a) MasterFormat b) CSI Outline c) ArchList or d) ArchFile. Mid-‐Term Exam excerpt: 6. (1 points) Matching. _____ Sets shorthand designations for the quality of a. ASTM material that is required b. ANSI _____ Used to organize information about construction c. CSA MasterFormat materials and components d. CSI MasterFormat Final Exam excerpt: 7. (1 point) The CSI MasterFormat was set up in order to create a shorthand designation for the quality of material that is required. T _____ or F _____ ARCH469 Integrative Design II Assignment evidence: Integrative Design II ARCH 469 ASSIGNMENT Due 03/25/14 – MATERIAL & PRODUCT SELECTION, SPECIFICATIONS, AND DETAILING This is a major assignment – 4 weeks duration. It will result in a packet if information which will include the following: 1. Product selection, specification, and detailing. Select from commercial unit window, storefront, or glazed curtainwall. • Performance criteria worksheet or matrix • Product catalog cut sheet • Product outline specification • Product full specification (short form) • Product detail drawing (keynote tied to spec section) • Product detail drawing (specification embedded in annotations) 2. Repeat the above for a construction system. Select from exterior wall or roofing system. Assignment Sequence: 1. Download and read EPC chapter 2G. Understand the role of specifications and their relationship to construction drawings. 2. Determine performance criteria. 3. Conduct product research starting with Sweets.construction.com. Select a product to be the basis of design. Also, select 2 alternatives that would be acceptable. 4. Write an outline specification. (See example in class folder) 5. Edit the MasterSpec section. (See document in class folder) 6. Draw a detail with a keynote reference tied to the specification section 7. Re-‐draw the detail with annotations that contain the specifications information
2