FINAL REPORT
10 YEAR MAINTENANCE, REPAIR, AND IMPROVEMENT PLAN FOR THE TROUT BROOK STORM SEWER INTERCEPTOR
Capitol Region Watershed District June 22, 2009 Project No. 13017.002
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 1
SAINT PAUL, MINNESOTA JUNE 22, 2009
FINAL REPORT 10 YEAR MAINTENANCE, REPAIR, AND IMPROVEMENT PLAN FOR THE TROUT BROOK STORM SEWER INTERCEPTOR 2009 - 2018 CAPITOL REGION WATERSHED DISTRICT PROJECT NO. 13017.002
I hereby certify that this Report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.
Ronald S. Quanbeck License No. 19396
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 2
10 YEAR MAINTENANCE, REPAIR, AND IMPROVEMENT PLAN FOR THE TROUT BROOK STORM SEWER INTERCEPTOR 2009 - 2018 CAPITOL REGION WATERSHED DISTRICT PROJECT NO. 13017.002 TABLE OF CONTENTS PAGE NO. I. PURPOSE................................................................................................................................................. 1 II. BACKGROUND ........................................................................................................................................ 2 III. SUMMARY OF RECOMMENDED ACTION ITEMS................................................................................ 5 IV. CAPITAL PROJECTS.............................................................................................................................. 8 V. OPERATIONS ACTIVITIES.................................................................................................................... 11 VI. ADDITIONAL ACTION ITEMS TO CONSIDER .................................................................................... 13
FIGURES 1. TROUT BROOK STORM SEWER INTERCEPTOR MAP....................................................................... 3
TABLES 1. CAPITAL IMPROVEMENT PROJECTS .................................................................................................. 6 2. OPERATIONS ACTIVITIES ..................................................................................................................... 7
APPENDICIES
1. TUNNEL CONDITION REPORT SUMMARY 2. COST SUMMARY
REFERENCES
1. 10 Year Maintenance, Capital Repair, and Improvement Plan for the Trout Brook (TBI) Storm Sewer Interceptor, dated May 6, 2003, prepared by TKDA 2. Trout Brook Storm Tunnel System Inspection and Assessment Report, dated September 27, 2007, prepared by CNA Consulting Engineers 3. Review of Trout Brook Storm Sewer Interceptor between Maryland and Interstate-35E, dated June 20, 2007, prepared by Barr Engineering Company
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 3
10 YEAR MAINTENANCE, REPAIR, AND IMPROVEMENT PLAN FOR THE TROUT BROOK STORM SEWER INTERCEPTOR 2009 - 2018 CAPITOL REGION WATERSHED DISTRICT I.
PURPOSE The Capitol Region Watershed District (CRWD) commissioned TKDA to prepare a 10 year Maintenance, Repair, and Improvement Plan (CIP) for the Trout Brook Storm Sewer Interceptor (TBI) in 2003 in anticipation of assuming ownership of TBI from the Metropolitan Council Environmental Services (TKDA, 2003). The TBI system was transferred to CRWD in 2006, and this CIP serves as an update to the 2003 CIP, which incorporates completed repair work and identifies ongoing operational activities. The purpose of this CIP is to serve as an asset management plan and guide to implementing the action items necessary to improve and maintain the TBI System at a level of “Good Operating Condition.” As part of the reconveyance of the TBI system in 2006, a legal definition of “Good Operating Condition” was determined and promulgated in MN Statute 473.5111. Moving forward on the management of the TBI system, CRWD has defined “Good Operating Condition” as follows: “In order for any section of the sewer system to be considered in ‘good operating condition,’ it shall (1) have foundation soil or pile foundations structurally adequate to carry the loads imposed on it, (2) be free from damage, such as that allowing corrosion of reinforcing steel and mortar loss between bricks or blocks, that may lead to further deterioration that could be considered to threaten the structural integrity of the pipe, and (3) be free from defects, such as offsets or sags, that significantly reduce the flow capacity of the pipe and defects, such as holes and cracks, that permit significant exfiltration of stormwater or infiltration of groundwater.”
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 4
II.
BACKGROUND The TBI was constructed as a combined sanitary sewer and storm sewer system from the late 1800’s to early 1900’s. The combined sewer system was separated in the 1980’s. After completion of sewer separation projects, Metropolitan Council Environmental Services (MCES) transferred ownership of the TBI to CRWD. In 2007, Charles R. Nelson & Associates, Inc. (CNA) was retained to visually inspect the TBI for defects (i.e., cracks, holes, infiltration, sags, etc.), compare the inspection findings to past inspections, and determine the existing structural condition of the TBI (CNA, 2007). The visual inspection of TBI by CNA was the third since 1995, and the first performed on behalf of CRWD. The previous inspections were performed prior to the TBI transfer from MCES to CRWD. The reaches of the TBI inspected are shown on Figure 1.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 5
Project 12 Sta. 136+16-168+73 Date: 2010
DALE ST N
VICTORIA ST N
Project 14 Sta. 0+00-17+62 Date: 2010
INTER STATE 35E
LARPENTEUR AVE W
INTER STATE 35E
WEST EXTENSION
MAPLEWOOD DR
LARPENTEU R AVE E
Project 11 Sta. 112+78-136+16 Date: 2012
HIGHWAY 61
S
Maplewood DR
LVD
JACKSON ST N
Roseville
MC CAR RO NS B
ROSELAWN AVE E
PA RK W AY
ROSELAWN AVE W
ROSELAWN AVE W
EDGERTON ST
N
EDGERTON ST N
INTERSTATE 35E
MCCARRONS BLVD N
ST ORIA VICT
EAST EXTENSION
ARLINGTON AVE W
Project 5 (Complete) Sta. 96+20-112+77 JACKSON ST
Project 4 (Completed) Sta. 59+45-88+00
Project 13 Sta. 185+82-186+94 Date: 2010 FRONT AVE
CO M
O
Project 9 Sta. 32+33-33+34 Date: 2011
Saint Paul
SYCAMORE ST W
Project 6 Sta. 0+00-19+93 Date: 2011
MINNEHAHA AVE W
6TH ST E
PARK ST
BEGIN INSPECTION
UNIVERSITY AVE W
SAINT A NTHONY AVE
Project 3 Sta. 23+00-23+15 Date: 2009
E ST
12TH S TW
3
5 ST AT E TE R IN
W
DR PAR SHE
ST
D AR EP SH
D
RD
TE R
D 3R
ST AT E
ST
E
INTERSTATE 94
94
E
WA RN ER
2
D AVE GRAN
E ST
VD BL
Y5 WA IGH 2H
5TH ST
CH ES TN UT
ST H 5T
N
E
ST
ST
H 7T
W
L KE
GG LO
IN
5 AY HW HIG
W
T T LS AL AS W UT CO ST WA
W ST
Y LE
H
RT BE RO
SELBY AVE
T 10
ST R DA ST CE R N TE ST PE HA T IN AS SA
MARSHALL AVE
BL VD
B WA
LO GG
B SI
KE L
E
CONCORDIA AVE
SUMMIT AVE
H 7T
9T H
INTERSTATE 94
Project 7 Sta. 23+15-28+49 Date: 2011
RICE ST
INTERSTATE 94
MARION ST
WESTERN AVE N
VICTORIA ST N
THOMAS AVE
UNIVERSITY AVE W
CASE AVE
Project 8 Sta. 28+49-32+33 Date: 2011
Project 10 Sta. 33+62-59+45 Date: 2012
AV E
MARYLAND AVE E
FIL L
MO RE AV E
RD
MO UN DS BLV D WA RN ER RD
E
Figure 1 Trout Brook Storm Sewer Interceptor 10 Year Maintenance, Repair And Improvement Plan
LEGEND
Date: June 2009
Feasibility Repair and Monitor Replace/Rehabilitate 0
500 1,000
2,000
3,000
FOREST ST
Activity 7
Project 2 (Completed) Sta. 88+00-96+19 INTERSTATE 35E
Project 1 (Completed) Sta. 169+50-172+00
ARCADE ST
END INSPECTION
4,000 Feet
Televise General Maintenance Capitol Region Watershed Dist. Boundary K:\gis\CRWD\CIP\crwd-cip11x17-072009.mxd
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 6
The information gathered in the 2007 inspection was used in preparing the recommended activities, as well as information from the Review of Trout Brook Storm Sewer Interceptor between Maryland Avenue and Interstate 35E (Barr Engineering, 2007). In summary, the inspection found that the overall condition of the majority of the TBI system inspected was in good to fair condition for almost its entire length and has remained relatively the same from previous inspections. The most significant changes are: 1.
