ASPIRE V.V

Page 1

ASPIRE CALEB SCHNURBUSCH I PORTFOLIO I KU M.ARCH 2022


i


AWARDS

SKILLS

EMERGENCE PAVILION (FALL 2019-DESIGN BUILD) 2020 AIA Kansas Student Small Architectural Project Honor Award Architecture Masterprize - Student Small Architecture Award

AUTODESK Revit Insight AutoCad 3Ds Max

VFW NATIONAL ART CONTEST 2x District Level Winner

SKETCHUP

FBLA REGIONALS 3rd Place - Digital Art/Design Category

Photoshop Indesign Illustrator MICROSOFT Teams Office

EDUCATION UNIVERSITY OF KANSAS, SCHOOL OF ARCHITECTURE LAWRENCE, KANSAS Class of 2022 M.Arch 5th Year Program 3.63 Undergraduate GPA I 4.0 Graduate GPA Architecture First Year Leader KU Club Golf NOTRE DAME REGIONAL HIGH SCHOOL CAPE GIRARDEAU, MISSOURI Class of 2017 3.81 GPA National Art Honors Society FBLA Athletes Give Back Varsity Golf

COMMUNICATION Relational Instrumental

INTERESTS Sustainability Parametric Design Golf Hockey Cycling Camping Bowling

CONTACT

EXPERIENCE HOLLIS AND MILLER ARCHITECTS

KANSAS CITY, MISSOURI Southeast Missouri State University Houck Stadium Renovation Learnscape 2021 Energy Modeling Validation (MAY 2021-JAN 2022)

RON GROJEAN ARCHITECTS

ADOBE

CAPE GIRARDEAU, MISSOURI

Advance, Missouri Senior Home Renovation (JAN 2021-MAR 2021)

PHONE (573)-579-1627 EMAIL calebschnurbusch7@gmail.com

SOCIALS LINKEDIN www.linkedin.com/in/7 caleb-schnurbusch

BILL ROUSSEL DRAFTING

CAPE GIRARDEAU, MISSOURI Busch Pet Products Busch Kennels Family Counseling Center Multiple Residential Projects (DEC 2018-DEC 2020)

ISSUU https://issuu.com/calebschnurbusch

ii


iii


THE FERRIS CENTER SPRING 2021 ARCH 609 STEVE PADGET

GREEN ISLET FALL 2020 ARCH 608 SHANNON CRISS

RIPPLE SPRING 2020 ARCH 508 GREGORY CRICHLOW

EMERGENCE PAVILION FALL 2019 ARCH 509 KEITH VAN DE RIET

01)

33)

59)

77) iv


THE FERRIS CENTER UNIVERSITY OF KANSAS - SPRING 2021

01


02


MISSION STATEMENT CHALLENGE THE STANDARD FOR BUILDINGS ON CAMPUS AND AROUND LAWRENCE

FULFILL THE LIVING BUILDING CHALLENGE REQUIREMENTS

EDUCATE THE PUBLIC ON THE BENEFITS OF SUSTAINABILITY

03

THE FERRIS CENTER


ORIGINAL SITE

SITE WITH ADDITION OF FERRIS CENTER

SPRING 2021

04


4

BR

7

BR

2

1

BR

5

BR

BR

6

3 BR

05

BR

THE FERRIS CENTER

BR


N

11

BR

1

KU ROTC OFFICE

2

ANSCHUTZ LIBRARY

3

SUMMERFIELD HALL

4

BUDIG HALL

5

MALOTT HALL

6

HAWORTH HALL

7

WESCOE HALL

8

DOLE HALL

9

JAYHAWK BOULEVARD

10

ACCESS ROAD

11

BAILEY HALL

12

STAUFFER-FLINT HALL

13

SUNFLOWER ROAD

14

FACILITIES OPERATIONS

15

CENTER FOR HUMANITIES

BR

BICYCLE RACK

9

BR

13

BR

12 10

14

BR SITE

8

HAWK ROUTE

15

SPRING 2021

PROPOSED BICYCLE ROUTE

06


PATH

07

TRANSITION

THE FERRIS CENTER

MOMENTUM


N

60’

SITE PLAN SPRING 2021

200’

08


2 1

1

1 3

4

4 3

5 2 1

1

1

FIRST FLOOR 09

THE FERRIS CENTER


N

+18’

+16’

+14’

1

LAB CLASSROOMS

(x6)

2

STAIRS

(x2)

3

ELEVATORS

(x3)

4

MECHANICAL ROOMS

(x2)

5

RESTROOMS

+12’

+8’

+4’

EL. 970’

15’

SPRING 2021

90’

10


2

1 5

3

3

4

2

SECOND FLOOR 11

THE FERRIS CENTER


N

+30’

+30’

+28’

+26’

+24’

1

OFFICE SPACE

2

STAIRS

(x2)

