DESIGN PORTFOLIO
DIVYA N ARCHITECTURE STUDENT SELECTED WORKS 2021-2023
DIVYA N
CONTACT :
PHONE 9986024427
EMAIL divya.20aar@cmr.edu.in
LANGUAGES :
ENGLISH
KANNADA
HINDI TELUGU
WORK EXPERIENCE :
PART OF MANAGEMENT AND PROMOTION TEAM AT THE UNTAMED MEDIA COMPANY
CONNECT :
LINKEDIN - Divya N
ISSUU - Divya_N
HELLO!
AS AN ASPIRING ARCHITECT, I AM CONFIDENT IN MY ABILITY TO CONTRIBUTE IN CREATING INNOVATIVE AND FUNCTIONAL SPACES, WITH AN EYE FOR DETAIL AND DEDICATION I’D LIKE TO BELIEVE THAT I WOULD BE A USEFUL PART OF YOUR TEAM . THAT BEING SAID I AM EAGER TO APPLY MY SKILLS AND KNOWLEDGE IN A PROFESSIONAL SETTING AND GAIN MUCH MORE IN RETURN.
EDUCATION :
2016 - 2018 : NEW BALDWIN INTERNATIONAL RESIDENTIAL SCHOOL
2018 - 2020 : DEEKSHA - SVCE PU COLLEGE
2021: CMR UNIVERSITY SCHOOL OF ARCHITECTURE
SKILLS :
AUTOCAD
ILLUSTRATOR
SKETCHUP
REVIT
ENSCAPE
INDESIGN
COMMUNICATION
RESEARCH & ANALYSIS
WORKSHOPS :
FULLSCALE 110 - CNC FORM DEVELOPMENT BY PRATIK BHANDARI
FULLSCALE 111 - FERROCEMENT WORKSHOP BY RENUKA OKA
ADDITIVE MODELING TECHNIQUE BY PRATIK BHANDARI
ZONAL NASA CONVENTION - ZNC 2022 HYDERABAD
FULLSCALE 112 - DHOKRA CASTING BY PIJUSH MONDAL
FULLSCALE 113 - WALL MURALS BY PRACHI SAHASRABUDHE
2
CONTENTS :
1. ARCHITECTURAL DESIGN VI
2. ARCHITECTURAL DESIGN V
3. WORKING DRAWINGS [ AD V ]
4. ARCHITECTURAL DESIGN II
5. BUILDIN CONSTRUCTION & MATERIALS
6. WORKSHOPS
7. MISCELLANEOUS
3
REVITALIA HOUSE
The idea behind this project was to build a concept for an old age retairment home designed to provide senior citizens with an innovative living space that offers a new dimension of comfort and care.
where the current old age homes have grown out of context to the generation we live in this was an approach to create something for the present and for the various generations(us) to come in the future.
4 ARCITECTURAL DESIGN VI
1 BHK HOUSE 2 BHK HOUSE COMMON ACTIVITY AREA
CHRIST THE KING CHRUCH + SCHOOL,Malleshwaram
INTRODUCTION
Malleswaram is a northwest neighborhood and one of the zones of Bruhat Bengaluru Mahanagar Palika. It was developed as a suburb in 1892 and handed over to the city municipality in 1895. As per 1878 Survey of India map, the area came under the village of Ranganatha Palya and later was named after the Kadu Malleswaram Temple.
Malleswaram ideally known for its housing complex, o ces and one them being World Trade Center. It also has Mantri Square, Orion Mall and Multiple Commercial complex around. Iskcon Temple being of the prominent landmark next to Malleswaram.
Sandal Soap Factory is one of Metro stops connecting to Malleswaram.
