CE2.12
To improve the quality delivery, I tried to be creative by following the company IMS Policy when I was working with subcontractors’ also followed the Quality & HSE to ensure the quality was maintained. On the design work, I made the decision to use three different compaction test methods to improve the reliability of the results and reduce the chances of the errors that are associated with soil compaction test. I also did the test on the rolling basis to ensure we deliver results on time without any delay.
CE2.13
I leveraged on latest technology during the execution of this project regarding tools that I was using. For example, I used GEOSYSTEM programs software that helped me in plotting boring log, and the test pit logs that helped me in reducing the time taken in reporting test results for the geotechnical test. The software also helped me in the analysis of the cement products and concrete test results. This program supported the AASHTO, ASTM, and ACI standards.
CE2.14
I was a member of a team during the implementation of the roads construction works, and I was appointed the team leader when we were doing the road compaction test. As the team leader, I helped in guiding the technicians on how the test was performed. As the team leader, I maintained the flow of communication and gave the feedback to the management who lead the road construction works. We also worked together with subcontractors who were suppliers of the raw materials where we regularly discussed on the delivery lead times.
CE2.15
As the team leader in the compaction soil test, I was tasked with the production of different types of reports that I share with the client and the company head office. These reports were important because it determined the compaction required which is normally associated with the cost. The other documents that I prepared with my team included the analysis reports, weekly progress report among others. The language that I used on this documents was English since that was the official communication language at the site.
CE2.16
I made the economical decision during the implementation of this project because I always interacted with the suppliers of the soil compaction equipment. I always when for the most affordable but reliable option regarding hardware and test. Besides, as the team leader, I negotiated the project manager to allow my time work extra few hours to cover lost time. This reduced the overall cost of the project since it was billed as per the number of days spent at the site. -------------------Reach us to get your cdr report to be done at CDRAustralia.org------------------