Gortgonis Community, Health and Wellbeing Hub

Page 1

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

22 GORTGONIS ROAD, COALISLAND. SITE IS BOUNDED BY GORTGONIS ROAD, ULSTER CANAL AND HOUSING DEVELOPMENTS. REDEVELOPMENT OF GORTGONIS LEISURE CENTRE AND PLAYING FIELDS ALONG WITH ASSOCIATED DEVELOPMENT ACCOMMODATION

CONSULTATION MAGAZINE AUGUST 2021


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB


WELCOME Welcome to this online community consultation which Clyde Shanks is undertaking on behalf of Mid Ulster District Council. This consultation has been prepared to inform and seek feedback from the local community concerning the proposed: “Redevelopment of Gortgonis Leisure Centre and playing fields comprising of the demolition and general site clearance of existing facilities and erection of a new community, health and wellbeing hub on the Gortgonis site. The proposed community, health and wellbeing hub will house a community hall, gym, day care facilities and associated ancillary accommodation. It is proposed to replace the existing pitch with a floodlit 3G synthetic pitch and 6 lane running track with outdoor play areas. The site works to the new centre and recreation facilities include formation of new access, the addition of a right hand turn lane, car parking, pavements, fencing and amenity lighting.”

We warmly invite you to take time to absorb the work the applicant and their professional design and technical team have prepared to date to support the proposed development. Given the unprecedented impact of COVID-19 on the potential to carry out this type of consultation as an in-person event, it is now being carried out as an online event. The feedback received will then be reflected upon and responded to in refining the detailed design as part of the application to Mid Ulster District Council.

The development will take place at Lands at Gortgonis Park and adjacent to the Gortgonis Sports Pavilion, Gortgonis Road, Coalisland, Dungannon.

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

3


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

MA PL

MAPL EBROO K HIL L

INTRODUCTION

M

In light of the current COVID-19 restrictions, temporary pre-application community consultation regulations were introduced in May 2020, which removed the legislative requirement for a public event. Alternative consultation methods, such as online magazines, were encouraged. Therefore, Clyde Shanks Ltd are using online tools to assist you to review, consider and provide feedback on these development proposals

U O

RN

E

E AV

M

AP

MA PL EB R

LE

OO K

EB RO OK

W AY

GR EE N

BR

OO

K GR

RD

OV E

LO UG HV IE W

Your feedback on the proposed development is very much welcomed and all matters raised will be taken into consideration and reflected upon. We will prepare an updated report that summarises all of the feedback and how the design team has responded to this. This updated report will be submitted to Mid Ulster District Council as part of the planning application package.

MO YA L

LE N

TE R

RA CE

KN O

CK M

OY

TE RR AC E


CO AL IS L

AN D

CA

NA L

GO RT GO NIS RO AD

PK EN CT

AL TO W

DE RR YO W

EN

PL

GO RT V I EW PAR K

GO RT O W EN

MA

NO R

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

5


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

EXISTING SITE AND SURROUNDING CONTEXT The Site The Site extends to an area of approximately 5.14ha, is mostly “L” shaped and is located entirely within the administrative boundary of Mid Ulster District Council. The site is located adjacent to the Gortgonis Road and within the settlement development limit of Coalisland. It is currently occupied by the Gortgoins Playing Fields that encompass a soccer pitch and Multi-Use Games Area (MUGA) along with a significant community woodland area positioned to the north and east of the site.

