Permit Requirements for Installing Temporary housing

Page 1

HELPING YOU SETTLE IN

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING If you’re looking to set up a temporary house on your lot while you rebuild, we can help. For those in the Resilient City zone, temporary housing units will be allowed to be used from now until October 9, 2020. N O T E To ensure the safety of our community, permits will not be issued until the Cleanup/Debris Removal Process has been completed and all documentation and testing information has been received and approved by the City.

Additional information regarding the Santa Rosa rebuilding effort available online: SRCity.org/rebuild SonomaCountyRecovers.org

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

1


PROCESS RULES FOR TEMPORARY HOUSING 1.

Finish Cleanup/Debris Removal Process.

2. Prepare your documents for submittal. 3. Schedule an appointment for review by calling 707-543-4649 or visiting the counter at the:

R E S I L I E N T C I T Y R E B U I L D I N G P E R M I T C E N T E R 1 0 0 S A N TA R O S A AV E N U E , R O O M 6

We want to get you in your temporary residence as quickly as possible. To do so, your plans should follow these guidelines.

General Guidelines Recreational Vehicles (RVs), Modular Homes, Tiny Homes, and Mobile Homes are permitted to be installed on residential properties that have had the primary dwelling

S A N TA R O S A , C A 9 5 4 0 4

N O T E Scheduling your appointment is easy and could save you time!

damaged beyond habitability, or destroyed.

4. Receive building permit. 6. Reinstate electric power through PG&E.

damaged dwelling.

Temporary housing must be installed within the property boundaries and outside of any rear or side yard setbacks. Please verify setbacks for your parcel are shown

7. Reinstate sewer and water service. Contact Water Engineering Services at 707-543-4200. 8. Place or build your temporary home!

N O T E Temporary housing can only be installed on the same property of the destroyed/

consistent with the planned district. Temporary units cannot encroach on any existing drainage, utility or access easements. Modular or mobile homes must be connected to electricity, sewer, and water. If applicant wishes to connect to any of these; the plans must show how and where each

PLAN REQUIREMENTS 1. Provide a site plan for your Temporary House, including all dimensions (3-copies). 2. Indicate if unit is an RV, Modular Home, Mobile Home, or Tiny Home. For modular, mobile and tiny homes, indicate if the unit is factory built and state approved.

3. Indicate locations of Electrical, Water, and Sewer connections (if applicable). 4. If the unit is a Modular Home, Mobile Home, or Tiny Home; please provide copies of

connection is made.

N O T E RVs are not required to be connected to electricity, sewer, or water.

“Tiny Homes” must meet the requirements and be certified by the appropriate State Agency as a Manufactured Home (“MH”), Factory-Built Housing (“FBH”), Recreational Vehicle (“RV”), Park Trailer (“PT”), Camping Cabin (“CC”), or meet (and be reviewed and inspected for compliance-with) California Residential Code or California Building Code (CRC or CBC).

If a Tiny Home is designated as an RV, connection to electricity, water and sewer are not required. If it has any other designation – connection is required for electrical, water and sewer.

HCD approval and HCD-approved foundation system; or conventional foundation system designed by a California licensed structural or civil engineer.

2

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

3


WATER AND WASTEWATER CONNECTION GUIDELINES, if applicable

CITY STANDARD 875

A double check backflow preventer, per City Standard 875 (attached), shall be installed on all domestic water connections prior to allowing a temporary connection to the City’s public water system. The backflow device shall be tested by a certified backflow tester on the City’s Water Quality Backflow Tester List (see attached list) prior to allowing onsite use. N O T E The backflow device will need to serve the future permanent structure and meet the flow demands associated with a fire sprinkler system. A minimum 1” device is recommended.