The section near Willow Reserve Storm Water Pond, Station 168+73 to 171+13, identified as poor condition in previous inspections was replaced and is now rated good.
2.
Under L’Orient Street Bridge and Maryland Avenue, TBI was downgraded from poor to urgent (Station 88+20 to 95+10). The major defects in this section were severe longitudinal fractures and settlement of TBI of one to three feet. Settlement caused circumferential fractures and joints to open from one to five inches. The structural inadequacy of this section was severe enough to require immediate corrective action in 2008/2009. This section is now rated good.
3.
The segment downstream from Maryland Avenue across Interstate 35E (Station 60+80 to 88+20) was downgraded from fair condition to poor condition. Longitudinal cracks were observed that were not identified during previous inspections indicating that the condition has deteriorated. This segment was repaired in conjunction with Station 88+20 to 95+10.
4.
A large junction chamber along the railroad tracks (Station 23+00 to 23+15) has a metal grill and wood top. It cannot be closely inspected from inside the pipe, but is identified as a concern that should be investigated further.
5.
Significant invert erosion was identified from Station 185+82 to 186+94. This segment was downgraded from fair to poor condition.
As identified in earlier reports and again confirmed, the most critical need identified after the replacement of Willow Reserve segment was the segment under L’Orient Street and Maryland Avenue, Station 88+20 to 95+10. In addition, a number of areas of the tunnel not identified above need less extensive work to prevent them from deteriorating further.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 7
While this document is referred to as a CIP it contains not only capital, but also operational activities. Recently completed CRWD projects and activities are also described. III.
SUMMARY OF RECOMMENDED ACTION ITEMS TKDA’s recommended prioritized action items and budgeted costs to maintain and improve the defined limits of the TBI System to a level of “Good Operating Condition” are summarized in Table 1 and Table 2 and described in the following sections.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 8
PROJECT NO. 13017.002
TABLE 1
June 22, 2009
CAPITOL REGION WATERSHED DISTRICT 10 YEAR MAINTENANCE, REPAIR, AND IMPROVEMENT PLAN FOR THE TROUT BROOK STORM SEWER INTERCEPTOR
CAPITAL IMPROVEMENT PROJECTS 2009
Prior Years
2010
2011
2012
2013
2014
2015
2016
2017
2018
Past and Future Projects 1
Replacement Work Sta. 169+50 - 172+00 (Completed 2007)
$
1,400,000
2
Replacement Work Sta. 88+00 - 96+19 (Note 2)
$
375,000
3
Feasibility Study Sta. 23+00 - 23+15
$
4
Repair Work Sta. 59+45 - 88+00 (Note 3)
5 6
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$ 2,520,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
-
$
50,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
Repair Work Sta. 96+20 - 112+77 (Note 4)
$
-
$
50,000
$
-
Repair Work Sta. 0 - 19+93
$
-
7
Repair Work Sta. 23+15 - 28+49
$
-
$
8
Repair Work Sta. 28+49 - 32+33
$
-
9
Repair Work Sta. 32+33 - 33+34
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
81,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
-
$
22,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
16,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
4,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
Page 6
10 Repair Work Sta. 33+62 - 59+45
$
-
$
-
$
-
$
105,000
$
-
$
-
$
-
$
-
$
-
$
-
11 Repair Work Sta. 112+76 - 136+16
$
-
$
-
$
-
$
95,000
$
-
$
-
$
-
$
-
$
-
$
-
12 Repair Work Sta. 136+16 - 168+73
$
-
$
-
$
132,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
13 Repair Invert Sta. 185+82 - 186+94
$
-
$
-
$
40,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
14 Repair Work (West Tunnel) Sta. 0+00 - 17+62
$
-
$
-
$
70,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
15 Tunnel Maintenance Project (Note 5)
$
-
$
-
$
-
$
-
$
-
$
150,000
$
-
$
-
$
-
$
-
$
150,000
16 Tunnel Major Repair Fund
$
-
$
-
$
-
$
300,000
$
300,000
$
300,000
$ 300,000
$
300,000
$
300,000
$
300,000
$
300,000
TOTALS $
1,775,000
$ 2,620,000
$
242,000
$
423,000
$
500,000
$
450,000
$ 300,000
$
300,000
$
300,000
$
300,000
$
450,000
NOTES: 1. MCES agreed to pay $4,200,000 for Projects Number 1 and 2. 2. Actual (2008) and Expected (2009) costs for the project to be completed in 2009. 3. Concrete repair costs included in Project No. 2 costs. 4. These repairs were conducted after the completion of Project No. 2 by the same contractor. 5. Estimated repairs based on TBI inspection in 2012. 6. 4% Yearly Inflationary Costs have been added to projects beginning after 2009. 7. Total Cost for each Repair and Reconstruction Project includes a 30% Factor for Contingencies and a 20% Factor for Engineering. 8. Colored table figures correspond to colored areas indicated on Figure #1, 10 Year Maintenance, Repair and Improvement Plan.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 9
PROJECT NO. 13017.002 June 22, 2009
TABLE 2 CAPITOL REGION WATERSHED DISTRICT 10 YEAR MAINTENANCE, REPAIR, AND IMPROVEMENT PLAN FOR THE TROUT BROOK STORM SEWER INTERCEPTOR
OPERATIONS ACTIVITIES 2009
Prior Years
2010
2011
2012
2013
2014
2015
2016
2017
2018
Past and Future Activities 1
Manhole Location Survey and GIS Mapping
$
15,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
2
Easement Verification Work
3
Expand Hydraulic Model to Trout Brook Outfall (Completed 2005)
$
5,000
$
-
$
25,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
30,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
4
Purchase and Install Flow Meters (Note 1)
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
5
Collect Flow Meter Data (Note 1)
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
6
TBI Inspection/Monitoring Program
$
66,000
$
-
$
3,900
$
4,100
$
84,600
$
4,400
$
4,600
$
4,800
$
5,000
$
102,000
$
5,400
7
Video Inspection Dale Street to Como Lake
$
-
$
6,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
8
Hydraulic Modeling of the TBI
$
-
$
35,000
$
50,000
$
50,000
$
-
$
-
$
-
$
-
$
-
$
-
$
-
9
Minor Maintenance (Note 3)
$
-
$
15,000
$
15,000
$
15,000
$
15,000
$
16,000
$
16,000
$
16,000
$
18,000
$
18,000
$
18,000
TOTALS $
116,000
$
56,000
$
93,900
$
69,100
$
99,600
$
20,400
$
20,600
$
20,800
$
23,000
$
120,000
$
23,400
Page 7
NOTES: 1. See CRWD Monitoring Program for cost information 2. 4% Yearly Inflationary Costs have been added to activities beginning after 2009. 3. Minor maintenance work is defined as misc. small repairs and cleaning.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 10
IV.
