Architect CV

Page 1

Curriculum Vitae

Personal Information: Name: Surname:

BADRADIN ABUBAKER

Date of Birth:

01-01- 1975

Address:

MANCHESTER – UK

E-mail:

ARCHI_BADRALI@YAHOO.COM B.ABUBAKER@EDU.SALFORD.AC.UK

Web:

https://issuu.com/badradin-abubaker https://www.linkedin.com/in/architectbadradinabubaker/

Mobile:

(+44) 075 2162 9901

Educational Attainment:   

B.Sc. Architecture / School of Architecture / Salahaddin University / Kurdistan – Iraq / 1998. MSc. Architecture / BIM and integrated Design / Salford University / Greater Manchester-UK / 2014 MSc. Project Management in Construction / Salford University /Greater Manchester-UK/ 2017-2018

Objective: To work in a position in the field of Design and Construction as an Architect, Designer, Project Architect, BIM Coordinator and Site Engineer. Language Skills: Kurdish: (Mother Tongue) Excellent in reading, writing, understanding and speaking fluently. Arabic: Excellent in reading, writing, understanding and speaking fluently. English: Very good in reading, writing, Listening and speaking.

Skills & Abilities: - Ability to implement new responsibilities. - Following-up instructions well. - I have good Knowledge and ability to utilize modern office equipment & Computer software. - Hard working person. - I have good ability to work under pressure, flexible during working hours. - Working well with a team. - Having well experience adapting and familiarity to work with diverse team.

1


Computer Skills: Computers with all peripheral parts, Scanner, Printers and others…...

Computer Software: AutoCAD Floor Plan Revit Photoshop Microsoft Office Others……… Professional Societies and Activities: Member of KURDISTAN ENGINEERS UNION in Kurdistan (ID no. 804) Workshops and Training sessions: 

In May 2007, participating in a meeting and workshop in Amman-Jordan with (WHO) World Health Organization about Healthcare Facilities Design, especially Building Design of Avian Influenza Department in Erbil Teaching Hospital.

In Nov 2006, I have participated in meetings and workshops in Amman-Jordan with (WHO) World Health Organization related to Healthcare Facilities Design, especially laboratory design in General Hospital.

In Dec 2005, participating in a workshop for Engineering Projects: planning and Management in Erbil.

In April 2005, I have participated in a workshop in Duhok City, as a member of (WHO) team. It was held in cooperation with several foreign companies. This workshop was about Hospitals and healthcare facilities Design.

Summary of Employments and Professional Experiences (in reverse order): 

From December 2004 - December 2017:

I have worked at General Directorate of Health/Engineering Department -Ministry of Health, as an Architectural Designer and Construction Supervisor to prepare studies, design and Bill of quantities for many healthcare projects especially Hospitals, Medical Centers and healthcare facilities. In addition, I was a member of a committee for Implementation and Supervision projects. The projects mentioned below are some of the works: 1) 2) 3) 4) 5) 6) 7) 8) 9)

Choman Hospital – Erbi – 100 bed General Hospital, New Construction Building (2006) Repairing General Hospital of Children -50 beds –Erbil, Renovation and Extension (2008) Raparin Outpatient for children –Erbil- New Construction Building (2009) Avian Influenza department in Erbil General Teaching Hospital, New Construction Building (2008) General Health Center Type (C) a medium type building - New Construction Building (2010). Hawler-West Emergency hospital - New Construction Building (2010) Avian influenza building Project-Refurbishment (2012) Eyes Medical Center-New Construction (2016) 2


From December 2003 - December 2004:

I have worked with a company for construction named Middle East Corporation for Reconstruction and Investment (MERCI Coordination for Northern Iraq – Erbil). The company Building the project of Erbil International Hotel at that time, and I worked there as an Architect.

From April 2001 – December 2003:

I had worked with (UN) United Nations, World Health Organization (WHO) as an architectural engineering. During this period, I worked to prepare studies, designs and bill of quantities for several projects related to build hospitals and health care facilities as well as implementation and supervision those projects. I also worked as a supervisor, engineer for all WHO's projects such as: 1. 2. 3. 4. 5. 6. 7.

Hemodialysis Center / Erbil - Teaching hospital / New Construction (2001) Maternity Hospital – Erbil / Renovation & Extension (2001) C. T. Scan & Thyroid Scan & E – cam / Renovation & Extension (2002) Public Health Laboratory - Naynava / Renovation & Extension (2002) Preventative Health Building / Renovation & Extension (2003) Single Doctor Residence / Erbil - Teaching hospital (2003) Salahaddin Hospital - 50 beds / Erbil – Salahaddin District (2003)

From December 1998 - April 2001:

I had worked as an architect in the (Ministry of Works & Housing). During this period, I worked to prepare studies, designs and bill of quantities for several Projects In addition, I was a member of construction committee for supervising and constructing the belowmentioned projects. 1-Art -Palace Building: Design & Implementation (New Construction - Finished in 2002):  Location: Hallabja new street – Erbil.  A Large Cultural Building of Multi Activities for Art Professionals uses, the bald area is (2500 m2) on a total Area of site (9600m2), The Building consists of two multi story building, two large multi Purposes closed halls and two story Gallery hall, near 60 rooms in addition of Theater & gardens and parking for cars. 2. Renovation & Extension of the Building of Ministry of Industry & Energy 3. Renovation & Extension of the Building of Erbil Central Prison 4. Renovation & Extension of the Ministry of Works & Housing 5. Building of Islamic Union: Design & Implementation (New Construction)

From July 1998 - 2017:

I had established a private Bureau for Architecture and Building construction; the below-mentioned projects are some of my office works where they had been Designed, Implemented and Supervised by our office team:

3


1-Public Buildings: General Directorate of the Traffic –Kurdistan/Iraq (Finished in 2006): Location: Erbil – On the Kirkuk Main Street. 

The Project to Build on the Site area about (7000m2) and the net Building Area is (3000m2) Consist of:

Main Traffic Building in two floors that including several Administration departments, a big Multipurpose Hall, Services Rooms and Cafeteria.

Building for Car Board Manufacturing.

Building for Control and Information.

Building for Guards.

2-Commercial and Residential Buildings: 

Mr. Nashwan Building: (New Construction Finished in 2010) Erbil – on 60th meter main road inside center of city

Mr. Haji Jamal Building: (New Construction Finished in 2007) Erbil – Iskan: on the Main street of Iskan

Mr. Fawzi Building: (New Construction Finished in 2002) Erbil - Ainkawa District, on the street from Ainkawa to Erbil

3- Houses and Villas: (New Constructions) Designing and Implementing several Type of Villas and private Houses.

4- Others… (New Constructions) Designing and implementing several projects such as Parks, Gardens Landscape and Play Yards.

4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.