Annual Report 2019-2020

Page 40

Lewis Road Slow Point

Mack Place Share Path

Pickering Brook Road Information Bay Construction of the parking bays on Pickering Brook Road, near Canning Road intersection. Work included, storm water modification, bay construction, kerbing and line marking. Lesmurdie Road bus stop renewal

Berberis Way drainage upgrade

Pickering Brook Road information bay

3.3.1 Facilitate and support the success and growth of industry and businesses

Berberis Way

40

The Kalamunda Moving Reference Group was established to assist with developing the City’s overarching vision for transport in and around the area, as well as assist with a number of student research projects proposed through the universities. 3.3 To develop and enhance the City’s economy

Drainage To mitigate the flooding issues on Berberis Way in Forrestfield, additional drainage pits and pipe were installed.

Kalamunda Moving Transport Strategy

Holmes Road drainage upgrade

Holmes Road drainage work

Bus shelter

To improve our drainage network a section of Holmes Road that was eroded and causing safety concern were piped last year.

As part of our renewal program two bus shelters on Hawtin Road and Lesmurdie Road were installed.

City of Kalamunda Annual Report 2019-2020

Economic Development Strategy implementation The City’s Economic Development Strategy is committed to promoting sustainable economic growth and has four major priorities:


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Annual Report 2019-2020 by City of Kalamunda - Issuu