01

1 Nested Enclave

14

2 volpe development project

18

3 you are the fish

24

4 Layers of Skin, Scales of Segregation

30

5 inside out 01


exterior perspective

Situated

in Jacobs

Pillow,

Massachusetts Berkshires, Nested Enclave, focuses on the development and emphasis on themes of nesting and transparency. Consisting of three primary elements, namely a theatre, an archive and a concrete nest. The theatre, sitting within the concrete nest, houses five transa dance academy in the

parent theaters that maintain moving wall systems that allow for the expansion and limitation of the theatre spaces.

The

tertiary element, the archive space, sits almost floating between the theatre and the concrete nest, weaving in and out of both programs.

project completed with rhinoceros

Nested Enclave Jacob’s Pillow, Ma // 02

2021

//

3 d,

Completed

grasshopper, vray, adobe photoshop, and adobe illustrator.

alongside

Helna Zhen


interior theaters birds-eye view

interior archive space

archive entrance and stairwell

03


A

B

C

D

E

F

G

H

I

J

K

L

M

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

A

B

C

D

E

F

G

H

I

J

K

L

M

first floor plan

A

C

D

E

F

G

H

I

J

K

L

M

A

B

C

D

E

F

G

H

I

J

K

L

M

1

1

1

1

2

2

2

2

3

3

3

3

4

4

4

4

5

5

5

5

6

6

6

6

7

7

7

7

8

8

8

8

9

9

9

9

10

10

10

10

11

11

11

11

12

12

12

12

A

04

B

B

C

D

E

F

G

H

ground floor plan

I

J

K

L

M

A

B

C

D

E

F

G

H

I

J

K

L

M

roof


green roof

timber truss system

wooden louvers

movable theatres

concrete archive

columns

structure and concrete massing

plan

exploded structural axonometric

05


a

d

f

k

c

e

northeast sectio

06


b i

j

g

h

l

onal perspective

07


southwest sectio

08


onal perspective

09


d

2

1

b

a

f

2

7

k j

i 1

d

2

g

c

1

4x

10 14 9 2

6 3

f

l

8

7

k

13

j

9 h

g

c 10

e

14 9

7

4x 8 6

10 10

l

8

11

9

13 9

9

12

e 14

9

12

9

5 5 5

1

1

2

2

6

Interior Movable Wall: Railing

Control Membrane 1’ Wheel 30/20 mm steel RHS supporting structure

Green Roof construction: Engineered Soil with Plantings Cant 7 Green Roof construction: Moisture-Retention Layer Aeration Layer Engineered Soil with Plantings Thermal Insulation Cant Drainage Layer Protection Course Moisture-Retention Layer Green Roof Waterproofing Membrane

Aeration Layer

3

Louvres Thermal Insulation 30/20 mm steel RHS supporting structure Double Pane Glass Drainage Layer

3

Concrete Footing Geotextile Mat Louvres Insulation 30/20 mm steel RHS Water Proofing Ground Pane Glass Double

8

supporting structure

9

6

Roof construction: Parapet Flashing 4” x 8” Pavers Fully Adhered Water Control Membrane Tapered Grid Insulation7 Air Control Transition Membrane Fiberglass Batt Insulation Water, Air, Vapor Control Membrane Air Control Membrane Fully Adhered Roof Membrane Two layers of Insulation Control Membrane Metal Deck Girder & 1’ deep Wide Flange Beam

Drop Ceiling

4

Rigging System suspended from Steel Beam

5

Concrete Footing Geotextile Mat Insulation Water Proofing Ground

Raised Floor

Interior Movable Wall: 20 mm wood floorboard (tongue and groove) Joists Railing Floor 20 mm counter-floor 1’ Wheel Concrete

Exterior Fixed Wall

Protection Course Rigging System suspended fromGreen Steel Beam Roof Waterproofing Membrane

4 5

Parapet Flashing Parapet Flashing Fully Adhered Water Control Membrane 30/20 mm steel RHS supporting structureWater Fully Adhered

Exterior Fixed Wall 10

10

Single Pane Glass

11

Perforated Concrete Cladding

12

Springboard Floor

13

Wall Construction Wood Cladding Insulation Vapor Barrier Concrete Interior Wall Finish

14

Retaining Wall & Anchor

Vapor Barrior Insulation

Perforated Concrete Cladding Roof11construction: Parapet Floor Flashing 12 Springboard 4” x 8” Pavers 13 Wall Construction Wood Cladding Fully Adhered Water Control Membrane Tapered Insulation Grid Insulation Vapor Barrier Concrete Air Control Transition Membrane Interior Wall Finish Fiberglass Batt Insulation 14 Retaining Anchor Control Membrane Water,Wall Air,&Vapor

Drop Ceiling

composite detailed section

10

5 Raised0Floor

Single Pane Glass

Air Control Membrane Fully Adhered Roof Membrane Two layers of Insulation Control Membrane Metal Deck Girder & 1’ deep Wide Flange Beam 8

9

10

20

30

20 mm wood floorboard (tongue and groove) Floor Joists 20 mm counter-floor Concrete Vapor Barrior Insulation

60

10


c

d

g

h

k

7

2 c c

d d

8

8 g g

h h

k k

10

77

22

13

11

1616

88

88

1010

1111

1313 e

f

i

j

2 e e

13

l

1

f f

i i

j j

l l

2

11

22 22

1313

6

4

9

1010

3

11 1

5

Parapet Flashing 5 5 Parapet Flashing Parapet Flashing Fully Adhered Water Control Membrane Fully Adhered Water Control Fully Adhered WaterMembrane Control Membrane 30/20 mm steel RHSRHS supporting structure 30/20 mm steel supporting structure

30/20 mm steel RHS supporting structure

2 2

2

Green Roof construction & Parapet: Green Roof construction & Parapet:

Green Roof construction & Parapet: Parapet Flashing Parapet Flashing Water Control Membrane Water Control Membrane Parapet Flashing Insulation Insulation

6 6

Water Control Membrane

Engineered SoilSoil with Plantings Insulation Engineered with Plantings Cant 7 7 Cant Moisture-Retention Layer Moisture-Retention Layerwith Plantings Engineered Soil Aeration Layer Aeration Layer Cant Thermal Insulation Thermal Insulation Drainage Layer Moisture-Retention Layer Drainage Layer Protection Course Protection Course Aeration Layer Green Roof Waterproofing Membrane Green Roof Waterproofing Membrane Thermal Insulation CLTCLT Panels Panels Layer Girder &Drainage 1’&deep Wide Flange Beam Girder 1’ deep Wide Flange Beam

Protection Course

3 3

Louvres Green Roof Waterproofing Membrane Louvres 30/20 mmmm steel RHSRHS supporting structure 30/20 steel supporting CLT Panels structure Double Pane Glass Double Pane Glass

4 4

Rigging System suspended from Steel Beam Rigging System suspended from Steel Beam

Girder & 1’ deep Wide Flange Beam

3

4

1515

33

99 55

66

44

10

Louvres 30/20 mm steel RHS supporting structure Double Pane Glass Rigging System suspended from Steel Beam

8 8 Concrete Footing Footing Concrete Footing 5Concrete Geotextile MatMat Geotextile Geotextile Mat Insulation Insulation Insulation Water Proofing Water Proofing Ground Water Proofing Ground 9 9 Ground Interior Movable Wall: Interior Movable Wall: 4” Polycarbonate 4” Polycarbonate 6 Interior Movable Wall: 1’ Wheel & Railing 1’ Wheel & Railing Exterior Fixed Wall 4” Polycarbonate Exterior Fixed Wall

Drop Ceiling Drop Ceiling

Raised Floor Raised Floor

1’ Wheel & Railing

8

0 0

1010

2020

4040

60060

10

20

100 100

Lighting Fixture Sprinkler Supply/ Return Air Vent

20 20 mmmm wood floorboard (tongue andand groove) Retaining Wall & Anchor (tongue groove) 14 14 Retaining Wall & Anchor 9 Joistswood floorboard Raised Floor Floor Floor Joists 20 mm15wood floorboard (tongue and groove) 20 20 mmmm counter-floor Polycarbonate Interior wallwall railing counter-floor 15 Polycarbonate Interior railing Concrete Floor Joists Concrete Vapor Barrior 16 Green Roof Drain 20 mm counter-floor Vapor Barrior 16 Green Roof Drain Insulation Insulation

