March 2012 Chronogram

Page 25

captions

Top left: Environmentally friendly white pine was used throughout the house. The railing was fabricated by a local craftsman. Top right: The bathroom tiles are cut limestone with visible embedded fossils. Bottom: The southern-facing portion of the house with second-floor deck off master bedroom. As finances allow, the couple will expand the bluestone patio and add permaculture.

3/12 chronogram home 23


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.