Materials and Assembly 1

Page 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

CONSTRUCTION MATERIAL KEY: 1. EPDM ROOFING 2. STEEL BAR JOIST 3. HIGH LOAD RIGID INSULATION 4. CORRUGATED METAL DECKING 5. RIGID INSULATION 6. COLD ROLLED METAL FRAMING 7. STAINLESS FLASHING 8. CEMENT PANEL 9. SLOPED SITE CAST SILL 10. BRISE SOLEIL UNIT 11. 3/8” TK. STEEL PLATE, WELDED 12. STEEL PRIMARY COLUMN 13. DRYWALL 14. TREATED WOOD BLOCKING 15. CEMENT BOARD 16. COLD ROLLED METAL FRAMING 17. KAWNEER WINDO 451T 18. KAWNEER 451T MULLION 19. CEMENT BOARD 20. CEMENT BOARD 21. RIGID INSULATION 22. COLD ROLLED METAL FRAMING 23. #6 REINFORCING BAR 24. CEMENT BOARD 25. CEMENT BOARD 26. CORRUGATED METAL DECKING 27. VAPOR BARRIER 28. RIGID INSULATION 29. TYPE X GYPSUM BOARD 30. RIGID INSULATION 31. 18“ WIDE CONCRETE PIER 32. 10” TK CAST IN PLACE CONCRETE 33. GRAVEL 34. CONCRETE 35. GRAVEL 36. GRAVEL BACKFILL 37. PVC DRAIN SHIELD 38. FOUNDATION DRAIN W/ GEO TEXTILE 39. EARTH 40. POLISHED CONCRETE SLAB 41. COMPACTED GRAVEL FILL. 42. WELDED WIRE MESH 43. CORRUGATED METAL DECKING 44. MAIN STEEL BEAM 45. CONCRETE SLAB 46. TYPE X GYPSUM BOARD 47. WIRE MESH 48. SILL SEAL 49. VAPOR BARRIER 50. COLD ROLLED METAL FRAMING 51. 1/2” DIA ANCHOR BOLTS 52. REINFORCED CONCRETE FOOTING 52. #6 REINFORCING BAR

ASSEMBLY

SEQUENCE

40 41 42 43 44 45

ASSIGNMENT 1

46 47 48 49 50

48-215 MATERIALS & ASSEMBLY SPRING 2018 INSTRUCTOR: DAMIANI

51 52 53

CHRISTOPH ECKRICH


CONSTRUCTION MATERIAL KEY:

1 2

1. STEEL PRIMARY COLUMN 2. 1/2” DIAMETER STEEL BOLTS 3. STEEL PRIMARY BEAM 4. STEEL SECONDARY BEAM 5. STEEL PRIMARY COLUMN

3 4 5

ASSEMBLY

SEQUENCE

ASSIGNMENT 1 48-215 MATERIALS & ASSEMBLY SPRING 2018 INSTRUCTOR: DAMIANI CHRISTOPH ECKRICH


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.