5 ARCITECTURAL DESIGN VI TIMELINE
DEMOGRAPHIC
2000 2011 2022 PRIMARY SECONDARY TERTIARY IN 2000, IT WAS A NATURAL GREEN AREA, CONSTRUCTION WAS NO YET MYSORE LAMP FACTORY WAS IN BUSINESS. IN 2011, URBANIZATION STARTED TOWARDS RAJAJINAGAR 2022 MALLESWARAM SEEMS TO BE INCREASE ITS CONSTITUTION TOWARDS INSTITUTION SITE DIMENSIONS
SITE
N 109.95m 44.63m 130.9m 60.8m 65.5m 73.88m 84.51m 109.57m 104.0m 38.4m 44.81m MYSORE LAMP FACOTRY CHRIST THE KING CHRUCH CHRIST THE KING SCHOOL ST. PETERS SEMINARY
ANALYSIS
The concept was to have a symbiotic relationshhip between the existing buildings (school& church) and the proposed program to have a cohesieve environment where the senior citizen get experience every proram and every bit of the site
MASTER PLAN
6 ARCITECTURAL DESIGN VI EXISTING BUILDING SENIOR CITIZEN BUILDING SCHOOL CHURCH EXISTING BUILDINGS AND THE PROPOSED PRORAMME TO HAVE AN OVERLOOK ON ONE ANOTHER FOR THE EXISTING AND PROPOSED PRORAMME TO CO-EXIST COHESIVELY AND NOT ISOLATED FROM EACHOTHER ACCESS-1 ACCESS-2 HAVE CLEAR ACCESS PATHS THAT LEAD INTO THE SITE AND SUCH THAT THE PATHWAYS DICTATE THE DIRECTION TOWARDS THE PRORAMMES TO HAVE A LINEAR PATHWAY THAT ALLOWS PLACEMENT OF PRORAMMES ON EITHER SIDE AND EASY ACCESS CHURCH CAFE SCHOOL ACCOMODATION+ HEALTH CARE SKILLSET NURSERY YOGA MULTI PURPOSE+ POOL PARKING HAVING A SYMBIOTIC ARRANEMENTS BETWEEN THE PRORAMMES HELPS WITH INTERACTION AND ENGAGEMENT OF THE USERS DESIGN INTENT HAVE CLEAR ACCESS PATHS THAT LEAD INTO THE SITE AND SUCH THAT THE PATHWAYS DICTATE THE DIRECTION TOWARDS THE PRORAMMES TO HAVE A LINEAR PATHWAY THAT ALLOWS PLACEMENT OF PRORAMMES ON EITHER SIDE AND EASY ACCESS CHURCH CAFE SCHOOL ACCOMODATION+ HEALTH CARE SKILLSET NURSERY YOGA MULTI PURPOSE+ POOL PARKING HAVING A SYMBIOTIC ARRANEMENTS BETWEEN THE PRORAMMES HELPS WITH INTERACTION AND ENGAGEMENT OF THE USERS WALLS BEDROOM LIVING WASHROOM 1 2 3 4 5 6 7 8 9 10 11
ACCESS POINT
ACCOMODATION
CHURCH
SKILLSET
NURSERY
MULTIPURPOSE HALL
1.
2.
3. CAFFE 4.
5.
BLOCK 6.
7. PARKING 8.
9. YOGA CENTER 10. SCHOOL 11. ACCESS POINT
CONCEPT 1BHK & 2BHK
7 ARCITECTURAL DESIGN VI WALLS BEDROOM LIVING & DINING AREA WASHROOM 2BHK PLAN
ARCITECTURAL DESIGN VI
9 ARCITECTURAL DESIGN VI
1 BHK HOUSE
2 BHK HOUSE COMMON CORE
SAMMELANA
Sammelana is a civic center that is to be designed with the people and society in mind . Considering various facts about how the building will interact with the sourroundings and how it can contribute to the overall well-being of the community. The main ideology was about how the people could easily access and utilize this space to its fullest and create something that could be a one stop solution to many public queries related to civic amenities
10 ARCITECTURAL DESIGN V EXISISTING
CONCEPT
Built around the decades old banayan tree in tavarekere it was important to take its existance into consideration and make it a place where everybody could still relate to the site and spend time as they used to
IMAGE
EXISISTING AREA AROUND THE TREE.