CAPITAL PROJECTS Project No. 1: Replacement Work Station 169+50 to 172+00 (Completed) A 3.5 foot sag in TBI located in the railroad right-of-way just north of the Willow Reserve Pond was repaired during the winter of 2006/2007. Two hundred forty feet of the TBI along the north side of the railroad track was removed and replaced with an 8-foot diameter reinforced concrete pipe placed on a piling system. Project No. 2: Replacement and Repair Work Station 88+00 to 96+19 (Completed) The TBI section under Maryland Avenue and L’Orient Street is in urgent condition and in need of significant repair. In 2008, CRWD completed the Feasibility Study, including geotechnical analysis of the repair area, and designed the repairs. By late November 2008, construction commenced on replacing a 200-foot section of TBI under L’Orient Street Bridge and stabilizing the foundation of 260 feet of TBI under Maryland Avenue. The replacement and repair work was completed in late spring 2009, which brought this section of TBI to “Good Operating Condition”. Project No. 3: Feasibility Study Station 23+00 to 23+15 (Future) A large junction chamber under the BNSF Rail Yard located southeast of Interstate 35E is covered by a buried metal grate and wood timbers. This cover cannot be adequately inspected from inside the TBI and there is concern that it may have deteriorated and needs replacement. This project provides for excavating the top portion of the chamber to allow detailed structural inspection and a determination if replacement of the cover is warranted at this time. In addition, the information necessary to design the replacement will be gathered, feasible options will be identified if replacement is necessary, and costs of the work will be estimated.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 11
Project No. 4: Repair Work Station 59+45 to 88+00 (Completed) The 2007 tunnel inspection downgraded the section of the TBI downstream from Maryland Avenue to across Interstate 35E from fair condition to poor condition. Longitudinal cracks were observed that were not identified in the previous reports indicating that the condition has deteriorated. CNA provided a broad range of potential actions, from repair and monitoring to complete replacement with an associated broad range in cost. In 2008, CRWD elected to conduct concrete repairs instead of fully replacing this section. This work was conducted in conjunction with Project No. 2. Project No. 5: Repair Work Station 96+20 to 112+77 (Completed) Although this 1,650-foot section of tunnel was rated in fair condition in 2007, CRWD identified significant inlet connection defects and longitudinal cracks in an inspection in 2009; therefore, CRWD chose to conduct concrete repairs in this tunnel section in February 2009 as part of Project No. 2. Project No. 6 through 12: (See Table 1) (Future) CNA quantified additional repairs to the other segments of the tunnel which were not addressed above. The repairs include sealing cracks and joints, patching inverts, replacing manhole steps and patching pipe penetrations. The repairs will reduce groundwater infiltration and the risk of pipe foundation or structural integrity problems from developing in the future. These repair projects have been scheduled over the next three years beginning in 2010 and completed in 2012. The purpose of this three year time line is primarily for budgetary and project manageability reasons. The goal of these projects is to repair the deficiencies identified by “CNA’s 2007 Inspection Report and Field Notes” and maintain the TBI in “Good Operating Condition.” Note that the future findings of the TBI Inspection and Monitoring Program will be used to re-evaluate, and if necessary, revise the current planned repairs for Projects 6 through 12. See Table No. 1 for the Estimated Cost Summaries for these Projects.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 12
Project No. 13: Repair Invert Station 185+82 to 186+94 (Future) The 2007 tunnel inspection downgraded this segment of the TBI from fair to poor due to significant invert erosion. This project will patch the invert which has eroded to a depth of several inches in some locations to prevent further deterioration. Project No. 13 is a higher priority than Projects 6 through 12. Project No. 14: Repair Work - West Extension Station 0+00+ to 17+62 (Future) This 8-foot diameter section of the TBI has many open, leaking joints. The goal of this project is to properly seal leaking joints to eliminate groundwater infiltration and reduce the risk of a pipe foundation or an integrity problem such as a sagged pipe condition from occurring in the future. Project No. 15: Tunnel Maintenance Project (Future) Future TBI inspections with one slated for 2012, will likely identify minor repairs needed throughout the TBI (See Activity No. 6 below). The extent and therefore the cost, will not be determined until the 2012 inspection is complete, but an estimated amount has been included in the CIP for planning purposes. Project No. 16: Tunnel Major Repair Fund (Future) CRWD will begin accumulating funds for future major repairs. Construction of portions of the TBI began in 1888. As the system ages, various repairs will be required and replacement of sections of the TBI is very expensive. A fund accumulated over time is a tool to help limit the sudden funding spike of a large unforeseen repair project, such as stabilizing the segment downstream from Maryland Avenue if it continues to deteriorate. Guidelines for the fund such as capping it if it reaches a certain level or what it can be used for will need to be established.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 13
V.
OPERATIONS ACTIVITIES Activity No. 1: Manhole Location Survey and GIS Mapping (Completed) In 2004, all the TBI manholes were located and mapped for inclusion in a GIS database. Existing base mapping information was collected from the City of Saint Paul and MCES. During the manhole field survey digital pictures were collected for future use. Activity No. 2: Easement Verification Work (Completed and Future) CRWD and Ramsey County staff verified easement rights needed for operation and maintenance of the TBI. Easement verification work was completed in 2004. Numerous discrepancies were discovered during the easement verification work that will need to be resolved. Activity No. 3: Expand Hydraulic Model to Trout Brook Outfall (Completed) An existing XP-SWMM model of the upper watershed was expanded to include the TBI to the system outlet at the Mississippi River. In addition, major detention facilities connected to the TBI were added. Approximately 56% of the TBI watershed was included in the original XP-SWMM model. The Model serves as a tool for managing the future repairs, replacements, and modifications to the TBI. Expansion of the XP-SWMM model was completed in 2005. Activity No. 4 and No. 5: Purchase and Install Flow Meters and Collect Flow Meter Data (Ongoing) Since 2005, CRWD has been collecting flow data at three locations in the TBI system as part of the CRWD Monitoring Program. The flow data helps better understand the hydraulics of TBI and assist in the management of the system. These activities are an integral part of the CRWD Monitoring Program and are expected to be an ongoing effort. Costs are included in the CRWD Monitoring Program and therefore not included here. The activities are identified here to highlight their importance for managing the TBI system.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 14
Activity No. 6: TBI Inspection/Monitoring Program (Future, Ongoing) The TBI Inspection/Monitoring Program monitors the condition of the TBI to proactively identify and address problems. The TBI will be thoroughly inspected every five years and the CIP updated to reflect the results of that inspection. The invert erosion at Station 186+00 discussed in Project No. 13 will also be checked annually. Activity No. 7: Video Inspection - Dale Street to Como Lake (Future) A video inspection of the Maryland Avenue storm sewer line between Dale Street and Como Lake will be performed. This segment of storm sewer line has a sanitary sewer pipe encased in concrete inside the storm sewer. The line is not large enough for personnel to access and was not inspected by CNA. The condition of the storm sewer pipe will be reviewed and deficiencies noted. The video inspection will provide information necessary to identify any repairs needed to maintain the line in “Good Operating Condition”. Activity No. 8: Hydraulic Modeling of the TBI (Future) CRWD’s existing XP-SWMM hydrologic and hydraulic model will be updated and calibrated using data gathered by CRWD’s flow monitoring program. The existing model will be reviewed and modified, as appropriate, to reflect current conditions. Measured flow and rainfall data will then be used to adjust model parameters to more accurately reflect the characteristics of the TBI system. The XP-SWMM model provides a valuable tool for managing the TBI system and watershed. Activity No. 9: General (Minor) Maintenance of TBI (Ongoing) Continued maintenance efforts will be part of the ongoing work to sustain the integrity of TBI. This work will include replacing manhole lids and frames, clearing inlets and trash racks, removing debris and sediment from the line, and other general maintenance practices that will be required when periodic inspections deem them necessary.
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 15
VI.
ADDITIONAL ACTION ITEMS TO CONSIDER This CIP serves as an asset management plan and guide for implementing the action items necessary to improve and maintain the TBI System at a level of “Good Operating Condition�. In addition to this document, TKDA suggests that CRWD consider purchasing and developing an Asset Management Database for the TBI System using an approved computer software package. Benefits of developing an Asset Management Database include: A.
It will serve as a one-stop working record to effectively store and view previous and future sewer inspections, repairs, and replacements. Photographs, record drawings, sketches, documents, and inspection information can be entered into the database (station by station). Most Asset Management software packages use GIS platforms such as ArcView to view the TBI System and select specific sections of the system to enter or view data. Most software packages can print off NPDES reports if required.
B.
Most software packages can print off GASB 34 forms, documenting the replacement costs of the infrastructure/asset and its depreciation over time.
Such an investment will show a greater return to CRWD and its administrative staff if CRWD has or will be acquiring other infrastructure assets that require maintenance or capital improvements. If requested by CRWD, TKDA is available to provide additional information regarding Asset Management Databases and computer software packages.
