Pipeline Road Phase 3
West Pipeline Road, Phase 3 is the third phase of a four-phase improvement project on Pipeline Road and encompasses the roadway between Lorean Branch bridge and Harrison Lane. The improvements include reinforced concrete pavement with stamped concrete medians. Street lighting will be installed in the median area. Sidewalks with pedestrian lighting are included in the project along with replacement of storm drains, water lines, and sanitary sewer lines. Phase 3 is currently under construction by Axis Contracting, Inc. for a bid amount of $5,567,520 with a bid time of 540 calendar days. Construction began in March of 2022 and is scheduled to be complete by the end of 2023.
High Density Mineral Bond
Advertisement
Approximately 6.1 lane miles received High-Density Mineral Bond labeled “HA5” in 2022. HA5 is a highly durable cover for the asphalt surface and is beneficial in extending the life of the asphalt pavement.
Fire Station #1
Due to a vehicular accident that struck Fire Station #1, the Facility Services staff performed emergency electrical room repairs for the facility.
Community Services
The Community Services Department initiated the replacement of the Hurst Public Library’s 40+-year-old HVAC system.

Small Gym
Flooring
Due to a fire suppression system leak, the Hurst Recreation Center replaced the Small Gym Flooring, which was turned into a functional training area.