Air Quality Delivery Work Plan

Page 39

11. Review This AQ DWP is a live document that will be reviewed and updated at least annually, or as a result of a material change to the main works, identification of increasing dust levels or potential for nuisance identified in monitoring required under this DWP, or to address unforeseen adverse air quality effects arising from construction, or unresolved complaints. Refer to sections 1.9 and 6.7 of the CEMP for further detail on the review and updating process Approval from Auckland Council will be required for any relevant revisions of the AQ DWP that are of a material nature. A annual review of the AQ DWP will take into consideration: Compliance with the designation or consent conditions, the CEMP, DWPs and MPs (including site specific plans) and material changes to these plans Any significant changes to construction activities or methods Key changes to roles and responsibilities within the main works team Changes in industry best practice standards Changes in legal or other requirements (social and environmental legal requirements, consent conditions, relevant policies, plans, standards, specifications and guidelines) Results of inspections, monitoring and reporting procedures associated with the management of adverse effects during construction Comments or recommendations from Auckland Council regarding the CEMP, DWPs and MPs Unresolved complaints and any response to complaints and remedial action taken to address the complaint Any further information obtained in relation to the presence of hazardous material in dust emissions from construction activities at the Site including composition levels of silica, asbestos, erionite or other hazardous material4. Reasons for making changes to the AQ DWP will be documented. A copy of the original AQ DWP document and subsequent versions will be kept for the main works records and marked as obsolete. Each new / updated version of the AQ DWP documentation will be issued with a version number and date to eliminate obsolete AQ DWP documentation being used. A summary of the review process will be provided annually to Auckland Council and made available to Council on request.

4

Receipt of further information relating to increased levels of hazardous material in dust emissions from the Site may initiate a review of this DWP. Page 39 | Mount Eden Enabling Works


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Air Quality Delivery Work Plan by City Rail Link Ltd - Issuu