2021-2022 Off-Road Adventure Guide

Page 7

ORE YOU GO PERMIT PLACEMENT MOTORCYCLES

The permit needs to be visible from the front of the left side.

ATVS/UTVS

Place the permit on the left front or left rear quadrant on permanent plastic or metal frame members visible to inspect from the front or left side.

VEHICLES WITH WINDSHIELDS

Place the permit on the lower left quadrant of the front windshield, visible from the front left side.

OPEN / CLOSE TRAIL DATES Black Hills National Forest Trails are designated as being open year-round or seasonally. Seasonal trails are generally open May 15 to Dec. 15, or Aug. 15 to Dec. 15. For the status of each trail, reference the MVUM. Trails may be closed due to activity during timber harvest. Closures are posted at trail entrances. Please obey closed signs and always be cautious of logging trucks on trails with shared use. Before riding, check with the local Ranger District on closures (Page 10). BlackHillsBadlands .com

4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
2021-2022 Off-Road Adventure Guide by Black Hills & Badlands, SD - Issuu