2
Mercy Care (medical office)- Under Construction
3
Trackside Development (office), MARTA Lot 1- Under Design/Permitting
10-year Update for the Chamblee Town Center Livable Centers Initiative, 2014
4
The Olmsted (mixed use)- Under Construction
•
A City on the Right Track, City of Chamblee Comprehensive Plan, 2015
5
Chamblee Atlanta (mixed use)- Under Design/ Permitting
•
City of Chamblee Unified Development Ordinance, 2015
6
•
Unified Development Ordinance (UDO) Addendum 3.0 Streetscape, 2015
The Malone on Peachtree (mixed use) - Under Design/ Permitting
7
DeKalb County Senior Community Center (government) -Under Construction
8
Parkside Chamblee (office)- Under Design/Permitting
9
Chamblee Residence Townpark (residential) - Under Permitting
R
•
Easement at Peachtree Malone Lofts Documentation
•
Metropolitan Atlanta Rapid Transit Authority (MARTA) Stormwater Management As-Built Report, 215/15
•
Traffic Impact Study for Chamblee Gateway South, 2014
D
•
Properties along the corridor are in various stages of development or redevelopment, including planning, design, permitting, and construction. The Design Team obtained plans of all these properties and incorporated the plans into a study area base map. Figure 1.4a illustrates the locations these projects in relation to the Rail-Trail and the MARTA stormwater detention pond facility. These projects include:
16
Peachtree Station Shopping Center -Whole Foods (retail)- Under Construction
AF
The Chamblee Rail-Trail Extension Conceptual Design Study (Design Study) builds off of a number of previous planning efforts. To provide a foundation for completing the Design Study, the following documents were reviewed:
1
T
1.0 | Existing Conditions + Analysis
1.4 Review of Existing Plans and Studies
DRAFT City of Chamblee Rail-Trail Extension Conceptual Design Study
10 Parkview on Peachtree (mixed use)- Under
Construction
The following is an overview of findings that relate to the RailTrail study, as determined from review of the existing plans and studies.