October 16, 2013 board packet

Page 6

Findings 1. New direct connections or replacement of existing connections are not proposed. 2. Prohibited discharges are not proposed. RECOMMENDATION: Approve with 4 Conditions Conditions: 1. Receipt of $4,650 surety and maintenance agreement. 2. Provide a copy of the NPDES permit. 3. Increase filtration volume to provide at least 3,949 cf of storage between the outlet invert elevation and the top of the sand. Currently, 1,993 cf is provided between elevation 926.3 and 925.56. 4. Clarify placement of the 4” draintile. Detail B on sheet C8-02 states the 4” draintile shall be on the sides and outlet, but sheet C5-01 indicates it is a 6” draintile.

W:\07 Programs\Permitting\2013\13-026 Associated Bank\13-026 PermitReport2 (3).doc

Page 4 of 4


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.