork

DESCRIPTION

Enlarged Lobby

New Store Front Doors

9'-2"

ISSUE Coffee Service Area

A A20

N

30 November 2015

ENTRY

B A20

A

Enlarged Lobby Floor Plan

B

Enlarged Lobby Ceiling Plan

01

scale: 1/4" = 1' 0"

14

scale: 1/4" = 1' 0"

A0.14


New Roof Top HVAC Unit Zone 3, Contractor to coordinate with building owner to provide screening of unit if required by zoning, or building owner Sprinkler piping

BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Steel Bar Joist

Exposed HVAC Ductwork

Coffee Serving Area 0'-0" a.f.f. 1st flr

D

Interior Elevation - Lobby Branding Wall

15

scale: 1/4"=1' 0"

New Storefront doors New HVAC units beyond

Lighting

Sprinkler pipe with heads Sprinkler Main pipe, relocated to light below steel beam MR16 pendant display lighting on track system

Branding/Display wall with continuous blocking

0'-0" a.f.f. 1st flr

C 15

Interior Elevation - Lobby Branding Wall

CLIENT

scale: 1/4"=1' 0"

New HVAC rooftop unit

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Front Face of Building

PROJECT

Center City Church

Sprinkler Main Pipe

at Movement Center

Existing storefront and door

0'-0" a.f.f. 1st flr

B

Section/Interior Elevation - looking West at table and chair storage wall

15

scale: 1/4"=1' 0"

Schematic Design Package DESCRIPTION

Lobby Elevations MR16 display lighting

ISSUE Display/Branding Wall

30 November 2015

Sound Wall

Display wall with continuous plywood blocking

0'-0" a.f.f. 1st flr

A

Section/Interior Elevation - looking East at brick wall

15

scale: 1/4"=1' 0"

A0.15


New Roof Top HVAC Units, Contractor to coordinate with building owner to provide screening of unit if required by zoning, or building owner Sprinkler piping

BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Steel Bar Joist

Exposed HVAC Ductwork

Lobby Video Monitors

Coffee Serving Area 0'-0" a.f.f. 1st flr

D

Interior Elevation - Lobby Branding Wall

16

scale: 1/4"=1' 0"

New Storefront doors New HVAC units beyond

Lighting

Sprinkler pipe with heads Sprinkler Main pipe, relocated to light below steel beam MR16 pendant display lighting on track system

Branding/Display Branding/Display wall with continuous blocking

0'-0" a.f.f. 1st flr

C 16

Interior Elevation - Lobby Branding Wall

CLIENT

scale: 1/4"=1' 0"

New HVAC rooftop unit

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Front Face of Building

PROJECT

Center City Church

Sprinkler Main Pipe

at Movement Center

Branding/Display

Existing storefront and door

0'-0" a.f.f. 1st flr

B

Section/Interior Elevation - looking West at table and chair storage wall

16

scale: 1/4"=1' 0"

Schematic Design Package DESCRIPTION

Lobby Elevations MR16 display lighting

ISSUE Display/Branding Wall

30 November 2015

Sound Wall

Display wall with continuous plywood blocking

0'-0" a.f.f. 1st flr

A

Section/Interior Elevation - looking East at brick wall

16

scale: 1/4"=1' 0"

A0.16


BurgessDesignStudio

Branding/Display Wall Coffee Serving Area

PO Box 1194 Davidson NC 28036 704 895 8110

Exposed Brick area Drywall Partition

B

Aerial View Lobby

D

Lobby Plan Perspective

17

scale: 1/8"=1' 0"

17

scale:

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Sound Control Wall

C A20 Branding/Display Wall

Display Wall Lighting

D A20

Main Lobby Lighting Industrial pendant Light to match house lighting in multi-purpose room

Schematic Design Package DESCRIPTION

Enlarged Lobby ISSUE

30 November 2015

A A20

N

B A20

A

Floor Plan

A

Lobby Plan Perspective

17

scale: 1/4" = 1' 0"

06

scale:

A0.17


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Sprinkler Main Pipe MR16 Display Lighting Lobby Branding wall

Common Corridor beyond

To Multi-Purpose/Worship

B

Perspective of Lobby

18

scale: 1/8"=1' 0"

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church MR16 Display Lighting

at Movement Center

Lobby Branding wall

Schematic Design Package DESCRIPTION

Lobby Perspectives ISSUE

30 November 2015

A

Perspective of Lobby

18

scale: 1/8"=1' 0"

A0.18


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center 1

1

F A20

10'-8 3/4"

23'-0

Music Equipment Storage and Electric Guitar Amp Room 123-04

Green Room/Office 123-06

Schematic Design Package 6'-0"

Corridor 123-09

6'-0"

6'-0"

6'-0"

DESCRIPTION

Enlarged Back of Stage

12'-1/4"

ISSUE

30 November 2015 Optional Elec Closet 123-11

Five 6'x6' Storage Cages

6'-1/4"

C A20

6'-0"

Optional Mech Closet 123-10

B A20

Multi-purpose 123-01

N

A

Enlarged Back of Stage Floor Plan

19

scale: 1/4" = 1' 0"

D A20

E A20

D A20

D A20

D

Enlarged Back of Stage Ceiling Plan

19

scale: 1/4" = 1' 0"