View north west from Gortgonis Road

In terms of topography, the front section of the site gently slopes downwards from the Gortgonis Road to meet the edge of the existing soccer pitch and then slopes downwards further towards the rear of the site to the Canal. The Surroundings The surrounding area to the west, south west, south, south east and east is dominated by residential housing. To the north of the site is the Coalisland Canal and beyond this are further areas of residential housing. View south east from within site


View west from existing car park

View of MUGA from within site

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

7


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

LOCAL DEVELOPMENT PLAN AND PLANNING POLICY CONTEXT Section 45 (1) of the Planning Act (Northern Ireland) 2011 requires that all planning applications have regard to the local development plan, so far as material to the application, and all other material considerations. Section 6(4) states that in making any determination where regard is to be had to the local development plan, the determination must be made in accordance with the plan unless material considerations indicate otherwise. This is known as the Plan-led system. Local Development Plan Dungannon and South Tyrone Area Plan 2010 (DSTAP) The location of the application site is within the settlement development limit of Coalisland. Under policy ROS 1 it relates to “recreation and open space zonings” setting out that “Within areas zoned for open space, proposals will be determined in accordance with the provisions of prevailing regional planning policy.” In addition, within the DSTAP, the site is defined as an Existing Recreation and Open Space along with being a Community Woodland (CCW01).

The designation of CCW01 sets out within the DSTAP that this 3.1 hectare site is located between the canal and the existing playing fields at Gorgonis. It is proposed to plant this area as a community woodland for passive recreational purposes and to encourage wildlife. It is important that access is allowed to the woodland from the Canal footpath, playing fields and adjacent land designated for housing. Regional Planning Policy There are a number of Planning Policy Statements and other regional planning policy documents that are relevant to the assessment of the proposed development. These have all been taken into account in developing the proposed scheme and a supporting statement articulating how these have been compiled with will accompany the planning application.


DBMAP extract

DSTAP Extract

Strategic Planning Policy Statement for Northern A Strategic Planning Ireland (SPPS) Policy Statement for Northern Ireland (SPPS) Planning for Sustainable Development

Planning Policy Statement 2 Natural Heritage

Planning for Sustainable Development July 2013

SEPTEMBER 2015

1

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

9


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

PROPOSED DEVELOPMENT Design Progression The applicant’s vision for the site is to create an attractive, contemporary community, health and wellbeing hub that encompasses all the essential facilities that the local population would require. At the preliminary design stage this vision was characterised by a number of key design principles. These are as follows: •

The proposed new building to be multi-use to cater for all within the community throughout the day;

Facilities to include outdoor plays areas for children;

Ease of accessibility from community, health and wellbeing hub to pitch and running track;

Avoid the erection of a utilitarian building with a design that must be modern, whilst using materials that are robust but contemporary;

Vehicular access to be improved from Gortgonis Road with any necessary enhancements; and

Proposal needing to respect neighbouring properties and does not cause unacceptable impacts on their amenity by noise or being overbearing.