Roof construction: Roof construction: Exterior Fixed Wall Parapet Flashing Parapet Flashing 10 10 Single Pane Glass 4” x4”8”x Pavers Single Pane Glass 8” Pavers Fully Adhered Water Control Membrane 7 Roof construction: Fully Adhered Water Control Membrane 11 Perforated Concrete Cladding Tapered Grid Insulation 11 Perforated Concrete Cladding Parapet Flashing Tapered Grid Insulation Air Air Control Transition Membrane 10 Control Transition Membrane 4” x 8” Pavers 12 Springboard Floor Fiberglass Batt Insulation 12 Springboard Floor Fiberglass Batt Insulation Fully Adhered Water Control Membrane Water, Air,Air, Vapor Control Membrane Water, Vapor Control Membrane 11 13 13 Wall Construction Tapered Grid Insulation Wall Construction Wood Cladding Air Air Control Membrane Wood Cladding Control Membrane Air Control Transition Membrane Insulation Fully Adhered Roof Membrane 12 Insulation Fully Adhered Roof Membrane Fiberglass Batt Insulation Vapor Barrier TwoTwo layers of Insulation Vapor Barrier layers of InsulationWater, Air, Vapor Control Membrane Concrete Control Membrane Concrete Control Membrane 13 Wall Finish Interior Metal Deck Interior Wall Finish Metal Deck Girder & 1’&deep Wide Flange Air Beam Control Girder 1’ deep Wide Flange Beam Membrane

Fully Adhered Roof Membrane Two layers of Insulation Control Membrane Metal Deck Girder & 1’ deep Wide Flange Beam

Drop Ceiling

Lighting Fixture Lighting Fixture Sprinkler Sprinkler Supply/ Return Air Air Vent Supply/ Return Vent

Concrete Vapor Barrior Insulation

14

Retaining Wall & Anchor

15

Polycarbonate Interior wall railing

16

Green Roof Drain

Single Pane Glass Perforated Concrete Cladding Springboard Floor Wall Construction Wood Cladding Insulation Vapor Barrier Concrete Interior Wall Finish

individual detailed sections

11

40


FLASHING COUNTERSPAR PAVERS

PAVER MOUNTS SPRINKLER SYSTEM HVAC AIR RETURN

PERFORATED CONCRETE CLADDING

SINGLE PANED GLASS GLASS MULLEAN WOODEN GLOORING WOOD SUBLAYER TIMBER FLOOR JOISTS RADIENT FLOOR HEATING WATER CONTROL MEMBRANE CONCRETE FLOOR PLATE VAPOR BARRIER RIGID INSULATION CONCRETE CLADDING

FLASHING COUNTERSPAR WOODEN LOUVER RIGID INSULATION VAPOR BARRIER ANGLED TIMBER BLOCK PLANT COVER GROWING MEDIA FILTER FABRIC DRAINAGE LAYER ROOT BARRIER HVAC AIR SUPPLY INTERIOR ROOF CLADDING TIMBER GIRDER SPRINKLER SYSTEM DOUBLE PANED GLASS MOTOR CONTROLLED LOUVER BRACKETS GLASS MULLEAN

12

structural axonometric


theatre 3 interior

structural axonometric

13


3

million sf2 master-planning project located in kendall square in an effort to redevelop the longstanding

volpe parcel. the project includes public spaces and parks, new bike and pedestrian paths, as well as housing,

retail, science, and innovation space. work for the project included parametric prototyping of facade designs and

3 dimensional additive manufacturing using the objet260 connex3 3D Printer, Stratys dimension 1200es 3d printer and fusion m2 40 Llzer cutter.

work completed alongside christine song, genevieve dominiak, tom carrier, and joe kile. all rights to elkus manfredi architects.

