1 minute read

CHURCH OF THE CITY - THIRD FLOOR RENOVATION

Next Article
VENTUREX

VENTUREX

FRANKLIN, TN | 14,000 SQ. FT.

This project features a comprehensive overhaul of the current third-floor interior, which entails the demolition of the existing layout and the creation of a modern, dynamic office space.

One of the key features of this renovation was the installation of new windows, which allows natural light to flood into the space, creating a brighter and more inviting atmosphere. In addition to enhancing the visual appeal of the space, the natural light also has positive effects on employee productivity, mood, and overall well-being.

Another crucial aspect of the renovation was the creation of large, open collaborative spaces that encourage teamwork, communication, and creativity among team members. These areas were designed to promote brainstorming, group meetings, and informal gatherings, and are equipped with the latest technology and ergonomic furnishings to ensure optimal comfort and functionality.

This article is from: