Design Process The Bournville design was developed using a three dimensional computerised Building Information Model (BIM) which proved to be an important design tool enabling the Gifford Engineers to communicate ideas, integrate analysis and modelling and produce comprehensive co-ordinated design information. This ensured increased accuracy, greater efficiency of design and clearer communication of the design information to the Architect and Building Contractor.
ENGINEERING RESPONSIBILITIES –
Civil and Structural Engineering
–
Building Services Engineering
– Geotechnical Engineering – Drainage Design
72