3 minute read

Conceptual Collage

Next Article
Cafe Concept

Cafe Concept

Depending on the slope the building has a dominant side for the view to a wider range of landscape/context. In this Volume 1 is higher than volume 2.

Advertisement

This results in much wider opening on the existing structure to capture the dynamic landscape.

The site is entirely surrounded by dynamic canvases with sky and landscape

Static Pattern Source

Natural Dynamic Pattern Source

Layers

The sun being the main source for the shadows is the main dynamic element in nature

The branches of the trees (Natural Dynamic Pattern Source )which acts as a source for the shadow pattern is also dynamic in nature as it grows every day and can possibly change its position based on the weathering pattern by nature and seasons.

When introduced to a medium of water the refraction caused more variance on the pattern.

These layer systems provide an infinite number of pattern formation with the help of nature

Capturing the Light

In order the form the dynamic shadow pattern the chimney being the tallest existing structure was used a receptor of light

The light received will then undergo multiple reflection with the help of mirrors placed inside to make light travel to the lover part of the chimney shaft

The light then goes through a water chamber which will thus help in the additional dynamic layer for the formation of the pattern on to the feature wall outside the building.

Traces of the Old Roof

Sense of Place

The metal can be integrated in such a way the sound from the nature such as rain falling on top of a metal will generate sound and will help the user to identify the old broken left over roof position with the help of sound

The detail show how the new wall made with the combination of brick and precast concrete is connected to the existing limestone masonry wall.

122.5 mm x 122.5 mm I Profile Steel Beam

189 mm x 103 mm L Profile screwed to I Profile Beam

4x 10mm dia bolt screwed to the I Beam

440 mm thk Limestone Masonry Wall

87 mm x 50 mm C Profile screwed to 10 mm metal plate

15mm Cement Mortar

2x 10mm dia bolt screwed to the C Profile Steel 10 mm plaster finish

Annotated Detailed Section

Associated callout detail between the existing wall and the new wall of the intervention

Section Detail A

Vythiri Farmhouse

Professional Practice Team project [ 5 members ]

About

Project Type Year

Location Holiday villa

Vythiri, Wayanad,Kerala, India

2017

Brief

The project objective is to design the interior of the farmhouse located at the top of misty hills in wayanad’s Attapadi reserve forest. It serves the purpose of a holiday villa in the aysha plantation; one of client’s real estate properties on the hills. The site is located at an altitude of 1200m above sea level, giving a breathtaking view overlooking the valley.

Design Team:

Ar.George Seemon, Ar.Rohit Garabadu, Ar. Bibin Mathew Sakshi agarwal, Janhavi shinde

Project Involvement :

Material selection, Furniture and floor layout, 3D- Modeling, ,Presentation, Site co-ordination

Ko.co. Mall

Professional Practice Team project [ 5 members ]

About

Project Type

Location Shopping Center

Year

Brief

Kottayam Kerala India

2020

A commercial project with a site area of 2000 sqft, is basically a shopping center in the midst of a city at kottayam. It has a parking capacity of 100 cars at a time.The occupancy category includes retail spaces, food court, restaurants, Theater and a multi-purpose hall.

Ar.George Seemon, Ar. Jyothi, Ar. Bibin Mathew , Sakshi agarwal, Janhavi shinde

Design Team: Project Involvement :

Conceptual level design process : Sketching planning, Interior layout zoning, Floor area calculation, Client meeting presentations

Qatar Petroleum District Headquarter

About

Responsibilities Undertaken:

Material inspection request SNAG List Preparation As built inspection with AFC drawing Slab extension site inspections Metal stud strength and stability test Presentation of furniture fitout works and scorecard for evaluation Creating material checklist for the MAR [Material approval request] according to client specifications [Qatar Petroleum Specifications] - Stone flooring Laminate, Blockwork, Screed, Expansion joint Check preferred vendors list priority Site inspection for sprinkler system at Qatar Petroleum District, basement parking based on civil defense standards MAR for Gypsum partition and epoxy paint finish

Team Heads :

Project Manager : Ar.Jet

Project Co-ordinator : Er. Shibu

Courtyard Canopy Installation

Undergraduate [6th semester]

About

Location Installation

Group Installation Project Type Year Brief

Department of Architecture, College of Engineering, Trivandrum, Kerala, India

2015

To build an installation in the courtyard of the department of architecture which acts an extention of the sunshade from the first floor to the ground. The overall form is supported by steel, which is parametrically curved to the at a center point on the ground. These steel bars are connect through a large group of triangular units made of cloth-bag materials attached to a triangular steel wire profile.

Faculty Support : Project Involvement :

Prof. Jinoj M

Unit designs, On-site execution

Cloth bag material Triangular steel wire profile

Triangular units interconnected

Steel curved to the center

Guastavino Vault Workshop

Undergraduate [3rd Semester ] Group Workshop

About

Project Type

Location

Seating Structure Installation

Department of Architecture, College of Engineering, Trivandrum, Kerala, India

Year

Brief

2014

The objective was to construct a Guastavino vault inspired seating structure, designed by Ar. vinu daniel in the department of architecture courtyard The main purpose of the structure was to provide seating for the informal/formal gatherings that took place at the courtyard .

Architect Supervisor : Project Involvement :

Ar. Vinu Daniel On-site design execution

This article is from: