WEL Planning

Page 38

3.0 DESIGN DEVELOPMENT: ELEVATIONS AND LAYOUTS 3.6 Bay Studies and Facade Details Transition between west and south elevations

Continuous soffit line wraps around the corner continuing the pedestrian scale and tying together the west and south elevation designs

38

Continuous parapet line ties together the west and southern elevations

South-west corner elevation

West (West End Lane) elevation toward south corner

Non-residential space (for Class Uses A1, A2, A3, D1 or D2)

Enlarged dormer at corner marks the corner which signifies the start of Potteries Path and the opening to the public space

Glazing wraps around the corner providing views and inviting activity into the public space

156 West End Lane | DESIGN AND ACCESS STATEMENT ADDENDUM

Additional entrance to non-residential space allowing active frontage to wrap around the corner along Potteries Path

August 2016

DESIGN AND ACCESS STATEMENT ADDENDUMďťż

Inset balconies act as a motif to tie the west and south elevations together

South elevation toward west corner

Start-up units


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.