HAVING SIMILAR FUNCTIONS THAT THE PEOPLE AROUND ARE FAMILIAR WITH
SKILLSET & MULTIPURPOSE HALL
BANGALORE ONE, POSTOFFICE, D&B OFFICE
ARCHIVE
INFORMAL PROGRAMS ADDRESSING THE TREE AND THE SECONDARY ROADS FORMAL BUILDINGS ADDRESSING THE MORE BUSIER ROADS
LARGER INTERNAL STREETS SPACIOUS
INDIVIDUAL PROGRAM HAS DESIGNATED BLOCKS
ARCITECTURAL DESIGN V 11
FOOD JOINT LOK ADALAT CLINIC
PROGRAM
CONCEPT
ARCITECTURAL DESIGN V 1 2 3 4 5 6 7
1. SKILLSET BLOCK
2. HEALTH CARE
3. LOK ADALAT
4. SEVA KENDRA
5. ARCHIVE
6. RESTURANT
7. COMMON SITTING AREA
PLANS & SECTIONS GROUND FLOOR FIRST FLOOR
SECTIONS
ARCITECTURAL DESIGN V
GROUND FLOOR
WORKING DRAWINGSARCHITECTURAL DESIGN V
14 WORKING DRAWING, AD-V
PART PLAN DETAILED
15 WORKING DRAWING, AD-V 1 3 5 7 9 11 13 15 17 19 21 23 25 27 DESCRIPTION ARCHITECTS: PROJECT TITLE CLIENT Key Plan REV DATE BY - No dimensions - Levels shown - Contractor must any work or preparing - Work within the Management) Regulations Plan has been produced. Regulations. - Drawing is to be specifications. Contractor/manufacturers cross-referencingthe planning permit, to be complied - All materials and protected from the - All areas disturbed match existing adjacent. - All arisings to local regulations. - Contractor to provide approval prior to works.- Refer to MEP STAIRCASE PLAN,SECTION,DETAILS DIVYA N MAIN LANDING DETAIL 1 SCALE 1:20
STAIRCASE
DETAILS
16
DRAWING, AD-V TOILET - PLAN 1 SCALE 1:20 SECTION- A A SCALE 1:20 SECTION- B B SCALE 1:20 SECTION - C C SCALE 1:20 SECTION- D D SCALE 1:20 MALE WASHROOM ARCHITECTS: PROJECT TITLE CLIENT CONTRACTOR: Key Plan REV DATE - No dimensions shown- Contractor any work - Work Management) Plan has Regulations. - Drawing specifications. cross-referencingthe planning to beprotected - All areas - All arisings local regulations.approval works.- Refer DESCRIPTION PROJECT TITLE CONTRACTOR: Key Plan REV DATE BY DESCRIPTION shown in mm and are to be checked - Levels shown are in metres and referany work or preparing shop drawings. - Work within the scope of the Gibraltar Management) Regulations is not to start Plan has been produced. All works to Regulations. - Drawing is to be read in conjunction cross-referencing between drawings - Contractor is to ensure that the conditions the planning permit, approval notice and - All materials and fittings to be best quality, protected from the elements at all times.match existing adjacent. - All arisings to be carted away and disposed local regulations.approval prior to placement of orders works. - Refer to Structural Engineer's Drawings - Refer to MEP Engineer's Drawings elements. STAIRCASE PLAN,SECTION,DETAILS DIVYA N MID LANDING DETAIL 2 SCALE 1:20 RAILING TO TREAD DETAIL 3 SCALE 1:20
BATHROOM DETAILS
WORKING
STAIRCASE DETAILS
WINDOW DETAILS
17 WORKING DRAWING, AD-V SINGLE AWNING WINDOW WITH FANLIGHT W1 SCALE 1:20 DOUBLE CASEMENT WINDOW W2 SCALE 1:20 DOUBLE JALOUSIE WINDOW W3 SCALE 1:20 SINGLE CASEMENT WINDOW W4 SCALE 1:20 DOUBLE SLIDING WINDOW W5 SCALE 1:20 DESCRIPTION WINDOW ARCHITECTS: PROJECT CLIENT CONTRACTOR: Key REV DOUBLE OPENING DOOR D1 SCALE 1:20 SINGLE ALUMINIUM DOOR WITH JALOUSIE SHUTTER D2 SCALE 1:20 UPVC MULTI-SLIDING DOORS D3 SCALE 1:20
DOOR DETAILS
18 WORKING DRAWING, AD-V 201 202 GLASS FACADE WALL SECTION 2 SCALE 1:25 FACADE TO ROOF DETAIL 201 SCALE 1:10 PLINTH TO FACADE CONNECTION DETAIL 202 SCALE 1:10 Key Plan - No dimensions to be scaled from this drawing. All dimensions shown in mm and are to be checked by the contractor/manufacturers on site.- Contractor must verify all dimensions on site before commencing any work or preparing shop drawings. - Work within the scope of the Gibraltar Construction (Design & Management) Regulations not to start until a Health and Safety - Drawing to be read in conjunction with accompanying NBS specifications. Contractor/manufacturers are responsible for full cross-referencing between drawings and specifications.to be complied with at all times. - All materials and fittings to be best quality, to British Standards protected from the elements at all times. - All areas disturbed or exposed during works to be made good - All arisings to be carted away and disposed of in accordance local regulations. - Contractor to provide samples of exact finishes and fittings for approval prior to placement of orders and/or proceeding with the- Refer to MEP Engineer's Drawings and Specifications for all elements. Key Section BRICK VENEER CLADDED WALL SECTION 1 SCALE 1:20 101 102 CLADDING AT PLINTH LEVEL DETAIL 102 SCALE 1:10 CLADDING AT SILL LEVEL DETAIL 101 SCALE 1:10 DESCRIPTION ARCHITECTS: PROJECT TITLE CLIENT CONTRACTOR: Key Plan - No dimensions shown in mm on site. - Levels shown - Contractor any work orManagement) Plan has been - Drawing is specifications. cross-referencing - Contractor the planning to be complied - All materials protected from - All areas disturbed match existinglocal regulations. - Contractor - Refer to Structural - Refer to MEP elements. Key Section
19 WORKING DRAWING, AD-V 301 302 METAL FACADE WALL SECTION 3 SCALE 1:25 303 FACADE TO CIELING AND COPING DETAIL 301 SCALE 1:10 FACADE TO GROUND LEVEL DETAIL 302 SCALE 1:10 CONNECTION BETWEEN TWO METAL PLATES 303 SCALE 1:10 402 402 ACP CLADDING WALL SECTION 4 SCALE 1:25 FACADE TO GROUND LEVEL DETAIL 401 SCALE 1:10 FACADE TO CEILING AND GUTTER DETAIL 401 SCALE 1:10 ARCHITECTS: CLIENT Key Planshown in mm on site.- Contractor any work or - Work within Management) Plan has been Regulations. - Drawing is cross-referencing - Contractor the planning to be complied - All materials protected from - All areas disturbed - All arisings local regulations.approval prior works.- Refer to MEP Key Section
POD BY THE LAKE
Pod by the lake is a reading pod with the idea of building a small nest for all the readers who come to kundanahalli lake to take their time in peace and make the most of it the main idea behind the project was to be able to provide a simple space where readers could read and also the people who came to wall could use it as shelter in case of any need.
With the concept of merging two geometric shapes and having a balance in indoor and outdoor space to accomodate not more than 4-6 people at a time and to be able suit all of their preference and provide them with equal spaces to read in peace this was a interesting project to work on
20 ARCITECTURAL DESIGN II <--------------------ACCESS
5M WIDE --------------------> <--------------------ACCESS
WIDE -------------------->
PATH
PATH 2.3M
GROUND FLOOR
FIRST FLOOR
21 ARCITECTURAL DESIGN II -------------------->
1.
2
3.
4.
5.
1. ENTRANCE
2. LOBBY
3. OUTDOOR SEATING ON GROUND FLOOR
4. INDOOR SEATING AREA
5. OUTDOOR SEATING AREA ON FIRST FLOOR
BUILDING CONSTRUCTION & MATERIALS COMBINATION OF WAFFLE
WAFFLE & PT SLAB
BUILDING CONSTRUCTION & MATERIALS
FINAL MODEL MADE USING MDF BOARD AND WAFFLES 3D PRINTED
WAFFLE VARIATIONS
25 BUILDING CONSTRUCTION & MATERIALS
3D MODEL
DRAFTED SHEETS
WORKSHOPS & MISCELLANEOUS
28
SHAPE SCAPE
shape scape is a prototype of a lamp which is inspired by a labyrinth
with the playfullness of a labyrint of how a human tries to find his way out in a very similar way i tried to create that with light
created with mdf using laser cut is an idea of how light would scatter through different areas
WORKSHOPS
TRIDOM
Tridom was a an exploration with fero-cement casting where we wanted to take a new approch on creating domes.
In this using triangles and with the approch of cantilevering at one end quite fasinated us to take upon this form
After a lot of trial and errors and understanding the concept behind reinforcing a structure this was true learning process
30 WORKSHOPS
WOVEN WOOD
Woven wood was a simple product making of a wall frame combine and using two or more different materials.
using tapestry gave this frame a identity and using tapestry and loom as a material gives so much flexibility in trying different forms
31 WORKSHOPS
MAZE RUNNER INFLUENCED WITH IDEOLOGIES OF FREI OTTO
32 MISCELLANEOUS
Taking Frei Otto’s buildings and his building techniques as a case study i found his use of tensile structure as a material to convey that huge structures dont have to be dense and heavy and takinf inspiration from the flowiness of the material.
here is an attempt of creating a maze using his principles here i have taken children and my maze is subjected to their use
33
MISCELLANEOUS
I HEARBY DECLARE THAT ALL WORKS IN THIS PORTFOLIO ARE MY ORIGINAL ACADEMIC WORKS (2021-23)
DIVYA N divya.20aar@cmr.edu.in 9986024427