Page 13 CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 16
Project 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 3 3 3 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
Start 0+00 0+00 0+00 0+00 0+00 0+00 0+27 2+13 3+42 4+04 4+13 4+30 5+38 7+41 9+80 10+48 10+58 10+58 10+88 10+88 10+88 14+10 15+30 16+30 16+30 16+32 18+00 18+00 18+40 18+60 18+60 18+70 18+89 18+90 18+91 19+93 19+93 19+93 19+93 20+00 23+00 23+03 23+14 23+44 23+50 23+50 23+77 23+79 24+64 26+22 26+22 28+10 28+48 28+48 28+49 28+63 29+06 29+50 30+65
End 9+80 4+30 1+10 1+45 4+30 0+30
4+25 9+80 5+40 10+48 19+93
19+93 19+93
18+02 18+02 18+80
18+80
23+14 23+00 23+00 23+14 26+22
28+49 32+18 28+43 32+18 32+18 32+18
29+80
Description Miscellaneous Survey Start Miscellaneous Dimension/Diam/Shape Change Brickwork Missing Mortar Infiltration Weeper Infiltration Weeper Lining Failure Buckled Point Repair Patch Repair Pipe Failure Hole Point Repair Patch Repair Access Point Manhole Point Repair Patch Repair Miscellaneous Lining Change Point Repair Patch Repair Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Miscellaneous General Observation Miscellaneous General Observation Access Point Manhole Miscellaneous General Observation Miscellaneous General Observation Tap Break-In/Hammer Infiltration Runner Brickwork Missing Pipe Failure Hole Pipe Failure Hole Brickwork Missing Infiltration Runner Brickwork Missing Mortar Obstacles/Obstructions Built Into Structure Point Repair Patch Repair Brickwork Missing Mortar Access Point Manhole Point Repair Patch Repair Pipe Failure Broken Miscellaneous Lining Change Miscellaneous General Observation Surface Damage Aggregate Visible Surface Damage Reinforcement Visible Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Tap Break-In/Hammer Miscellaneous Lining Change Access Point Other Special Chamber Brickwork Missing Mortar Joint Separated Access Point Manhole Joint Separated Joint Separated Miscellaneous Dimension/Diam/Shape Change Miscellaneous General Observation Point Repair Patch Repair Surface Damage Aggregate Visible Surface Damage Reinforcement Visible Miscellaneous Lining Change Pipe Failure Hole Access Point Manhole Infiltration Weeper Tap Break-In/Hammer
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H
W
10
10
Brickwork Missing Mortar Slight
2
Access Point Manhole Steps Missing/Broken/Corroded
6
Access Point Manhole Steps Missing/Broken/Corroded Miscellaneous Dimension/Diam/Shape Change Chamber
4
Access Point Manhole Steps Corroded
4
Tap Break-In/Hammer Defective
4
1
1.5 1
10
10
0.5
0.5 0.66
Brickwork Missing Mortar Large Brickwork Missing Mortar Large Point Repair Patch Repair Defective Brickwork Missing Mortar Large
0.10 3
10.5
Surface Damage Reinforcement Visible Corroded Access Point Manhole Steps Corroded Miscellaneous Dimension/Diam/Shape Change Chamber Tap Break-In/Hammer Defective
3 10
4 10 1 10
10 4
Brickwork Missing Mortar Large 0.100 1 0.100 0.100
2 Access Point Manhole Steps Corroded Tap Break-In/Hammer Capped
3 1.25
L
At To Remarks 915am 72 sunny 10' x 10', cobblestone invert, SS block wall, limestone block arch 5 7 4 5 infiltration at mortar joints 7 9 at joints 5 7 invert uneven / buckling 3 9 standard brick 1.5 6 cobblestone pavers missing 9 granite block 2 steel steps deteriorating 12 12 transition from sandstone to limestone block walls 7 9 2 rusted broken rungs CIP crossover chamber 10' x 10', cobblestone invert, SS block wall, limestone block arch 4 5 angle iron - stop logs for dam 7 8 angle iron - stop logs for dam 11 2 4 remains of inflatable dam 8 10 remains of inflatable dam 9 patching required around 4' RCP 9 running through multiple joints 5 7 random pavers missing 1 6 paver missing 3 hole at connection 7 8 7 8 2 11 1 DIP 11 1 around DIP 9 10 9 9 3 epoxy placed randomly in joints 4 12 abandoned drain CIP arch 20' form length, invert & arch cast seperately 5 7 5 7 10 14 11 1 grated steel roof covered with wood 10 at connection stone arch, concrete invert 3 steel grate, daylight 7 5 7 5 1 12 7 5 7 5 stone arch, brick invert 5 7 random pavers missing 12 5 7 5 10 2 CIP concrete arch, brick invert, walls 4' 1 7 8 1 steps corroded 3 3
Appendix G - 17
Project 8 8 8 8 8 8 8 8 8 8 8 8 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
Start 31+74 32+00 32+18 32+18 32+18 32+33 32+66 32+68 33+34 33+34 33+48 33+52 33+61 33+64 35+86 36+48 36+50 36+50 39+15 39+21 39+28 39+33 39+70 42+57 42+73 42+76 42+76 43+55 43+99 44+00 44+07 44+20 44+28 44+30 46+80 47+07 47+07 47+07 47+36 47+39 47+41 47+45 47+45 48+57 48+90 50+16 50+51 50+78 52+13 52+29 53+34 55+50 56+75 57+50 58+28 59+08 59+25 59+35 59+45
End
32+33
33+34
42+57
36+70 42+57 39+22 39+70 39+32 41+00 42+76 44+00 68+61 44+02 44+28
59+45 46+83 59+55
59+55
Description Pipe Failure Hole Access Point Manhole Miscellaneous Lining Change Pipe Failure Broken Joint Separated Miscellaneous Dimension/Diam/Shape Change Miscellaneous General Observation Brickwork Missing Miscellaneous Dimension/Diam/Shape Change Surface Damage Aggregate Visible Pipe Failure Broken Tap Break-In/Hammer Joint Separated Access Point Manhole Access Point Manhole Pipe Failure Hole Lining Failure Buckled Surface Damage Reinforcement Visible Surface Damage Reinforcement Visible Fracture Longitudinal Access Point Manhole Fracture Circumferential Miscellaneous General Observation Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Pipe Failure Hole Point Repair Patch Repair Access Point Blind Shaft Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Access Wye Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Pipe Failure Hole Joint Separated Surface Damage Reinforcement Visible Surface Damage Reinforcement Visible Access Point Manhole Infiltration Weeper Tap Break-In/Hammer Fracture Circumferential Infiltration Gusher Pipe Failure Hole Fracture Circumferential Infiltration Runner Infiltration Weeper Point Repair Patch Repair Surface Damage Reinforcement Visible Access Point Manhole Fracture Circumferential Access Point Manhole Access Point Manhole Joint Separated Joint Separated Joint Separated Access Point Manhole Fracture Circumferential Miscellaneous Dimension/Diam/Shape Change
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier Access Point Manhole Steps Missing/Broken/Corroded
D 0.5 3.5
H
W 0.5
L 3
At To Remarks 5 2 steps rusted/broken block arch, concrete invert 9 10 9 10 transition 7 5 change in block to platteville 3 CIP horseshoe
1
0.25
1
1
0.021 4
6
7 9 9 11 11
Pipe Failure Broken Soil Visible
Pipe Failure Broken Soil Visible Tap Break-In/Hammer Active
1.25
Access Point Manhole Steps Missing/Broken/Corroded 3 0.5
3 5 10 10 9
0.25 Access Point Manhole Steps Missing/Broken/Corroded
Access Point Manhole Steps Missing/Broken/Corroded
3 0.25" width steps rusted/broken
3 0.021
4 9
4
11
2
5 3 11
3
3
7 2 2 3 multiple steps rusted/broken/grated cover 3 0.25" width, rebar exposed scrap steel - manhole rings and covers (5) transition steps rusted/broken CIPC box 7 holes in concrete - invert deteriorating 1
Miscellaneous Dimension/Diam/Shape Change Chamber 4 7 10.5 Access Point Manhole Steps Missing/Broken/Corroded
Access Point Manhole Steps Missing/Broken/Corroded Tap Break-In/Hammer Active
Point Repair Patch Repair Defective