In addition to the backflow device, the private water service must be extended at least 10’ and terminated with an above ground hose bib. For any properties served by Advanced Metering Infrastructure (AMI), an inline dual check may be installed in place of the double check backflow device shown on the attachment. Similar to the double check backflow preventer, all inline dual checks should be sized to meet future fire sprinkler demands. Inline dual checks must initially be tested by the Water Quality division prior to the service being turned on and will not require annual testing. The device shall be replaced or repaired once every 10 years. N O T E To determine if the public water system in your area has been configured for AMI, contact Water Billing at 707-543-3150

Connections to the public sewer system will be based on the specific unit type being erected or placed on the site. The attached detail showing a temporary sewer disposal station will be allowed for RVs and any trailers with a similar discharge line. The existing sewer line must be inspected by a plumbing contractor and the resulting video images and a written summary report must be submitted to the site inspector. Any fire damage to the existing sewer line must be addressed prior to allowing discharge to the sewer system. N O T E If water was not turned on to the property as part of the Debris Removal Process, contact the Water Engineering Services division at WaterEng@SRCity.org or 707-543-4200 to request that your water be turned back on.

All properties that have completed the Debris Removal Process and have had their sewer laterals capped, will be required to re-establish a connection to the existing private sewer lateral. Properties that have ‘opted out’ of the global cleanup program will be required to show proof that the private lateral and connection is not damaged and in working order. Connections may not be available for highlighted properties shown on the attached Sewer Lift Station maps until public sewer infrastructure is repaired. Contact Water Engineering Services to learn more WaterEng@SRCity.org or 707-543-4200

4

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

5


TEMPORARY SEWER DISPOSAL STATION CITY’S WATER QUALITY BACKFLOW TESTER LIST BACKFLOW TESTING, INSTALLATION AND REPAIR Santa Rosa Water Department - Water Quality Division 35 Stony Point Road - Santa Rosa, CA 95401 Phone: (707) 543-3965 - FAX (707) 543-3937 Name ABP Backflow, Inc. ACCO Engineered Systems

Address 1599 Felta Ridge Rd, Healdsburg, CA 95448 1111 Aladdin Ave, San Leandro, CA 94577

