elevation 275’
elevation 260’
some parts of the site remain very wooded and allow for above and below relationships to occur with the built and natural environments
additional underground spaces juxtapose the sprawled tectonic of the built form within the trees
elevation 215’
elevation 200’
the ground begins to open up and the interaction between the architecture and the trees becomes more prevalent
lowest level presents the majority of the project as relating to the ground as a hollow and stretched condition
85