Access Point Manhole Steps Missing/Broken/Corroded
chamber, wye to west no steps
11 9 9
2 3 6 0.042 7 8 9 3 9 3 2.83 4.5 8 0.031 12 5 0.5 2 2 6 0.010 7 7 3 1.25 1.25 2 10 3 11 0.010 12 4 11 3 1 0.083 12 0.042 12 0.042 12 3.5 1 0.010 7
10.5' x 9' CIPC box steps rusted/broken
3 3
5 .5" width 10 3 steps rusted/broken at connection span pipe 34" H x 54" wide 12 0.375" width
5 0.125" width at pipe 1 steps rusted/broken 12 0.125" width
12 1" width 12 0.5" width 12 0.5" width steps rusted/broken 5 0.125" width transition
Appendix G - 18
Project 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
Start End Description 59+55 68+61 Miscellaneous Dimension/Diam/Shape Change 59+68 Fracture Circumferential 60+46 Joint Separated 60+57 60+65 Access Point Other Special Chamber 60+63 Access Point Manhole 60+80 Joint Separated 61+92 Joint Offset 62+52 Obstacles/Obstructions Object Protruding Thru Wall 62+54 62+56 Pipe Failure Hole 62+55 Lining Failure Buckled 62+65 Joint Separated 62+65 68+61 Surface Damage Aggregate Visible 62+65 68+61 Surface Damage Reinforcement Visible 63+15 Joint Offset 63+15 Joint Separated 63+50 Fracture Angular 64+14 Fracture Circumferential Joint Offset 64+14 64+33 Joint Separated 64+94 Joint Separated 65+53 Joint Separated 65+93 Joint Separated 66+18 Access Point Manhole 66+44 Fracture Circumferential 67+01 67+05 Pipe Failure Hole 67+13 Fracture Circumferential 67+16 67+24 Pipe Failure Hole 68+27 Fracture Circumferential 68+41 88+20 Miscellaneous Dimension/Diam/Shape Change 68+41 68+98 Crack Longitudinal 68+41 Miscellaneous General Observation 68+41 112+69 Surface Damage Aggregate Visible 68+41 112+69 Surface Damage Reinforcement Visible 68+45 68+98 Crack Longitudinal 68+61 Miscellaneous Survey End 68+62 Joint Separated 68+80 69+32 Crack Longitudinal 68+98 69+38 Crack Angular 69+32 Joint Separated 69+34 Access Point Manhole 69+35 Joint Separated 69+85 Crack Circumferential 70+38 70+96 Crack Longitudinal 70+38 75+26 Crack Longitudinal 70+38 Joint Separated 70+96 Fracture Circumferential 71+00 71+07 Pipe Failure Hole 71+13 Crack Circumferential 71+53 Joint Separated 71+78 Fracture Circumferential 71+80 Crack Circumferential 71+80 Fracture Circumferential 71+99 Fracture Circumferential Fracture Circumferential 72+04 72+09 72+10 Crack Multiple 72+31 72+56 Fracture Longitudinal 72+45 Joint Separated 72+46 Access Point Manhole 72+46 Pipe Failure Broken
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H W 11.5 10.75 0.042 0.042 3
L
2 0.042 0.25 1
1 0.063
0.167 0.083 0.0104 0.042 0.042 0.0104 0.042 0.031 0.021 Access Point Manhole Steps Missing/Broken/Corroded
3 0.010 1 0.031 1 0.010 11.5 10.75
4
0.010
0.010 Access Point Manhole Steps Missing/Broken/Corroded
3 0.010 0.021
0.010 0.010 1 0.031 0.042 0.010 0.010 0.010 0.000 0.06 Access Point Manhole Steps Corroded
3
7
At To Remarks 11.5' x 10.75' CIPC horseshoe 12 12 0.5" width 9 5 0.5" width 11 drainage structure - vert. rebar 11 12 12 0.5" width 7 5 3" offset 5 piling through invert 7 5 7 invert buckling 7 5 0.75" width 10 2 10 2 7 5 2" offset 7 5 1" width 7 1 0.125" width 7 5 0.5" width 7 5 0.5" offset 7 5 0.125" width 7 5 0.5" width 7 5 0.375" width 7 5 0.25" width 10 steps rusted/broken 7 5 0.125" width 5 soil visible 12 12 0.375" width, 0.5" max 5 soil visible 12 12 0.125" width 11.5' x 10.75' CIPC horseshoe 11 5 7 holes in concrete - invert deteriorating 10 2 7 5 11 1:45pm rainy 7 5 0.125" width 1 11 8 7 5 0.125" width 10 steps rusted/broken/missing 7 5 0.125" width 7 5 0.25" width 1 11 7 5 0.125" width 7 5 0.125" width 7 7 5 7 5 0.375" width 7 5 0.5" width 7 5 7 5 0.125" width 7 5 0.125" width 7 5 0.125" width 7 5 9 0.005" width 7 5 0.75" width; open @ 7 & 5, tight @ 12 10 steps rusted 5 at connection
Appendix G - 19
APPENDIX 1 Project 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
Start 72+47 72+48 72+77 72+77 73+12 73+68 74+38 74+51 74+81 74+81 75+46 75+85 75+85 75+88 76+04 76+53 76+71 77+11 77+11 77+70 77+70 77+85 77+98 78+24 79+34 79+34 79+36 79+42 79+49 79+55 79+66 79+73 79+85 80+00 80+20 80+20 80+21 80+43 80+43 80+79 81+00 81+92 82+32 82+34 82+67 83+56 84+02 84+42 84+58 84+70 85+43 85+85 85+87 86+09 87+50 87+54 87+69 88+00 88+00
End Description 73+86 Fracture Longitudinal Fracture Circumferential Crack Circumferential Fracture Circumferential Fracture Circumferential Joint Separated Fracture Circumferential Crack Circumferential 75+26 Crack Longitudinal Joint Separated Fracture Circumferential 76+05 Crack Longitudinal Joint Separated Access Point Manhole Fracture Circumferential Fracture Circumferential Fracture Circumferential Joint Separated Miscellaneous Water Level Fracture Circumferential Miscellaneous General Observation Fracture Circumferential Fracture Circumferential Joint Separated 80+20 Crack Longitudinal Joint Separated Access Point Manhole Fracture Circumferential Fracture Circumferential Fracture Circumferential Fracture Circumferential Crack Circumferential Fracture Circumferential Fracture Circumferential 81+42 Crack Longitudinal 81+42 Crack Longitudinal Fracture Circumferential Fracture Circumferential Joint Separated Crack Circumferential 81+01 Pipe Failure Hole Fracture Circumferential Access Point Manhole 86+34 Fracture Longitudinal Fracture Circumferential Joint Separated Fracture Circumferential Joint Separated Fracture Circumferential Fracture Angular 85+48 Fracture Circumferential Joint Separated Access Point Manhole Fracture Circumferential 87+10 Fracture Circumferential Fracture Circumferential Joint Separated Deposits Settled Fine 89+21 Fracture Longitudinal
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H
W 0.000 0.002 0.010 0.016 0.010 0.021
0.021 0.010 0.010 Access Point Manhole Steps Missing/Broken/Corroded
3 0.000 0.010 0.010 0.010 0.67 0.010 0.000 0.000 0.010 0.010
Access Point Manhole Steps Missing/Broken/Corroded
3 0.010 0.001 0.000 0.002 0.004 0.001
0.010 0.002
0.5
1 0.000
3 0.004 0.010 0.005 0.004 0.021 0.010 0.005 0.005 Access Point Manhole Steps Missing/Broken/Corroded
3 0.004 0.010 0.06 0.063 0.000
L
At To Remarks 1 0.005" width 9 5 0.02" width 1 5 7 11 0.125" width 7 5 3/16" width 7 5 0.125" width 7 5 0.25" width 7 11 1 7 5 0.25" width 7 5 0.125" width 10 7 5 0.125" width 10 steps rusted/broken/missing 7 5 0.005" width 7 5 0.125" width 7 5 0.125" width 7 5 0.125" width 6 water depth 0.67' 7 5 0.125" width rebar exposed in circ fractures 7 5 0.005" width 7 12 0.005" width 7 5 0.125" width 2 3 5 cracks 7 5 0.125" width 10 steps rusted/broken 7 5 0.125" width 7 5 0.01" width 7 5 0.005" width 7 5 0.02" width 7 5 7 5 0.05" width 7 5 3/16" width 1 2 7 5 0.125" width 7 5 0.02" width 5 7 underwater 7 5 6 7 5 0.005" width 10 10 9 5 0.05" width 7 5 0.125" width 7 5 1/16" width 7 5 0.05" width 7 5 0.25" width 7 5 0.125" width 7 5 1/16" width 7 5 1/16" width 10 steps rusted, broken 12 12 0.05" width 10 5 0.125" width 7 5 0.75" width 7 5 0.375" width 6 11 0.005" width
Appendix G - 20
APPENDIX 1 Project 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
Start 88+23 88+36 88+36 88+48 89+21 89+21 89+21 89+23 89+23 89+23 89+99 90+50 90+63 90+98 90+98 91+24 91+55 91+55 92+03 92+06 92+11 92+11 92+35 92+40 92+71 93+02 93+19 94+13 94+15 94+15 95+10 96+15 96+15 96+26 96+26 96+26 96+31 96+81 96+81 97+50 98+70 99+35 99+87 99+88 100+77 100+80 100+88 100+89 101+46 101+74 101+74 103+60 105+09 105+53 107+10 107+12 109+13 109+27 109+29
