0910 EVALUATING PERFORMANCE: MONITORING AND AUDITING

Page 132

EVALUATING PERFORMANCE: MONITORING AND AUDITING

121

Baseline; Monthly/ yearly (taxa and ecosystem specific)

Indicator species (e.g. algae, micro/ macroinvertebrates, fish, other vertebrates); refer to biodiversity management handbook

Indicator species (e.g. algae, macroinvertebrates, fish, larger vertebrates); refer to biodiversity management handbook

Flow regime alteration (see above—Hydrology)

Passage design and operation; organism passage and persistence upstream and downstream

Aquatic ecosystems— reference and impact sites (ambient)

Aquatic ecosystems—direct toxicity assessment

Aquatic ecosystems— environmental flows

Aquatic ecosystems— organism passage

Baseline (passage requirements of aquatic and riparian biota)

Baseline (hydrology; flow dependency of aquatic and riparian biota)

As appropriate for pilot plant/ bench test effluents

Baseline/seasonal (late dry season to determine water source(s) used by potential GDEs)

Indicator species of riparian flora/fauna—determine if groundwater/baseflow dependent ecosystem (GDE) (ground and surface water monitoring as well as water use by plants to determine if dependent upon baseflow or other water sources)

Riparian ecosystems— reference and impact sites (ambient)

Exploration/ feasibility phaseb

Parameters

Element

Yearly/event-based

See above (hydrology, aquatic and riparian ecosystems)

(continued)

Minimal alteration of organism distributions. Organism passage rates unchanged.

Minimal alteration of flow regime, particularly base flows and timing and frequency of peak flow events. Flow dependent ecosystem status. Minimal alteration of organism distributions.

See above (hydrology, aquatic and riparian ecosystems)

Yearly/event-based

Trigger value as determined by ANZECC & ARMCANZ (2000) procedures.

As required

Reference site aquatic fauna/flora.

Half-yearly (seasonal)/ yearly

Monthly/yearly (taxa and ecosystem specific)/ eventbased As required

Baseline and reference site data. Target set by groundwater extraction rates for drawdown or other potential impact and monitored signs of tree stress/decline.

Performance evaluation criteria

Seasonal

Closure/post-closure phase (e.g. 3+ years)

Seasonal

Construction/ operations phase

Indicative frequencya


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.