A0.19


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

HVAC Supply to Stage HVAC Return from Stage

Storage Cages To Multi-Purpose/Worship

0'-0" a.f.f. 1st flr

C 20

Corridor Elevation of storage cages looking North scale: 1/4" = 1' 0"

Sprinkler Main Pipe HVAC Supply HVAC Return

To Greenroom

Back of Stage Corridor

0'-0" a.f.f. 1st flr

B

Corridor Elevation looking South

G

Elevation of Music Storage and Green Room looking South

20

scale: 1/4" = 1' 0"

20

scale: 1/4" = 1' 0"

CLIENT

HVAC Rooftop Unit Zone 4

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Sprinkler with heads Main Sprinkler Pipe

PROJECT

ACT Ceiling Cloud

Center City Church at Movement Center

Pendant Lighting Exposed Brick Area Existing Window Music Equipment Storage and Elec. Guitar Amp Room Green Room

F A20 F

Music Equipment Storage and Electric Guitar Amp Room 123-04

20

Green Room/Office 123-06

Elevation of Music Storage and Green room looking South

HVAC Rooftop Unit Zone 4

scale: 1/4" = 1' 0"

Zone 2

Green Room

Zone 4

Corridor Storage Cages

DESCRIPTION

Optional Mech Closet 123-10

B A20

Corridor 123-09

Schematic Design Package

Enlarged Back of Stage

C A20

ISSUE Optional Elec Closet 123-11

Five 6'x6' Storage Cages

30 November 2015

Multi-purpose 123-01

N

A

Stage and Back of Stage Plan Perspective

20

scale:

D A20

E A20

D A20

D A20

D

Elevation Section Thru Corridor and Green Room

20

scale: 1/4" = 1' 0"

E 20

Elevation Section Thru Corridor and Storage Cages scale: 1/4" = 1' 0"

A0.20


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

Room 124-01 - 03 Office and Classroom Suite Open office Ceiling B and Ceiling C Floor A WB-01 Classrooms Ceiling C Floor B WB-01 Walls (note north is down on page) West (Existing Painted masonry Wall) Wall Type 07 WB-01 Paint-03 North (Existing Gypsum Wall Board) WB-01 Paint-03 South (Existing Gypsum Wall Board) WB-01 Paint-03 East (Existing Gypsum Wall Board) WB-01 Paint-03 Walls between rooms Wall Type 02 WB-01 Paint-03

2

2

A

A

Suspended ACT ceiling "cloud" 16' x12'

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Pendant Indirect Lighting Classroom A 124-02

PROJECT

Center City Church at Movement Center

D A22

Open Office 124-01

Corridor 124-04

Suspended ACT ceiling "cloud" 16'x 16'

Suspended ACT ceiling "cloud" 14' x12'

Schematic Design Package Classroom B 124-03

DESCRIPTION

C

Enlarged Office/Classroom

C

ISSUE

30 November 2015

C A22

N

A

Enlarged Office/Classroom Area

01

scale: 1/4" = 1' 0"

B A22

A A22

B 01

Enlarged Office/Classroom Ceiling Plan scale: 1/4" = 1' 0"

A0.21


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

0'-0" a.f.f. 1st flr

D

Elevation of Entry and Office Area looking South

22

scale: 1/4" = 1' 0"

Suspended ACT ceiling "cloud" Indirect pendant Lighting

0'-0" a.f.f. 1st flr

C

Elevation of Conference Rooms looking West

22

scale: 1/4" = 1' 0"

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center Suspended ACT ceiling "cloud"

0'-0" a.f.f. 1st flr

B

Elevation Looking East

22

scale: 1/4" = 1' 0"

Schematic Design Package DESCRIPTION

Office/Classroom Elevations ISSUE

Steel Beam

30 November 2015

Exposed Mechanical Ductwork

9'-0"

Insulated metal studs and drywall over existing CMU Suspended ACT ceiling "cloud"

0'-0" a.f.f. 1st flr

A

Elevation Looking West

22

scale: 1/4" = 1' 0"

A0.22


BurgessDesignStudio

Room 124-01 - 03 Office and Classroom Suite

PO Box 1194 Davidson NC 28036 704 895 8110

Open office Ceiling B and Ceiling C Floor A WB-01 Classrooms Ceiling C Floor B WB-01 Walls (note north is down on page) West (Existing Painted masonry Wall) Wall Type 07 WB-01 Paint-03 North (Existing Gypsum Wall Board) WB-01 Paint-03 South (Existing Gypsum Wall Board) WB-01 Paint-03 East (Existing Gypsum Wall Board) WB-01 Paint-03 Walls between rooms Wall Type 02 WB-01 Paint-03

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

Classroom A 124-02

PROJECT

Center City Church at Movement Center

D A22

Corridor 124-04

Open Office 124-01

Schematic Design Package Classroom B 124-03

DESCRIPTION

Enlarged Office/Classroom ISSUE

30 November 2015

C A22

N

A

Plan Perspective of Office Suite

23

scale

B A22

A A22

A0.23


BurgessDesignStudio PO Box 1194 Davidson NC 28036 704 895 8110

B

Aerial View of Enlarged Office Suite

24

scale:

CLIENT

Center City Church 401 Hawthorne Lane Suite 110-219 Charlotte NC 28204

PROJECT

Center City Church at Movement Center

Schematic Design Package DESCRIPTION

Office/Classroom Perspectives ISSUE

30 November 2015

A

Enlarged Office Suite

24

scale:

A0.24