Sunni

Page 1

001

06-Aug-12

FOR APPROVAL

H.J.AHN

Y.S.KWON

J.K.LEE

000

25-May-12

FOR APPROVAL

H.J.AHN

Y.S.KWON

J.K.LEE

REV NO.

DATE

DESCRIPTION

CHKD.

CERT.

APPD.

Project Title

CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C Client

Consultant

Contractor

Document Title

COMMISSIONING PACKAGE for ST GENERATOR SEAL OIL CREATED BY:

CHECKED BY:

DATE STARTED:

DATE COMPLETED:

OPR'G. DEPT.:

ENG. DEPT.:

THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED

QURAYYAH

APPROVAL/CERTIFICATION INFORMATION DOC.NO.

REV.NO.

SAUDI ARABIA JOB ORDER NO.

1-0923053.01 Job No.

Project Subdivision

Document Type Code

Document number

Revision

30621127

000

GAP

00038

001


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

S.N 1.0

Rev.001

TABLE OF CONTENT

PAGE

System Description

1.1

General

3

1.2

System Overview

4

2.0

References

2.1

Required Reference Documents

5

2.2

Required Reference Drawing

5

3.0

Commissioning

3.1

Phase 1 - Pre-Commissioning

5

3.2

Phase 2 - Commissioning

6

3.3

Phase 3 – Start-up Testing

6

4.0 4.1 5.0

Safety / Environmental Precautions Safety

7

Pre-Commissioning & Commissioning Activities

5.1

Phase 1 - Pre-Commissioning

8

5.2

Phase 2 - Commissioning

8

5.3

Phase 3 – Start-up(Cold System) Testing

9

6.0

Post-Commissioning System Restoration

6.1

System Restoration

10

6.2

Post Commissioning

10

7.0

Appendices

7.1

Comissioning Acceprance Certificate

12

7.2

Appendix A : Pre-Comissioning Vavle Line-up

13

7.3

Appendix B : Pre-Comissioning Electrical Alignment

16

7.4

Appendix C : Valve List

16

7.5

Appendix D : Instrument List

19

7.6

Appendix E : Equipment List

21

7.7

Appendix F : Component Hot Loop Checks

21

7.8

Appendix G : System Control Logic Checks

21

7.9

Appendix H : Post Comissioning Vavle Line-up

21

7.10

Appendix I : Post Comissioning Electrical Alignment

25

2/25


1.0

COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

SYSTEM DESCRIPTION

1.1 General. The purpose of the Steam Turbine Generator Seal Oil System is to contain hydrogen gas inside the generator and prevent it from leaking out along the generator shaft. Since the gap between the stationary generator end housing and the rotor shaft would allow hydrogen gas to escape from the generator to the atmosphere , a constant flow of pressurized oil is pumped into the gap between the rotating shaft and end housing, via the Hydrogen Seal assemblies to act as a barrier and contain the hydrogen gas. As this constant flow of oil passes through the seal assembly, it picks up small amounts of hydrogen bubbles that must be removed from the oil before it can be safely re-circulated back into the main lube oil system. Thus the seal oil system consists of a variety of equipment for both controlling oil flow and also for removing hydrogen gas from the oil.

3/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

1.2 System Overview.

4/25


2.0

COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

REFERENCES

Sections 2.1 & 2.2 are references required for the formulation of the site-specific commissioning procedures and are also necessary for the successful commissioning of the various systems. Reference document numbers that are listed are generic documents that apply to all sites.

The user fo this procedure shall verify that the most recent revision of the listed references is available for the completion of this procedure.

2.1 Required Reference Documents. 2.1.1 Shaft Sealing System

GEK-107237B

2.1.2 Lubricating Oil recommendations

GEK-27070

2.1.3 Flushing Procedure for Turbine Lube Oil System

GEK-107564

2.2 Required Reference Drawings.

3.0

2.2.1 Steam Turbine Generator System P&ID-G2FA

EE-01655(135E3659)

2.2.2 Lube Oil (Steam Turbine Systems)-VD1L

EE-01653(143E2356)

2.2.3 Electrical Control Connections-Turbine-VE02

EE-01725(144E6118)

2.2.4 One Line Diagrams Steam Turbine

EE-01734(215D1448)

2.2.5 T/G Controls Interconnection Diagram-VE45

EE-01719(397A3480)

2.2.6 ST Device Summary-VE14

EE-01728(397A3135)

COMMISSIONING OVERVIEW The objective of this procedure is to provide the procedural steps necessary to prepare this system for operation.

