Project 1: Providing housing for the residents of GHB (includind illegal )

Present scenario of housing in GHB has very large amount of illegal house constructed along the road, in between the houses and also some number of houses are constructed in the green spaces allocated to them

Advertisement

Total there are around 1324 units’ illegal out of 4478 units which makes 30 % of household are illegal in GHB in the after development there will be houses constructed for people residing illegally with some rent scheme policy so that they can house in which they live and they have to pay rent in form of installments and all the basic infrastructure facilities will be provided to them like water and electricity .

After redevelopment there will be total of around 8944 units for residentials residing inside the Public Housing as well as illegal tenants in GHB

Project 2: Improving street connectivity especially

linking to TOD

2.1 Carving new streets inside the housing colony

The proposed plan of Public housing will have 15 meters and 12-meter streets running horizontally and vertically in the plan which will provide a good connectivity from IOC to Janta-nagar road and Janta-nagar road to SH-41. This direct connectivity will reduce the travel distance by 540 meters from SH-41 to Janta-nagar road.

2.2 Providing direct connectivity to TOD

The proposed plan is having 3 major horizontal street two 15-meter road and single 12-meter road which will provide direct access to the SH-41 which is a TOD corridor, as proposal have commercial buildings along the TOD corridor

2.3 Improving street herirachy

The existing street inside the GHB is for private use only and very less street are meant for public the proposal will have 6 major streets for public use which is following a street hierarchy for better movement of traffic

Project 3: Improving green spaces

Project 4: Financing the project

3.1 Carving new green spaces inside the housing colony

The exisiting condition of green spaces in public housing is very less there is only 3.71%

Area Under Green Space

The proposed plan will have 7.40 % area under green spaces which will include parks for both public and private use.

The land along the TOD corridor will be sold to private developers to build high-rise residential and commercial buildings. The revenue generated will foster the development of low rise residential apartments.

The revenue generated from selling the land will generate 200 crore which will foster the development