Introductory Mathematical Analysis for Business Economics Arab World Editions 1st Edition Haeussler

Page 112

Chapter 2: Functions, Graphs, and Lines

110 + 0.37(t − 250) = 190 0.37t = 190 + 92.5 − 110 = 172.5 172.5 t= ≈ 466.22 0.37

65 + 0.41(t − 100) = 110 0.41t = 110 + 41 − 65 = 86 t=

ISM: Introductory Mathematical Analysis

86 ≈ 209.76 0.41

Thus, plan P2 is better for t between 83.14 and 209.76 minutes.

Thus, plan P3 is better for t between 209.76 and 466.22 minutes.

3. P3 and P4 intersect at the point where P3 = 110 + 0.37(t − 250) and P4 = 190. This occurs when

108 © Pearson Education Limited 2012


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.