Phone FAX or Email 888-356-7761 service@abpbackflow.com 510-346-4300

License 1032328 120696

All Pro Backflow/Jon Lotito

P O Box 2193, Folsom, CA 95763

916-276-7162 916-435-4167

934557

ASTI Services Inc/Mike Deschler

102 Couch St, Vallejo, CA 94590

707-645-1782 707-645-1807

742693

Banner Enterprises

P O Box 1457, Santa Rosa, CA 95402

707-523-1244

376828

Bartley Pump Inc

4000 South Moorland Ave, Santa Rosa, CA 95407

707-584-9191 707-584-9198

200068

C V Plumbing /Chris Vine

P O Box 219, Cloverdale, CA 95425

707-894-8580 707-894-9642

843366

Cagwin & Dorward

P O Box 1600, Novato, CA 94948-1600

800-891-7710 415-897-7864

202399

Carrier Corporation

600 McCormick St, Ste B, San Leandro, CA 94577

510-347-2000 510-347-2099

499642

Checkrite Backflow/Chuck Schoop

3618 Chanate Rd, Santa Rosa, CA 95404

707-575-5296 707-578-6595

836022

Devoto Plumbing Co*

1345 Triple Oak Way, Fulton, CA 95439

707-545-0734 devotoplumbing@comcast.net

824608

Economy Plumbing

P.M.B. #287/1275 4th St, Santa Rosa, CA 95404

707-545-4455 707-543-8111

748220

Ground Hog Construction

5353 Hessel Rd, Sebastopol, CA 95472

707-529-2085 707-823-9389

723766

Heathorn Mechanical Services

1155 Beecher St, Ste 100, San Leandro, CA 94577

510-569-1300

972103

JV Plumbing & Backflow/Jorge Valencia* 2911 Montecito Ave, Santa Rosa, CA 95404

707-799-2692 jvbackflowtesting@yahoo.com

955698

LeDuc & Dexter Plumbing Inc

2833 Dowd Dr Ste A, Santa Rosa, CA 95407

707-575-1500 707-527-0281

651401

Northbay Backflow/Aaron Robello

P O Box 2765, Petaluma, CA 94953

707-484-3949 northbaybackflow@comcast.net

878332

Northwood Backflow Service

911 Lakeville St #369, Petaluma, CA 94952

800-750-4547

749187

Ongaro and Sons Plumbing

2995 Dutton Ave, Santa Rosa, CA 95407

707-579-3511 707-579-0842

215233

R H & Sons Water Services

225 Golden Ridge Ave, Sebastopol, CA 95472

800-675-3569

698774

Roberts Mechanical & Electrical Inc

4649 Dowdell Ave, Santa Rosa, INSTALLATION CA 95407 707-584-5880 BACKFLOW TESTING, AND REPAIR

Robertson's Backflow

6229 Spreckled Rd, Pollock Pines, CA 95726

Roto Rooter/Jerry Bristol

1244 Central Ave, Santa Rosa, CA 95401

Scott Cramer Plumbing

P O Box 750084, Petaluma, CA 94975-0084

556014

530-306-1056 530-303-1497

972547 Santa Rosa Water Department - Water Quality Division 707-578-5885 35 Stony Point Road - Santa Rosa, CA 803644 95401 707-778-8789 707-658-1043 889152 Phone: (707) 543-3965 - FAX (707) 543-3937

Stead Backflow Prevention 2715 W Kettleman Ln, Ste 203-321, Lodi, CA 95242 209-327-3900 848490 Name Address Phone FAX or Email License Super Service Plumbing P O Box 11157, Santa Rosa, CA 95406 707-544-6444 707-527-0281 NOTICE: STATE LAW REQUIRES ANY PLUMBING WORK EXCEEDING $500 MUST BE COMPLETED BY A LICENSED651401 The Backflow Guy IncTHE TESTERS BELOW 305 Vineyard Town Ctr #353,AMorgan Hill, CA 95037 877-384-3489 932357 CONTRACTOR. DO NOT HAVE CALIFORNIA STATE CONTRACTOR’S LICENSE. Tri-Signal Integration Inc

5007 Windplay Dr, El Dorado Hills, CA 95762

916-933-3155 916-933-4157

Safe Water Backflow/George Davis

1630 Elmwood Terrace, Santa Rosa, CA 95401

707-217-4779

758792

NOTE: These contractors have a C-36 or C-16 State Contractor's License or an A-General Engineering License. They are licensed and certified to test, repair, and install any type of backflow device. When installing a backflow device, a City Plumbing Permit is required, and if working in the City right-of-way, an Encroachment Permit is needed. All testers are required to have a City Business License.

*Bilingual (Spanish)

over

11/2/2017

6

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

7


SEWER LIFT STATION MAP

4008

DR

K OO BR R 3977 EA CT CL

3971

3979

SLS03

3974 3970

3982

3958

3959

A PE T PL

3952

M

D

3940

3912 3914

D

I F L I N T R3911 D R 3906

3917

N W

3929

3918

3900

3930

3884 3876

3875

3870

M AR YF SK

CT

3951 3819

3815

SK 3836 YF A

3828

RM

3823

3830

DR

3824

3817

3811

3818

3788

3784 3780 3776

100 124

148

3651FIR 3675 RID3644 3659 GE DR 3663 3679 3776 3735 R 3683 3773 3772 3726 D 3751 3750 3641 3691IR 3768 3733 3724 GE 3664 3753 3752 3746 3639 F 3769 D 3764 3731 3722 RI 3668 3747 3748 3749 3765 3742 3699 3720 3745 3761 3760 3729 3743 3744 3738 3757 3729 3753 3672 3740 3725 3726 3727 3739 3749 3627 3725 3724 3723 3745 3736 3623 3735 3722 3741 3721 3714 3720 3737 3784

3728

SS CRO K RD E CRE

3834 3840

3846 3840

MEADOWCRO FT WAY

3687

WOODBOURNE PL

DR

GLEN 3852 3845 EAGLE CT

3855

8

3945

3950

RF OX

3798 3792 3796

3858

3850 3846

SILV E

3850

3863

3851

3944

3939

3875

3924

3894 3888

3881

3940

AN SA DR

3906

3893

GE

3921

R

EEK RD

3918

SLS21

D

3933

3410

3931

S CR CROS

3930 3926 3924

3932

SAINT REWS DR T R AND SAIN EWS D NDR NT SAI S DR A EW DR AN

3901

3936

3927

T IN S DR EW

3940

3926

3936 3912

HIDDEN HILLS DR

3937

R

3911 3917 3905

3939

3931

3935 3923

SLS21

3941

3906

T IN S A E WS DR

3941

3912

3920

AR

SLS05 3943

AN

YF SK

3945

SLS04

3942

3944

3949 3951

3952

SLS03

3946

3909

3922

3905 LE 3926 LG

3935

3955

3926

3938

3966

3949

SLS05

SAINT WS DR E ANDR

3957

3959

3923 3925

3917

3978

3962 SLS02

3959

3953

3929 3932

OLD VIN EYA RD LN

3986

3988

SLS02

F RID IR GE DR

830

3965

N

810

LiftStationTribArea

CR CRO EE SS K RD

4010

MEA DO W WA CRO Y FT

R MD R 3981 A YF SK

820

Legend

1033

N

772

4014

1055

4030

RM

4000

840 774

4020

4016

SK YF A

4004

FAW NG PL LEN

770

Y SK

DR

NE TO AYS GR PL

754

SPLIT RAIL C4001 T

RM FA

LLIO STA E DR

T ER

W EST MAR K S RD G SPRIN

4011

SS D O KR CR EE R C

TWA QUIE

4005

1125

STA DR LLION E

4015

Skyfarm Lift Station "A" SLS02 Tributary Area

SUNDO WN CT

S TR UND L O

1169

4021

STALLION DR E

D SS R O K R E C RE C

1130

4004

SLS04

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

9


SEWER LIFT STATION MAP continued Hansford Ct Tributary Area Legend LiftStationTribArea SLS20

¹

Your address must be clearly displayed on the parcel for emergency service purposes.

SLS20 3978 AM BE R

3972

3975

FIRE REQUIREMENTS

2500

Temporary housing units shall be placed on the site to ensure that the furthest portion

L

N

3966

4511

Specify size and dimensions on site plan.

of the unit is no further from the public street than 150 feet.

4485

PAR HIL KER LR D

RD

3960

NSFO HA CT

3969 4176

3948

3954

ELECTRICAL CONNECTION GUIDELINES

3935 PARKER HILL RD

4504 3942

3936 4796

Once a building permit is issued for the placement of the unit on the property, an

4788 3923

3930

application must be filed with PG&E to reinstate electric power. Additional details regarding

3924

HANSFO

RD CT

3929

the application process may be obtained at www.pge.com/CCO. The customer is responsible for installing the temporary power pole, panel, and

3912

weather head. Installations must meet PG&E’s Green Book specifications, which can be obtained at www.pge.com/greenbook. PG&E is responsible for installing the service

3918

4780

and the meter. Inspection of your temporary electric power is included in your building

3915 3906

permit. Overhead temporary power lines will be limited to 100’ between the PG&E pole and

3911

4326

temporary power pole.

3903

3900

2201 FOUNTAINTGR PK WY

City inspection staff must approve the installation of the temporary panel prior to meter setting.

OVE

2230 FO

A

IN

G VE O R

2241

3923 UN T

W PK

2237

3919

Y

2219 2251 2247 2257 2233

10

3915

NEWGATE CT

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

11


WE’RE HERE TO MAKE THIS AS SIMPLE AND EFFICIENT FOR YOU, SO YOU CAN GET YOUR TEMPORARY HOUSING BUILT. If you have any questions, call 707-543-4649

PERMIT REQUIREMENTS FOR INSTALLING TEMPORARY HOUSING

12


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.