3

ELEVATORS

(x3)

4

INTERIOR LIVING MACHINE

5

RESTROOMS

+22’

EL. 970’

15’

SPRING 2021

90’

12


NORTHEAST ELEVATION

SOUTHWEST ELEVATION 13

THE FERRIS CENTER


EAST ELEVATION

WEST ELEVATION SPRING 2021

14


15

THE FERRIS CENTER


SPRING 2021

16


17

THE FERRIS CENTER


SPRING 2021

18


3’ WIDE GRAVEL TRAP 6” FORMULAR NGX RIGID INSULATION 1’ - 9” DEEP ENGINEERED SOIL WITH SEEDUM (R60) 10” CLT PANEL CEILING SUSPENSION WIRE TURF SWELL 2’ x 2’ CEILING TILE 22” SIREWALL RAMMED EARTH WALL (4” INSULATION) (R50) 1’ COMPACTED GRAVEL UNDER SLAB #4 REBAR 1’ - 9” CONCRETE FOUNDATION 8” DIA. DRAIN

19


6” FORMULAR NGX RIGID INSULATION GRAINGER RECYCLED RUBBER ROLL 60 MIL (3/8”) WOOD NAIL (30 PENNY) PAC-CLAD CONTINOUS CLEAT COPING

IPE 5/4” x 6” RAINSCREEN SIDING WITH T CLIPS T PLATE CONNECTION WITH A490 5/8” BOLT 4 1/2” 1/2” RED HEAD EXPANSION WEDGE 3/4” LAG SCREW

20


21


COMPACT GRAVEL 3” BLACK PVC SCHEDULE 40 FLEX PIPE 1’ ASHCRETE RETAINING WALL

4” ASHCRETE SLAB CARLISLE AQUATOUGH 45MIL EPDM RUBBER LINER 6” PEA GRAVEL 1’- 6” SAND 22


PAC-CLAD CONTINOUS CLEAT COPING GRAINGER RECYCLED RUBBER ROLL 60 MIL (3/8”) 10” CLT PANEL IPE 5/4” x 6” RAINSCREEN SIDING WITH T CLIPS 6” x 24” GLU - LAM BEAM

TURF SWELL 2’ x 2’ CEILING TILE 20” x 14” RECT. SUPPLY DUCT 6” x 24” GLU - LAM BEAM ONYX PV GLASS CURTAIN WALL SYSTEM 23


24


25

THE FERRIS CENTER


20” x 14” RECT. SUPPLY DUCT 20” x 14” RECT. DUCT HANGER RUSKIN DIBD23 3 HR. FIREDAMPER SAMSUNG DUCT S 18,000 BTU MINIS P L I T MINICORE ROOFTOP ERV AIR HANDLING UNIT

SPRING 2021

26


CLT ROOF PANELS

6” x 24” GLU-LAM BEAM

RAMMED EARTH SHEAR WALLS

SHEAR WALLS/ FOUNDATIONS/FOOTINGS

27

THE FERRIS CENTER


SPRING 2021

28


29

THE FERRIS CENTER


SPRING 2021

30


31

THE FERRIS CENTER


SPRING 2021

32


GREEN ISLET WEST BOTTOMS, MISSOURI - FALL 2020

33


34


WHAT MAKES A GOOD CITY?

PUBLIC TRANSIT EDUCATION AFFORDABLE HOUSING PARKS

A good city consists of several systems containing many subsystems that ultimately have a domino effect on the city. These systems fall into diverse categories that have different effects on the city as a whole or individuals who have seen direct results due to the failures in the system. A great city also recognizes failing systems, corrects them, and ultimately learns from them.

35

GREEN ISLET


N

WEST BOTTOMS

KANSAS CITY, MISSOURI FALL 2020

36


GRASS LOTS 37

GREEN ISLET


9 (9th St.)

101 (State Ave.)

106 (Quindaro-Amazon)

Old 9th St. car (1885-1904)

Old 12th St. car (1888-1913)

TRANSIT FALL 2020

38


N

39


FORRESTER AVENUE UNION AVENUE 11TH STREET 12TH STREET

GREEN ISLET represents the transition of the heat island into usable green space by incorporating individual plots for residents to grow gardens. Currently, this concrete jungle lacks many of the basic necessities for the community to use to their advantage. Without grocery stores and schools, plus little residential, the West Bottoms revitalization plan stands idle. By using the three E’s of sustainability, I propose the Green Islet to offer a safe habitat, equitable work and educational environment for all, yet consider the effect a building has on it’s natural surroundings.

40


S

W

41

GREEN ISLET


The bow tie module was inspired by the existing brick daylight warehouses.

From elevation, it appears the modules fit together such as brick coursing, but from perspective, you see the true depth of each unit.

FALL 2020

Modular design makes for easy mass production. Then, in a brick-like bond, stacked up to form larger massing.