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

11


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

.0

NA

O/H

Ele c Wir

es

29

CA

L

.0

30 27.0

.0

Proposed foul drainage

.0

31

.0 33

28

.0

32

.0

26

CL= 30.500

DI

Y

.0 29

TC

H .0

26

.0

.0

34

30

ND

NA

L

.0 32

35.0 36.0

SIT

28.0

EB

.0 31

27

OU

CA

.0

AR

FLC

.0

33

DI

.0

29

FLC

TARMAC AREA

TC

H

.0

.0

34 30

.0

27

.0 36.0

31

36.0

0

00

.0 29

.0 33

36.0

26.0

35

.0

32

.0

28

.0

60

00

27

30.0

34

GRASS AREA

.0

FLC

Dug out

.0

34.0

30

2m wide footway

FLC

Gravel path

4.2m high perimeter pitch fence 31.0

36

.0

1.2m high spectator fence Spectator zone Path

32.0

4.8m High pitch Fence

.0

.0

35.0

35

28.0

Dug out

3G PITCH FGL = 34.00

29.0

33

27.0

00

00

10

30m

FLC

.0

34

Tarmac surface

FFL = 35.00

31

TR

FLC

K

AC

Running track - 5 lanes synthetic, 1 lane tarmac Ramp 1 in 21

37.0

Dropped Kerb

.0

36.0

30

Terracing .0

Gate

.0

PROPOSED LEISURE CENTRE

28.0

PLAY GROUP ENCLOSED PLAY AREA

GRASS AREA

32

35.00

29.0

35.00

Large designated parking bay 4.8 x 8m

.0

Dropped Kerb with tactile surface for Acc. Parking

Retaining wall along ramp 1.2m high spectator fence

.0

Ke

35.30

31

Mobility Scooter Parking area

30.0

PAVED AREA

34

35.00

1.2m high hoop-top fence

1.2m high hoop-top fence

.0

35.30

4.2m high perimeter pitch fence

Accessible parking

34.00

.0

37

.0

35.30

36

Gate

PARKING 78 SPACES

FLC

Gate

Maintenance access

2m wide footway

al

l

36.00 36.90

RA

Employee accessible bay

JUNIOR PLAY AREA REFER TO DRAWING 1610-01/N02

M

P

584m2

Staggered pedestrian barrier

35.0

Long jump sand pit (9.0 x 5.19m)

.0

37.85

37.80

35.0

37.87

35

W

TARMAC AREA

33.0

30m

.0

rb

32

l

35

al

.0

W

33

SENIOR PLAY AREAREFER TO DRAWING 1610-01/N01

1000m2

1.2m high hoop-top fence

35.50 35.70

RA

Set down point

M

P Ke

rb

FLC

36

.0

Dropped Kerb

35.15

Covered cycle stands

80

.0

37

2

00

34.75

Gate

0m

New low level fence to match existing to be installed behind sight line

rb

vis

35.90

ibil

ity

30m

sig

ht

GRASS AREA

PROPOSED PRIMARY SCHOOL DEVELOPMENT PLANNING REF: LA09/2016/1101/F

Manual vehicle barrier

lin

e 36.25

R12000

Ke

36.35

73

00

Proposed access point to school site

.0

x9

36

4.5

36.13

Grass crete maintenance access Dropped kerb for maintenance access

36.65

R1

200

vis

ibil

ity

.0

mp

sig

ht

line 4.5

37

Proposed NIE Sub-station

DENOTES OUTLINE OF TEMPORARY CAR PARK

x9

0m

vis

.0

0m

36

0 Ra

x9

.0

mp

37

4.5

Ra

ibili

ty s

igh

PROPOSED SCHOOL ENTRANCE

t lin

e 38

.0

Ke

rb

Wa

ll

New low level fence to be installed behind sight line to match existing Ke

rb

Proposed kerb line Existing kerb line

New low level fence to match existing to be installed behind sight line

Wa

ll

Ke

rb

4.5

SiteProposed layout plan Site Layout

x9

0m

vis

ibili

40.04

ty s

igh

t lin

e

SIT

EB

OU

ND

AR


Rev 11: Enabling works car park realigned and fence amended behind sight lines Rev 10: Footprint amended, dropped kerbs added revisions:

project:

BM BM BM BM BM BM BM BM BM

IRB IRB IRB IRB IRB IRB IRB IRB IRB

22-06-21 31-03-21 25-01-21 22-12-20 14-12-20 09-12-20 30-11-20 22-10-20 15-10-20

GB

IRB

13-10-20

drawn:

approved:

date:

Figured dimensions only should be used. Dimensions should not be scaled from drawings. The contractor is to interpret the dimensions on the drawings and is to satisfy himself to their accuracy on-site. Dimensional conflicts and drawing errors are to be reported to the Architect. All drawings are copyright of the Architect.

Gortgonis Community Hub drawing title:

Proposed Site Layout drawn by:

approved:

date:

IRB

job no.

1:500@A1

stage:

1

P:\1610

gregory architects

scale:

01-06-18

cad source: dwg no.

1610-01

SK11

revision no.

