ДĀRAT AL-ΚAQR (Bāhla): DOCUMENTATION AND HERITAGE MANAGEMENT PLAN (replacements of missing parts must integrate harmoniously with the whole, but at the same time must be distinguishable from the original so that restoration does not falsify the artistic or historic evidence, art. 12 of The Venice Charter 1964; any extra work which is indispensable must be distinct from the architectural composition and must bear a contemporary stamp, art. 9 of The Venice Charter 1964); • structures in “inadequate” and “ruinous” state of preservation: consolidation will be carried out by employing the most suitable available technologies at the time of intervention (where traditional techniques prove inadequate, the consolidation of a monument can be achieved by the use of any modern technique for conservation and construction, the efficacy of which has been shown by scientific data and proved by experience, art. 10 of The Venice Charter 1964).

6.2 GUIDING PRINCIPLES TO REPAIR ACTIONS The following methodological criteria must be met in implementing the general repair measures: • repair must be necessary, reversible, the minimum required to achieve the proposed result and compatible with the original fabric;

construction aspects - soil content, clay type, pH value, mud composition in bricks, mortar and plaster, strength of materials - climate aspects relative humidity and temperature both inside and outside the building units - environmental aspects thermal conductivity of mud walls and temperature of floors - use aspects - changes made to the structure which might have caused failure; • repair must take into account the results of recording and documentation in terms of historical background, social status, spatial organization and construction of the structures; • repair must take into account social, cultural and economic driving factors such as the need for local employment, maintenance of tradition and training; • repair must achieve a balance between the materials required for the intervention and the requirements of tradition; • repair must be fully documented and archived throughout works.

6.3 FAILURE ANALYSIS AND REPAIR GUIDANCE

• repair must be preceded by investigation of the reason for failure, so that recurring failure can be prevented by appropriately dealing with the causes of damage and making good effectively;

An analysis has been carried out of failure types affecting the 177 mud brick structures that still retain their original fabric. Out of a total of 241 building units that make up the settlement, 23 were built in their entirety from cement and concrete whereas 23 were of mixed construction. Those intervened upon for repair/restoration purposes and those built out of concrete have been excluded from the analysis.

• repair must be preceded by investigation into