CIVIL ENGINEERING REPAIR AND STRENGTHENING Freyssinet: Supporting Rail BRIDGE JACKING AND BEARING REPLACEMENT MASONRY ARCH LIFTING FOR HEADROOM SUBWAY BOX SLIDING – AUTORIPAGE® TUNNEL BORE ENLARGEMENT SPRAYED CONCRETE AND BRICKWORK REPAIR LEAK INJECTION AND WATERPROOF MEMBRANES MASONRY VIADUCT STABILISATION SYSTEM SOIL NAILS AND GROUND ANCHORS

Freyssinet’s Autoripage technique allows large structures to be built offline to be slid into place in a matter of hours during a blockade. On Easter Saturday 2014, Freyssinet successfully slid the 800 tonne Rochester Station box 36 metres across the line of the Chatham Mainline in Kent. The slide took approximately 10 hours and the final position was within 8mm of target.

Freyssinet Limited Innovation House Euston Way Telford TF3 4LT T: +44 (0)1952 201901 E: info@freyssinet.co.uk Supplier No: 060626

8228_freys_railconnect_FP_Apr15_ftp.indd 1

See the masonry arch lifting model in action at RAILTEX STAND W54

www.freyssinet.co.uk

16/03/2015 09:37