End 88+58 89+21 88+71
92+11 92+11
92+79
94+15
96+49
96+98 100+52
100+52 101+08
109+54
Description Joint Separated Fracture Angular Fracture Angular Fracture Angular Fracture Longitudinal Joint Separated Miscellaneous General Observation Access Point Manhole Pipe Failure Hole Tap Break-In/Hammer Fracture Circumferential Miscellaneous Water Level Fracture Circumferential Fracture Circumferential Joint Offset Fracture Circumferential Fracture Circumferential Joint Separated Fracture Angular Fracture Angular Joint Offset Joint Separated Joint Separated Access Point Manhole Access Point Manhole Access Wye Fracture Circumferential Pipe Failure Broken Joint Offset Miscellaneous Water Level Fracture Circumferential Access Point Manhole Miscellaneous General Observation Crack Longitudinal Fracture Circumferential Joint Separated Crack Circumferential Crack Longitudinal Joint Separated Crack Longitudinal Fracture Circumferential Crack Circumferential Crack Longitudinal Point Repair Patch Repair Line Left Miscellaneous General Observation Access Point Manhole Joint Separated Joint Separated Joint Separated Joint Separated Miscellaneous General Observation Tap Break-In/Hammer Access Point Manhole Miscellaneous General Observation Joint Separated Line Right Access Point Manhole Miscellaneous General Observation
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
Access Point Manhole Steps Corroded Tap Break-In/Hammer Defective
Access Point Manhole Steps Corroded Access Point Manhole Steps Corroded
Access Point Manhole Steps Corroded
Access Point Manhole Steps Missing/Broken/Corroded
D
H
W 0.010 0.031
At To Remarks 7 5 0.125" width 7 5 0.375" width 7 5 multiple at 8' intervals 0.010 11 5 0.125" width 10 2 multiple longitudinal fractures, number varies 1~5 0.010 7 5 0.125" width 0.167 crown down 2" 3 10 steps rusted 1 1.00 3 1' deep 1.5 3 5 at connection 0.167 7 5 2" width 2 water 2' deep 0.083 7 5 1.5" @ 5 & 7, 1/2" @ 12 0.146 7 5 3" @ 7 & 5, 1/2" @ 12 0.083 7 5 1" offset 0.090 7 5 0.5" width, 1/5" @ 5, 2" @ 7, 3/4" @ 2 0.063 7 5 0.75" width 0.042 5 7 0.5" width 0.330 7 9 4" width 0.042 3 5 0.5" width 0.042 12 0.5' @ 12 7 5 0.063 7 5 0.75" width 3 10 steps rusted 4 2 steps rusted 7.5 3 0.33 12 12 4" width 0.25 2.00 7 5 3" depth 0.67 12 2 water 2' deep 0.208 7 5 2.5" width 2.5 11 steps rusted/bent, manhole near wendy's flow guage in invert 12 0.042 7 5 0.5" width 0.021 5 7 0.25" width 7 10 11 0.005 7 5 1/16" width 11 0.000 7 5 0.005" width 7 5 2 1 1 12 6 10
3.5 0.010 0.021 0.021 0.104
Tap Break-In/Hammer Defective Access Point Manhole Steps Missing/Broken/Corroded
1.25 3 0.042
Access Point Manhole Steps Missing/Broken/Corroded
3
L
7 7 5 6 2 10 6 5 10 6
5 5 7
7
manhole cover in invert steps rusted/broken 0.125" width 0.25" width 0.25" width 1.25" width manhole cover in invert at tee steps rusted/missing manhole cover in invert 0.5" width steps rusted/broken manhole cover in invert
Appendix G - 21
Trout Brook Sewer Inspection Project 5 5 5 5 5 5 5 5 5 5 5 5 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
APPENDIX 1 Start 109+90 109+90 109+90 110+08 112+31 112+45 112+55 112+69 112+69 112+69 112+69 112+69 114+09 117+24 117+29 117+29 117+38 117+40 120+84 121+31 121+73 122+64 124+00 125+91 126+36 126+36 126+55 126+55 126+65 126+85 127+41 127+41 127+41 127+50 127+50 127+50 127+50 127+85 129+60 129+97 129+97 130+36 130+42 130+42 130+45 130+65 130+65 130+65 130+65 130+65 130+65 130+65 130+76 130+78 134+56 135+91 136+07 136+14
End Description 110+28 Deposits Attached Encrustation 110+28 Infiltration Weeper Infiltration Weeper Pipe Failure Hole 112+39 Access Point Manhole 112+47 Pipe Failure Hole 112+69 Miscellaneous Dimension/Diam/Shape Change 117+24 Miscellaneous Dimension/Diam/Shape Change 116+23 Miscellaneous General Observation 117+29 Point Repair Patch Repair Point Repair Patch Repair 117+29 Surface Damage Aggregate Visible Access Point Manhole 117+40 Miscellaneous Dimension/Diam/Shape Change Access Wye 117+71 Deposits Settled Gravel Access Point Manhole 130+36 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 121+83 Crack Longitudinal Infiltration Weeper 122+70 Surface Damage Surface Spalling 124+59 Crack Longitudinal Access Point Manhole Joint Offset Point Repair Patch Repair Joint Offset Point Repair Patch Repair 126+85 Crack Longitudinal Joint Separated Infiltration Weeper Joint Offset Point Repair Patch Repair 128+00 Deposits Attached Encrustation 128+00 Deposits Attached Encrustation 128+00 Infiltration Weeper 128+00 Infiltration Weeper 128+00 Crack Longitudinal Crack Circumferential 130+36 Infiltration Weeper Joint Separated 130+51 Miscellaneous Dimension/Diam/Shape Change 130+49 Infiltration Weeper 130+49 Point Repair Patch Repair Access Wye 135+91 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 135+91 Deposits Attached Encrustation 135+91 Deposits Attached Encrustation 135+91 Infiltration Weeper 135+91 Infiltration Weeper 164+21 Surface Damage Aggregate Visible Joint Separated 130+81 Pipe Failure Hole Joint Separated 136+07 Miscellaneous Dimension/Diam/Shape Change 164+21 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H
0.5
0.5
Access Point Manhole Steps Corroded
W
3 1
Miscellaneous Dimension/Diam/Shape Change Chamber 9 Point Repair Patch Repair Defective
Access Point Manhole Steps Missing/Broken/Corroded Miscellaneous Dimension/Diam/Shape Change Chamber
3.5 8 1
Access Point Manhole Steps Access Point Manhole Steps Missing/Broken/Corroded
Access Point Manhole Steps Corroded
4 9 3.5
3 0.2 0.2
0.010
0.010 Miscellaneous Dimension/Diam/Shape Change Chamber 5
Access Point Manhole Steps Corroded
8 9 3
0.010 0.021 Miscellaneous Dimension/Diam/Shape Change Chamber 8 2.5
L
At To Remarks 2 5 2 5 11 1 0.5' deep 2 steps rusted 4 3' deep transition chamber 9' dia CIPC steep slope 5 7 4 8 8 4 10 chamber 4 5 7 1 steps good 9' dia CIPC 10 accessible 12 9 3 2 4 12 10 steps rusted 9 3 9 3 9 3 9 3 12 12 12 0.125" width 2 9 3 9 3 3 5 7 9 3 9 1 12 12 9 7 5 0.125" width chamber 8 10 8 3 main tunnel is still 9' dia CIPC CIPC 10 3 5 intermittent 7 9 intermittent 3 intermittent 9 intermittent 9 3 9 3 0.125" width intermittent 10 2 rebar exposed 9 3 0.25" width chamber, wye to right, 8' dia abandoned 8' CIP 10
Appendix G - 22
Trout Brook Sewer Inspection Project 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
1 1 1 1 1 1
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
APPENDIX 1 Start 136+83 137+18 138+65 139+04 139+63 141+48 141+48 141+50 142+15 142+54 145+48 148+63 150+82 151+42 152+53 153+23 153+83 154+05 156+21 156+65 157+40 157+57 158+00 158+14 159+23 159+23 160+76 161+31 162+09 162+09 162+79 163+29 163+29 163+89 163+89 164+21 164+21 164+21 164+21 164+21 164+21 166+87 166+90 167+75 168+73 168+89 168+98 169+47 169+74 170+75 171+13 171+13 171+35 172+69 172+69 172+89 173+13 173+52
End
141+50 141+50
143+59
151+56
157+40
160+25
168+73 168+73
166+95 168+00 171+13 170+48
178+09
Description Joint Separated Joint Separated Joint Separated Miscellaneous General Observation Fracture Circumferential Fracture Angular Fracture Angular Joint Separated Access Point Manhole Deposits Settled Fine Access Point Manhole Access Point Manhole Line Right Tap Break-In/Hammer Joint Separated Fracture Circumferential Joint Separated Access Point Manhole Fracture Circumferential Fracture Longitudinal Fracture Circumferential Access Point Manhole Fracture Circumferential Crack Longitudinal Crack Circumferential Joint Separated Access Point Manhole Fracture Circumferential Fracture Circumferential Joint Separated Fracture Circumferential Fracture Circumferential Joint Separated Fracture Circumferential Joint Separated Miscellaneous Survey Start Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Surface Damage Aggregate Visible Tap Break-In/Hammer Miscellaneous Survey End Surface Damage Reinforcement Visible Deposits Settled Gravel Access Point Manhole Miscellaneous Lining Change Miscellaneous General Observation Joint Separated Miscellaneous General Observation Miscellaneous General Observation Joint Separated Miscellaneous Lining Change Miscellaneous General Observation Fracture Circumferential Fracture Circumferential Surface Damage Aggregate Visible Fracture Circumferential Tap Break-In/Hammer Fracture Circumferential
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H
W 0.010 0.010
0.001 0.021 0.021 0.042 3
L
At To Remarks 9 3 0.125" width 9 3 0.125" width 12 12 construction joints deteriorating 71.5' form length 12 12 0.01" width 1 3 0.25" width 9 11 0.25" width 3 9 0.5" width 10 rice street
0.5 4 3 Tap Break-In/Hammer Active
10 2
1.25 0.010 0.010 0.010
Access Point Manhole Steps Corroded
3.50 0.010 0.010 0.021 3 0.002
0.010 3 0.010 0.010 0.010 0.031 0.010 0.010 0.006 0.010
Access Point Manhole Steps Corroded
8 2.5
Tap Break-In/Hammer Active
2.5
10 12 12 3 2 12 10 12 2 12 11 9 3 2 8 3 9 12 3 9 3 9
RR ditch drain 12 0.125" width 12 0.125" width 9 0.125" width 12 0.125" width 0.125" width 12 0.25" width 12 .02" width 12 3 9 0.125" width 4 9 3 12 9 3 9 3
2 10 4
2
8
4
0.125" width 0.125" width 0.125" width 0.375" width 0.125" width 0.125" width 0.075" width 0.125" width 8:45am; 80 deg sunny 8' CIPC rungs rusted
4:25 PM 0.33 Access Point Manhole Steps Corroded
2.5 8
2
0.073
0.125 8 0.063 0.063 0.021 Tap Break-In/Hammer Active
5 0.063
8' RCP pipe 3 5 fiberglass reinforced plastic in joints 12 12 0.5" to 1.25" width 10 2 fiberglass reinforced plastic in joints 3 2 fiberglass reinforced plastic in joints 12 12 1.5" width 8' CIPC old stationing 171+18 12 12 0.75" width 12 12 0.75" width 12 12 3 12 0.25" width 9 chamber in pond 12 12 0.75" width
Appendix G - 23
Trout Brook Sewer Inspection Project
13 13 13 13 13 13
Tunnel Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook Trout Brook
APPENDIX 1 Start 174+50 174+96 176+39 178+09 178+10 178+10 178+10 180+57 180+73 183+33 183+78 183+78 183+99 184+86 185+65 185+80 185+82 185+82 185+85 186+08 186+94 186+94 187+03 188+06 189+12 189+12 189+35 189+99 190+62 191+88 192+60 192+64 193+05 193+67 195+00 198+15 198+17 198+24 198+46 200+70 202+76
Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South) Trout Brook West (South)
0+00 0+00 0+00 0+14 0+19 0+29 0+96 1+04 1+89 1+91 1+91 1+91
Trout Brook West (North) Trout Brook West (North) Trout Brook West (North)
0+00 0+00 0+00
End
178+10 178+21 181+65 180+57 180+73 185+65 185+82
185+82 186+94 186+94 186+94 187+03 187+03 189+12 198+15 189+14
198+24 206+40
0+19 1+91 0+96 1+04 1+91
3+00 3+00
Description Fracture Circumferential Joint Separated Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Deposits Settled Fine Surface Damage Aggregate Visible Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Deposits Settled Fine Fracture Circumferential Tap Break-In/Hammer Fracture Circumferential Fracture Circumferential Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Surface Damage Aggregate Visible Miscellaneous General Observation Fracture Circumferential Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Line Up Fracture Circumferential Joint Separated Joint Separated Fracture Circumferential Access Point Manhole Obstacles/Obstructions Object Protruding Thru Wall Obstacles/Obstructions Object Protruding Thru Wall Obstacles/Obstructions Object Protruding Thru Wall Miscellaneous General Observation Miscellaneous Dimension/Diam/Shape Change Access Wye Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Obstacles/Obstructions Object Protruding Thru Wall Access Point Manhole Miscellaneous Survey Start Miscellaneous Dimension/Diam/Shape Change Deposits Settled Other Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Infiltration Gusher Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous General Observation Obstacles/Obstructions Built Into Structure Miscellaneous Survey End Miscellaneous Survey Start Miscellaneous Dimension/Diam/Shape Change Deposits Attached Encrustation
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H
W 0.010 0.021
2.5 Miscellaneous Dimension/Diam/Shape Change Bulkhead Miscellaneous Dimension/Diam/Shape Change Chamber 0.5 8 8 1
8 8 0.000
Tap Break-In/Hammer Active
1 0.000 0.010
Miscellaneous Dimension/Diam/Shape Change Chamber 4 8 Surface Damage Mechanical Aggregate Projecting 0.031 Miscellaneous Dimension/Diam/Shape Change Chamber
Access Point Manhole Steps
4 8 4 8
L
At To Remarks 12 12 0.125" width 12 12 0.25" width 10 bulkhead with 18" x 18" cutout in invert outlet structure @ pond 0.5' deep 5 7 8' x 8' transition 8' x 8' CIP box 1' depth 12 12 0.005" width 3 12 12 0.005" width 12 12 0.125" width chamber 1 rungs in good shape 8' dia CIPC, 2 pours, 1/2 pipe 5 7 multiple abandoned service connections @ 10 & 2 9 3 0.375" width chamber 9 8' dia RCP rungs in good shape 12 8' CIPC
0.5 0.001 0.010 0.001 0.0104 3
9 9 9 9 1 11 10 11
3 3 3 3 1 2 1
shotcrete patches on cold joints and fractures falling off transition section RCP 5' CIPC
Miscellaneous Dimension/Diam/Shape Change Chamber 5 5 4 Access Point Manhole Steps Corroded
9 12 11 12
3
Miscellaneous Dimension/Diam/Shape Change Chamber 2 4 8
6 11 8
Miscellaneous Dimension/Diam/Shape Change Chamber 8 4
12
0.01" width 0.125" width 0.01" width 0.125" width
1
2:45pm, 80 deg sunny chamber sand 8' dia RCP at joint chamber 8' dia RCP no steps end of tunnel bulkhead with 2' dia pipe @ end of tunnel 3:15pm 8:15am 75 deg, clear skies RCP - with back slope
8 0.5
Appendix G - 24
Trout Brook Sewer Inspection Project
Tunnel Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North)
APPENDIX 1 Start 0+37 0+43 0+45 0+97 1+36 2+92 3+00 3+06 3+08 3+16 3+25 3+31 3+31 3+31 8+69 8+72 8+80 9+13 11+77 11+83 11+85 11+96 14+94 16+59 17+56 17+59 17+62 17+66 17+67 17+97 20+94 20+98 21+00 24+23 24+28 24+30 27+23 27+28 27+41 31+82 32+80 33+96 34+01 34+03 34+60 34+62 34+69 34+84 35+61 36+35 36+47 36+82 39+88 40+68 40+73 40+75 41+24 41+43
End
3+08 3+25 3+31 8+69 7+42 8+80 11+77 11+96
17+56
17+62 17+66 20+94
21+00 24+23 24+30 27+23 27+41 33+96
34+03 40+68
40+75 43+48
