ALTERNATIVE MATRIX Architectural Project Process
Early unselected massing strategies
A
C
B
D
A and B show that originally there had been plans to integrate another building with the event center, most likely restuarants. These were changed due to a shift in the angle of the pedestrian path, and insufficient space.
C and D play with the idea of bridging across the pedestrian path to enlarge the event center. These were rejected as a bridge would have interrupted the view of the Boston Avenue Church at the end of the path.