42


43

GREEN ISLET


FALL 2020

44


45


HEAT ISLAND to

GREEN ISLAND 20 º F cooler on average Less air polution with redused use of A/C Consistent interior temperatures

46


47

GREEN ISLET


FALL 2020

48


49

GREEN ISLET


FALL 2020

50


51

GREEN ISLET


FALL 2020

52


53

GREEN ISLET


FALL 2020

54


55

GREEN ISLET


FALL 2020

56


57


58


59


RIPPLE LAWRENCE, KANSAS - SPRING 2020

60


9 SKETCHES

Delaware Street Commons lies quietly in residential Eastern Lawrence, Kansas. With over twenty years at this location, the community have begun centering their focus on self efficiency while providing for the community of Lawrence. However, existing conditions have prohibited much growth in that ideology. Lacking in essential tools, space, and a built environment has halted the expansion of Delaware Street Commons. Our studio welcomed the great task of designing a building where the community can begin working in as well as feel at home.

16 PICTURE COLLAGE 9 SKETCHES The 9 sketches represent the ideologies comprising the design. Focused around environmental systems including green roof, water collection, solar collection and recycling materials. While also using these methods to power the building and educate vistors.

16 PICTURE COLLAGE The images express a stronger understanding of materiality and flow throughout the space. I’d prefer using natural materials such as wood to create a warmth within the building, but also use concrete for easy cleaning in the dirty environments such as garden and shops.

61

RIPPLE


The purpose of the found objects model was to create a material pallette for finalizing our building. It was enjoyable for me because as I found different pieces that peaked my interest, I pondered how to include it. I started with a 2”x 6” scrap of red oak lumber, then found the rectangular steel tube. I welded a stand for it and drilled holes into the wood for all-thread. The all thread held the plexiglass above the wood, demonstrating my intention for the curtain wall to pertrude from the interior skin.

SPRING 2020

62


63

RIPPLE


My conceptual design consisted of using as much of the site as possible without overcrowding it. Keeping the profile of the new building fairly tamed also complemented the existing structures nearby. This helped with the balance of the site and cohesion of the community. The roof height does not extend above any existing roof plus the slope follows the natural contour of the site.

By drawing lines off existing buildings, rooms such as the library, auditorium, greenhouse and workshop formed naturally. They also served as the crest and trough of the wavy green roof designed to catch rain water. SPRING 2020

64


SITE PLAN

13TH STREET

65

RIPPLE

N


FIRST FLOOR

SECOND FLOOR

13

1

14 15 INDEX

2 3

4

6

5 7

8 9 10

1

LIBRARY

2

100 SEAT AUDITORIUM

3

ELEVATOR I STAIRWELL

4

MEN’S RESTROOM

5

EXTERIOR COMMONS

6

INTERIOR COMMONS

7

PREP KITCHEN

8

WOMEN’S RESTROOM

9

MECH. ROOM 1

10

GREENHOUSE

11

LOCKER ROOM

12

WORKSHOPS

13

2 BEDROOM LOFT

14

2 PERSON OFFICE

15

SINGLE RESTROOM

16

CONFERENCE ROOM

17

ELEVATOR I STAIRWELL

18

MECH. ROOM 2

16

17

18

11 12

SPRING 2020

66


NORTH ELEVATION I 1/16” = 1’- 0”

EAST ELEVATION

WEST ELEVATION 67

RIPPLE


SOUTH ELEVATION I 1/16” = 1’- 0”

1/16” = 1’- 0”

1/16” = 1’- 0” SPRING 2020

68


SOUTH SECTION

WEST SECTION

69

RIPPLE


1/16” = 1’- 0”

1/16” = 1’- 0”

SPRING 2020

70


71

RIPPLE


SHEAR WALL I HVAC DIAGRAMS

SPRING 2020

72


73


74


75

RIPPLE


SPRING 2020

76


EMERGENCE PAVILION LAWRENCE, KANSAS - FALL 2019

77


78


The initial program of the Discovery Garden project consisted of a new entryway into the public area of the garden. However, we decided to attract visitors with a gathering space doubling as a new experience in education too. All inspired from a migration map of Monarch butterflies.

79

EMERGENCE PAVILION


N

FALL 2019

80


81


82


83


Professor: Keith Van De Riet Professional Stone Carver: Karl Ramberg Teaching Assistant: Savannah Kruse Team: Jack Bindley Sarah Craig Austin Gelsomino Roe Grace John Hardie Chris Johnson Jonathan Mcgowan Julianna Ribble Emily Sanders Caleb Schnurbusch Isabella Smith John Veirs Samuel Zimmerman

84


85


CONTACT PHONE (573)-579-1627 EMAIL calebschnurbusch7@gmail.com

SOCIALS LINKEDIN www.linkedin.com/in/7 caleb-schnurbusch ISSUU https://issuu.com/calebschnurbusch

86


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.