Bartlett Summer Show 2017 Book

Page 20

BSc Architecture Year 1 The Bartlett School of Architecture 2017

Fig. Y1.1 ‘RE-TURN, RE-INSTALL’. Year 1 installation project. Studios 7 and 9: A series of garments placed in the void of the stairwell, holding artefacts and relics from the past. Fig. Y1.2 ‘RE-TURN, RE-INSTALL’. Year 1 installation project. Studios 2 and 6: A landscape of boxes opens up to reveal maps from the history of the Euston area, while a series of heads interacts with the city’s diversity, weather and tempestuous movement. Fig. Y1.3 Charlotte Evans ‘A Fish Restaurant in the Canal’. A series of tunnels disperses smells into the surrounding area and allows the movement of cats to remain separate from areas of public use. The cohabitation of the humans and the animals living at different scales initiated the design. Fig. Y1.4 ‘RE-TURN, RE-INSTALL’. Year 1 installation project. Bonfire of old relics set in the courtyard of 140 Hampstead Road to

initiate the procession. Fig. Y1.5 ‘RE-TURN, RE-INSTALL’. Year 1 installation project. Studios 7 and 9: Fragment of the ‘tickler’ mechanism. Fig. Y1.6 Abe (Zhongliang) Huang, ‘Artefacts’ Stories’. Mapping the story of an old model.

Y1.2

Y1.3

Y1.4

Y1.5

18


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.