19

4 crescent gardens, belfast bt7 1ns t: 028 9032 6548 f: 028 9023 6159 e: info@gregoryarchitects.com www.gregoryarchitects.com

CA

NA

L

26

.0

DI

TC

H

DI

TC

25

.0

H

CA

Typical Paladin Fence Panel

NA

L

25.0

26.0

DI

TC

H

.0

.0

27

26

.0

DI

28

TC

H

29.0

26.0 .0

Fence Panel Elevation Scale 1-50

27

30.0

.0

28

27.0

KEY:

29.0 31.0

FLOOD LIGHTING COLUMN

28.0

30.0

XX.XX

PROPOSED GROUND LEVEL

31.0

29.0

32.0 32.0

30.0

33.0 31.0 34.0

PROPOSED SCHOOL ENTRANCE

32.0 33.0 .0

34

vis

ibili

ty s

40.04

igh

34

.0

0m

36

Existing kerb line

x9

.0

4.5

.0

New low level fence to match existing to be installed behind sight line

35

t lin

e

Kerb

es=44.8 Eav

Ridg

e Line

0

=47

.0

.61

Proposed kerb line

37

RY

Rev 19: Site Boundary and path beside primary school adjusted Rev 18: School entrance position adjusted Rev 17: Right turn lane reintroduced, sight lines adjusted Rev 16: Pedestrian crossing added, kerb realignment highlighed Rev 15: School Entrance updated Rev 14: School Entrance updated Rev 13: Entrance widen from 6m to 7m Rev 12: Kerb & Verge lines highlighted

Ker

b

Ra

mp

Ridge=43.95 Eaves=41.70

Ra

mp

End of wearing course replacement and road widening

O/H

Ke

all

D/

W

rb

Proposed location of puffin crossing. Location to be agreed with DfI Roads

Elec

Wires

Ke

rb

Ke

Ridge=45.58 Eaves=43.33

rb

Ke

rb

Proposed Road Crossing

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

13


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

PROPOSED DEVELOPMENT

Continued

Proposed Design These principles were the starting point for the development of the initial design, along with the results of site surveys undertaken by the appointed environmental and technical consultants, and feedback from previous engagement with the local community. The proposed design as shown in this consultation illustrates the proposal that best represents the needs of the community. The collaborative design approach that has been undertaken with consultants has been essential to ensure the proposed scheme fulfills good design objectives and place making principles. The proposals as presented in this consultation incorporate the following elements: •

New community, health and wellbeing hub to include fitness suite and changing facilities;

Formation of meeting rooms/studios;

Creation of a community hall that would seat approximately 225 visitors;

Inclusion of day care facilities and ancillary accommodation;

An aim to achieve a disability Sport NI inclusive sports facility accreditation

Replace existing pitch with a floodlit 3G synthetic pitch;

Creation of a 6no. lane running track and outdoor play areas;

Provision of in-curtilage parking totaling 78no. spaces; and

Road safety improvements through the upgrading of the existing access and creation of a right turning lane area.

CGI of front elevation


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

15


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

1

Area 49.5m² HIC 1.0m

+0.15m

17

+0.30m +0.45m

4

13 +0.60m

6 7

9

+0.75m +0.9m

10

15

+0.9m +0.75m m 8.5 a2 m Are 1.0 HIC

+0.60m

8

²

14

16 +0.45m

+0.30m +0.15m

12

5

11

.0

.0

37

36

HIC 1m 23m²

3 2

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

Sutcliffe Orchard Twin Peaks OTW105 Sutcliffe Orchard 1.8m High 4 seat cradle with anti-wrap bearings OSB064 Sutcliffe Dish Roundabout SWD100 Sutcliffe Small Seesaw TNB030 Sutcliffe Sensory Sound Flower MTU010 Fahr Ladybird Springer Fahr Bumble Bee Springer Fahr 0.9m high stainless steel slide with entry panel Playforce EYFS Journey Trail 5 Playforce EYFS Forest Scrambler Playforce Hump Back Bridge and Tunnel Playforce Stepping posts (set of 6) Allplay Pull Up Ramp ILP Mushrooms (Set of 4) Fahr underground tunnel 3m long Sutcliffe Toot & Slide Sutcliffe Fergus 4 x 4 Seesaw

Bitmac Pathway

Grass Mats

Resin Bound Mulch

revisions:

drawn:

approved:

Figured dimensions only should be used. Dimensions should not be scaled from drawings. The contractor is to interpret the dimensions on the drawings and is to satisfy himself to their accuracy on-site. Dimensional conflicts and drawing errors are to be reported to the Architect. All drawings are copyright of the Architect.

date:

project:

30m

Gortgonis Leisure Centre

drawing title:

Junior Play Area - Proposed Layout & Equipment

drawn by:

Ke

rb

gregory architects

approved:

OA

date:

IRB

job no.

