NEWS DESK
Police patrol Teens bashed TWO friends in a group of five walking home in Carrum with takeaway were knocked to the ground and kicked in the head several times, 9.30pm, Friday 17 March. Chelsea police said the teenagers were walking along McLeod Rd from Station St when they were approached by three men and two women from Valetta St. One of the group, 19, was singled out by the offenders and punched and kicked to the head causing “significant” facial bruising later needing stitches. When his friend intervened, he, too, was punched and kicked to the head. The offenders then stole a backpack and fled. Later, two of the female offenders returned the backpack but a wallet and keys were missing. Police patrolled the area but could not find the attackers. The victim was taken to Frankston Hospital for treatment. Anyone with information is urged to call Crime Stoppers 1800 333 000.
Off-duty officer attacked AN off-duty policeman was allegedly assaulted at Edithvale golf course by a drunk, 3.30pm, Sunday 19 March. Mordialloc police said the officer was finishing a game of golf with his brother when a man emerged from the clubhouse in a “drunk and aggressive” state after being refused service. He had reportedly been drinking since 9am. Police said the officer showed his badge and asked to man to calm down. The offender allegedly attempted to headbutt him and, soon after, swing a punch. The officer wrestled the man to the ground and, with his brother, held him down until police arrived. The man allegedly bit the officer on the arm causing bleeding and bruising. Police reportedly had trouble handcuffing the man who was “extremely aggressive”. He was taken to Moorabbin police station and charged with assault police, resist arrest and recklessly causing injury. The man was bailed to appear at Frankston Magistrates’ Court in May.
Hastings most costly port option Keith Platt keith@baysidenews.com.au THE latest “discussion paper” released by Infrastructure Victoria estimates building a container port at Hastings will cost more than double that of developing a new port at Bay West, inside Port Phillip. Using scenarios based on ships capable of carrying either 14,000 TEU (based on 20 foot long containers) or 18,500 TEU, the paper puts the cost of developing Hastings to handle nine million TEU a year brought in by the smaller vessels at $12.8 billion; building Bay West for the same number of containers is $6.14 billion. When the larger ships are taken into account, costs at Hastings go to $12.9 billion as opposed to $6.4 billion at Bay West. Taken to their ultimate third stage of development, a container port at Bay West would require close to 30 million cubic metres of dredging and 47 million cubic metres for Hastings. The Bay West proposal near Werribee involves using dredged material to build an “island”. Material dredged from Western Port would have to be dumped 50 kilometres offshore in Bass Strait, with 18 million cubic metres of suitable sand then being brought back from the same area for reclamation works. The 30 kilometres of shipping channels into Western Port will need 2.6 million cubic metres of dredging to accommodate the larger ships (18,500 TEU), but the actual port area will require a further 21.6 million cu-
INFRASTRUCTURE Victoria’s latest discussion paper suggests - subject to further investigation - that ships carrying vehicles to the Port of Melbourne and those servicing Tasmania could eventually use ports either at Geelong or Hastings.
bic metres of dredging. The Bay West/Hastings comparison is designed to help the state government choose one of the two sites for the state’s next container port. Infrastructure Victoria states that while it might be “technically possible” to increase capacity at the Port of Melbourne “by four or five times” it is also working towards finding a “tipping point” as to “when it may be more practical to create additional port capacity at a second container port”. As it edges closer to recommending either Hastings or Bay West as the site for a second container port, Infrastructure Victoria has ruled out Geelong or Portland. With a required lead-in time of 15 years for planning and construction of a new port, the government agency is set to make its preferences known to the state government in May. The paper released earlier this month by Infrastructure Victoria, states that modelling has shown that
up until 2066 there will be no problems handling the number of ships expected to pass through The Heads into Port Phillip. “If growth in ship numbers were to continue as forecast then the ultimate capacity constraint would not be reached until sometime in the mid2100s,” the discussion paper states. It cautions that if the largest container ships are to use Port Phillip, the Great Ship Channel will need to be widened from its present 245 metres to 425 metres; the entrance to Western Port would need “some realignment”. Infrastructure Victoria CEO Michel Masson said the body of evidence is the result of many months of technical investigations and engagement with stakeholders and local communities. “We have used existing studies, undertaken new technical investigations and consulted with key stakeholders and local communities over the past six months to develop this
evidence base on when we might need a new port, and where it should be located,” he said. “This is not our advice to the government, it is the information, data and analysis we have collected to date.” Westernport Peninsula Protection Council secretary Karri Giles said the amount of dredging needed for a container port at Hastings was “more than double Port Phillip Bay’s infamous channel deepening”. Western Port would be “permanently muddy”. “Infrastructure Victoria thinks the main reason to build a second container port is in case retailers want to bring in goods in the world’s second biggest ships. Most right thinking people here would rather the ships fit the port than build a whole new port to take bigger ships,” Ms Giles said. The discussion paper and technical reports are at yoursay.infrastructurevictoria.com.au/ports
Become a Mornington Racing Club Member today! Become a 2016/17 Mornington Member and get all of the next season free! What’s included: • Access to two seasons and over 75 race meetings at Mornington & Ladbrokes Park. That’s just $2.30 per race day for two people! • Members’ Reserve admission to 2017 Ladbrokes Mornington Cup Day and the 2017 Peninsula Cup Day • Two (2) members’ reserve passes and one (1) members’ car park pass for all race meetings at Mornington and Ladbrokes Park • Complimentary drinks, racebooks, guest passes and more
PAGE 6
Chelsea Mordialloc Mentone News 22 March 2017
Limited Memberships Available! PLUS all young members under 41 will be receive a special invitation to the Young Members’ Reserve within the all-inclusive Garden Bar on Ladbrokes Mornington Cup Day for just $99 (valued at over $160)
Enjoy two seasons for only $175 (Valued at $320)
JOIN TODAY AT MRCMEMBERSHIP.COM.AU OR CALL 03 5975 3310