V

Volpe Development Project Cambridge, Massachusetts //

14

2021

//

Completed

at

Elkus Manfredi Architects


15


16

volpe composite model (showing retail and mixed use spaces)


parametric residential prototype

parametric commercial prototype

individual resin prototypes

17


interior museum and archive render

comprising of three primary components, the project becomes an antithesis, in experiencing the monumentalism from the inside, instead of seeing it from the outside.

An

out-of-this-world experience only able to be seen

when inside the space. through the first component, water, the project isolates itself from the city of syra-

cuse, becoming its own entity. the concrete walls that encase the above-ground institutions, become the sec-

ond component, further isolating the institutions that lay within its walls, and supporting and machining the

organism that is created. thirdly, and most importantly, the form that remains hidden, weaving through the water and the concrete, connecting and providing a new angle at which to view the above world.

project completed with rhinoceros

3 d,

grasshopper, ladybug, vray, keyshot, adobe photoshop, and adobe illustrator.

You Are The Fish Syracuse, NY // 18

2019


19


20

exploded structural axonometric

site p


plan

formal development axonometric

21


exterior underw

22

interior greenspace and sanctuary

interior cafe and recr


water render

reational space

above/below water line ramp

23


layers of skin, scales of segregation focuses on the fundamental issues within syracuse’s

the context of skin, the central factor to injustice.

Using

15th ward through

a series of tools, including a texture atlas as well

as methods of layering, compiling and cutting, the final intervention seeks to address issues of fragmentation and segregation within the site, through physical and visual means.

aiming to stitch together both sides of the site as a result of the separation invoked by the acts as a central spine, with the

I-81, jackson st

I-81 no longer present. working as a pedestrian promenade, a series of pro-

grammatic nodes are strategically placed along its intersections and a more curvilinear pathway connects

them by undulating across the spine. colour plays a pivotal role within the project, emanating visual and sensory cues to those that travel along its path. with a gradient shifting from yellow to purple, the colours signify programmatic shifts as well as symbolic, historical, and cultural associations.

major programmatic elements include a cooperative grocery store, a café, a performance space, a greenhouse/ bio-dome, a community center, a historical remembrance and memorial space, and finally, a library.

Undula-

tions in the curvilinear path work in tandem with the nodes. a strict drop in elevation upon encountering the

memorial space brings people in and amplifies its effects. a slight raise in elevation within the central communal spaces and main entrance to help elevate their importance.

project completed with rhinoceros

3 d,

vray, adobe photoshop, and adobe illustrator.

Layers Of Skin, Scales Of Segregation Syracuse, NY 24

//

2021

//

Work

completed alongside

Vera Marz

and

Shaan Lakshmanan


25


historical and educational node looking at library

26

communal perfo


ormance theatre

1-81 historical remembrance pavilion

27


site section demonstrati

28

spinal isolation

node development


ing undulating pathway

curvilinear node connection

walkway implementation with colour

29


interior photograph

focusing on the architectural period of brutalism, the soas library on the university of london campus in

bloomsbury, central london is an iconic piece of work designed by denys lasdun. the intent of this building

analysis was to formulate our own argument for the building’s architectural language and purpose, based on

our own thorough investigation and perception. inside out argues that the soas library is a fortress, acting as a mechanism for students and visitors alike to feel either excluded, and physically separated

(if

on the

outside), or included and sheltered in a ‘womb’ (if on the inside).

work completed alongside andrew d’angelo, emmei gootnick, wesley feero, jakub jankowitz, and jason moline. project completed with rhinoceros

Inside Out London, UK 30

//

2020

3 d,

grasshopper, vray, adobe photoshop, and adobe illustrator.


31


Repetitive facade imposes itself as barrier towards promenade 2012 additions cover balconies, further isolating interior and exterior

Moat separates library from street level

32

corner condition axonometric


exterior photograph

33


34


1

5

10

35


Coumba C. Kanté coumbackante.myportfolio.com cckante@syr.edu 202 .717.2858


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.