NTS@A3

stage:

Planning

p:\1610-01\Sketch\N02

1610-01

scale:

04-07-19

cad source: dwg no.

N02

revision no.

-

4 crescent gardens, belfast bt7 1ns t: 028 9032 6548 f: 028 9023 6159 e: info@gregoryarchitects.com www.gregoryarchitects.com

Junior play area layout plan

indicative image


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

17


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

indicative image Holmes Street elevation


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

19


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

indicative image


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

21


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

indicative image


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

23


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

ENVIRONMENTAL MATTERS

ROADS A transport consultant was appointed to advise on access and parking matters. The site and the surrounding lands have been accurately surveyed to assist in the design of the proposed access. A Transport Assessment Form (TAF) has been completed and submitted with the planning application that was completed by AECOM. The purpose is to assess the transport impact and identify the level of parking required for the proposal in the context of its site and policy specifics. The completed TAF concluded that: •

The site has good accessibility to public transport, with high quality pedestrian facilities in vicinity of the development;

To encourage travel to the site by sustainable modes, the development will provide the following: •

28no. cycle parking spaces;

Showers, changing facilities and lockers for cyclists at the community, health and wellbeing hub; and

78no. parking spaces at the community, health and wellbeing hub to accommodate events as well as additional visitors.

On the basis of the above, it was concluded that the development would not have a significant impact on the environment, in transportation terms.


ECOLOGY A biodiversity checklist and preliminary ecological appraisal has been undertaken across the site by a qualified ecologist. This has not identified any significant ecological constraints to the development. DRAINAGE A Drainage Assessment has been undertaken for the proposed development in relation to drainage and flooding. It is concluded within the report that: •

The proposed development is outside the areas for fluvial, coastal and pluvial floodplains; and

Neighbouring properties will not be impacted as a result of exceedance of the storm system.

Detailed reports setting out the findings of the appointed consultants, their assessment of the proposed development and any proposed mitigation measures will accompany the planning application.

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

25


GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB

HOW TO SHARE YOUR VIEWS You can leave your feedback, raise questions or leave your contact details if you require further assistance on our website www.clydeshanks.com . You can also attend one of our virtual consultation events which will take place via Zoom on: • Monday 9th August 2021 (10am - 11am); and • Monday 9th August 2021 (6pm – 7pm). Should you wish to register for the digital information event please request this by emailing gavynsmyth@ clydeshanks.com, specifying the suitable time slot. If you wish to discuss the proposal you can also do so by: Telephone - 02890434393 Email - gavin@clydeshanks.com Post – Clyde Shanks Ltd, 2nd Floor, 7 Exchange Place, Belfast, BT1 2NA

REQUEST PRINTED COPY

If you would like to receive a printed copy of this magazine, we can post this out to you on your request, accompanied with a feedback form.

DEADLINE

Please note all comments should be with Clyde Shanks Ltd no later than 23rd August 2021.


WHAT HAPPENS NEXT? We thank you for taking time to review the content of this consultation and would be delighted if you would share your thoughts on what you have seen, and the prospect of the proposed development proceeding through planning. Following the end of the consultation period (23rd August 2021), your feedback will be taken into consideration in finalising the proposed development. Once the planning application has been submitted, the opportunity for further public engagement in the decision-making process will take place in the normal manner through the submission of representations to the Council.

GORTGONIS COMMUNITY, HEALTH AND WELLBEING HUB |

27


2nd Floor 7 Exchange Place Belfast BT1 2NA t | 028 9043 4393 clydeshanks.com


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.