Description Infiltration Gusher Joint Separated Access Point Tee Connection Infiltration Runner Infiltration Runner Infiltration Weeper Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Infiltration Runner Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Infiltration Runner Joint Separated Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Infiltration Runner Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Tap Break-In/Hammer Miscellaneous Dimension/Diam/Shape Change Infiltration Runner Miscellaneous General Observation Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Tap Break-In/Hammer Obstacles/Obstructions Object Protruding Thru Wall Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Infiltration Dripper Point Repair Patch Repair Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Point Repair Patch Repair Point Repair Patch Repair Point Repair Patch Repair Deposits Attached Encrustation Tap Break-In/Hammer Point Repair Patch Repair Point Repair Patch Repair Point Repair Patch Repair Point Repair Patch Repair Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Dimension/Diam/Shape Change Tap Break-In/Hammer Tap Break-In/Hammer
CRWD 2010 Watershed Management Plan - 9/1/2010
Modifier
D
H
W
L
0.33 1
Miscellaneous Dimension/Diam/Shape Change Chamber 4 4 Miscellaneous Dimension/Diam/Shape Change Chamber 8
6 0.27
Miscellaneous Dimension/Diam/Shape Change Chamber 4 8
Tap Break-In/Hammer Capped
Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
Tap Break-In/Hammer Active Tap Break-In/Hammer Intruding Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
4 2 8
4 8 7 0.75
At To Remarks 4 1 3 Gasket Showing 3 3 4 4 8 chamber 11 CIPC RCP - connecting between 8' RCP sections 3 chamber, 2-outlet pipe - 6' to end RCP 5 7 at each joint 1" - 5.5" CIPC w/ wye to left 11 RCP 10 at connection CIPC chamber 11 3 RCP 10 at connection 12 lift hole plugged with wood 11 transition RCP
6 1
1
4 7
6
4 7
6
4 7
6
11 2 1
steps good, albemarle RCP
1
woodbridge RCP
Miscellaneous Dimension/Diam/Shape Change Chamber
Miscellaneous Dimension/Diam/Shape Change Chamber
Point Repair Patch Repair Defective Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
11 9 10
4 7
11 RCP 2 11 10 12 12 1 11 11 11 11
Point Repair Patch Repair Defective Point Repair Patch Repair Defective 0.2 Tap Break-In/Hammer Active Point Repair Patch Repair Defective Point Repair Patch Repair Defective Point Repair Patch Repair Defective Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps Tap Break-In/Hammer Active Tap Break-In/Hammer Active
0.5
0.5
4 7 1 1
RCP through connection
11 6 1 1
RCP full of encrustations
Appendix G - 25
Trout Brook Sewer Inspection Project
APPENDIX 1
Tunnel Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North) Trout Brook West (North)
Start 43+48 43+50 43+54 45+44 45+96 45+99 46+02 47+48 47+57 48+28 48+31 48+33 49+58
End Description 43+54 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 45+96 Miscellaneous Dimension/Diam/Shape Change Point Repair Patch Repair 46+02 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 47+48 Miscellaneous Dimension/Diam/Shape Change 47+57 Miscellaneous Dimension/Diam/Shape Change 48+28 Miscellaneous Dimension/Diam/Shape Change 48+33 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 49+58 Miscellaneous Dimension/Diam/Shape Change Miscellaneous Survey End
Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South)
0+00 0+05 0+09 0+51 0+51 0+51 0+56 0+57 4+82 4+84 4+88 7+80 8+23 8+25 8+44
Miscellaneous Survey Start Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Miscellaneous Dimension/Diam/Shape Change Miscellaneous General Observation Miscellaneous General Observation Access Point Manhole 4+82 Miscellaneous Dimension/Diam/Shape Change 4+88 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 7+80 Miscellaneous Dimension/Diam/Shape Change 8+23 Miscellaneous Dimension/Diam/Shape Change 8+44 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 10+23 Miscellaneous Dimension/Diam/Shape Change
Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South) Trout Brook East (South)
10+23 11+34 11+43 11+53 15+46 15+61 15+63 15+69
11+34 Miscellaneous Dimension/Diam/Shape Change 11+53 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 15+61 Miscellaneous Dimension/Diam/Shape Change Obstacles/Obstructions Object Protruding Thru Wall 15+69 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Survey End
Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North) Trout Brook East (North)
0+00 0+00 0+06 0+15 1+92 2+57 3+42 6+15 6+20 6+26 10+67 13+44 13+52 13+54 15+40 15+42
Miscellaneous Survey Start Access Point Manhole 0+15 Miscellaneous Dimension/Diam/Shape Change 6+15 Miscellaneous Dimension/Diam/Shape Change Infiltration Runner Infiltration Runner Point Repair Patch Repair 6+26 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 13+44 Miscellaneous Dimension/Diam/Shape Change Point Repair Patch Repair 13+54 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole 15+42 Miscellaneous Dimension/Diam/Shape Change Access Point Manhole Miscellaneous Survey End
0+09 0+51 0+57 8+38 8+38
Modifier Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
D
H
W
4 7
L
At To Remarks 11
6
Point Repair Patch Repair Defective Miscellaneous Dimension/Diam/Shape Change Chamber
RCP 1
4 7
1 RCP
Miscellaneous Dimension/Diam/Shape Change Chamber 7
6
4 7
6
RCP
Miscellaneous Dimension/Diam/Shape Change Chamber 11 RCP 11:30am
7
3:45pm, 85 deg sunny
Miscellaneous Dimension/Diam/Shape Change Chamber 7.5
RCP
Miscellaneous Dimension/Diam/Shape Change Chamber 3 Access Point Manhole Steps
2 5
6 3
12
7.5 Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
2 7 6
9 start of sanitary sewer concrete spalling at SS box double lockdown hatch cover RCP
11 RCP 6' dia shotcrete lining 8
10
4 6
1 shotcrete lining
7 Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
RCP 10
2.5 7
11 3
Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
10
2 8
4
2 8
RCP at connection chamber
10 2
4:35pm
Miscellaneous Dimension/Diam/Shape Change Chamber
4 7 7
RCP 3 9 1
Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps
4:35pm, 80 deg sunny same as 15+63 Trout Brook East Extension - South Leg
2
7
4
6
4 7
1 RCP 1
Miscellaneous Dimension/Diam/Shape Change Chamber Access Point Manhole Steps Access Point Manhole Steps
8 4 7 2.5
6 11 RCP 1 5:00pm
*Tables Based on Reference from CNA Consulting Engineers 2007 Trout Brook Sewer Interceptor Logs - Dated September 27th, 2007
CRWD 2010 Watershed Management Plan - 9/1/2010
Appendix G - 26
APPENDIX #2 ESTIMATED COST SUMMARY Trout Brook Storm Sewer Repair Work (Sta. 0+00 - 186+94)
Comm. No.: 13017.002
Trout Brook Storm Sewer West Tunnel (Sta. 0+00 - 17+62)
By: Ron Quanbeck Date: 07/02/09
Repair
Labor and Material
Project
Location
Length
Unit
Unit Cost
Total
6
Repair Work Sta. 0+00 - 19+93
1993
LF
$
40.50
$
81,000
7
Repair Work Sta. 23+15 - 28+49
534
LF
$
40.50
$
22,000
8
Repair Work Sta. 28+49 - 32+33
384
LF
$
40.50
$
16,000
9
Repair Work Sta. 32+33 - 33+34
101
LF
$
40.50
$
4,000
10
Repair Work Sta. 33+62 - 59+45
2583
LF
$
40.50
$
105,000
11
Repair Work Sta. 112+76 - 136+16
2340
LF
$
40.50
$
95,000
12
Repair Work Sta. 136+16 - 168+73
3257
LF
$
40.50
$
132,000
1762
LF
$
40.50
$
70,000
$
525,000
$
525,000
14
Repair Work (West Tunnel) Sta. 0+00 - 17+62 SUBTOTAL
12954
TOTAL ESTIMATED PROJECT COST
Notes: 1 Unit Cost calculated from estmates in Figure 8.7 - 2007 CNA Tunnel Condition Report 2 See Figure 1 and Table 1 for project location and schedule