3.1 Phase 1 – Pre-Commissioning (Preliminary Testing). 3.1.1 The commissioning team will review and approve the turnover package for this system. Note: The installer will typically perform the shop calibration of all applicable system components as per the appropriate component test procedures and document the results/data on the appropriate standard commissioning check sheets. 3.1.2 The installer will also perform cold loop checks on all applicable system components. This

5/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

will consist of verifying wire numbers, verify device type, range, default state, wire termination assignments, junction box terminal numbers, I/O panel numbers in the loop circuit, and document results on the Master/Wiring Schematics and/or the appropriate PCS. The objective is to ensure consistency between device summary, wire lists, and I/O assignments.

3.2 Phase 2 – Commissioning. System Hot Loop Checks 3.2.1 The commissioning engineer will perform the hot loop checks, which consist of the loops response to signal injection/control system output through the loop circuit, and document results on the Master/Wiring Schematics and on the appropriate PCS where applicable. Confirm loop continuity by actuating the device and observing proper operation at the control display panel.

System Control Logic Checks 3.2.2 The commissioning engineer will simulate logic signals of one or several integrated loops to verify correct logic response/operation, and document the results on the Logic Drawings/Control Specifications and on the appropriate PCS where applicable. Control logic checks will be performed on all applicable system devices.

Examples of system control logic checks: • Auto Start of Standby Equipment; Auto Stop • Alarm and Trip Circuit Functions • Permissive and Sequence Functions

3.3 Phase 3 – Start-Up Testing. Review system turnover package prior to start-up testing 3.3.1 Section 5.3 of this procedure identifies the step-by-step activities required to place the system in initial operation 3.3.2 Section 5.3 of this procedure lists the complete electrical and mechanical line-ups required for initial system operation.

6/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

3.3.3 Section 5.3 of this procedure also identifies the test data points that are to be measured and documented by the commissioning engineer during the initial system operation.

4.0

SAFETY / EVVIRONMENTAL PRECAUTIONS

4.1 Safety. 4.1.1 No work will be undertaken, regardless of the urgency, unless it fully complies with site safety and environmental procedures. 4.1.2 Before the start of any testing it shall be confirmed that all power supplies to the system have been isolated or that they are in a known condition. The commissioning engineer is responsible for the safety of those personnel working on the system. Check for the presence of harmful electrical or mechanical potential energy before starting work. 4.1.3 Confined or enclosed space entry procedures are to be reviewed and adhered to by all personnel involved where applicable. 4.1.4 Project Lockout/Tag-out (LOTO) procedures must be followed. 4.1.5 Task Safety Precaution Table Task System Walk-down

Safety Precautions •

Ensure that area is adequately lighted for safe access and pressure gauge monitoring.

Enforce good housekeeping by removing debris from access ways. (Piping, wood, trash, extraneous materials, etc.)

Cordon off the test boundary points with barrier tape and Test In Progress signs. Commissioning team members to restrict access to only authorized employees.

Static Testing

Verify that all system checklists have been completed.

Prior to test, all in-line devices should be removed, capped, or otherwise protected.

Monitor System

Ensure that 2-man control is observed in case of an emergency or injury.

Be cautious of falling debris being blown from piping exhaust.

Radios shall be used during monitoring.

7/25

Completed


5.0

COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

PRE-COMMISSIONING & COMMISSIONING ACTIVITIES

5.1 Phase 1 – Pre-Commissioning Activities (Preliminary Tests) Task

Activity

Initial

1.

Turnover package received and accepted.

2.

Review Punch Lists (no priority 1 items allowed).

3.

General inspection (Ready for Commissioning).

4.

Mechanical line-ups complete (Appendix A).

5.

Electrical line-ups complete (Appendix B).

6.

Align instrumentation specification.

7.

System cleaning complete per Steam Turbine Generator Seal Oil System Cleaning Procedure.

and

controls

per

the

Date

control

5.2 Phase 2 – Commissioning Activities 5.2.1 Commissioning personnel should familiarize themselves with the components and testing requirements before the start of any testing activities.

As a minimum, this requires

reviewing the technical literature describing operation and testing of the various components. The Device Summary and Control Specifications should be reviewed to confirm the calibration set points and the control constant settings as applicable. The I/O Report and Interconnection Drawings should be reviewed prior to conducting the instrument loop checks. The associated MK VI drawings and any related configuration drawings should be thoroughly reviewed prior to verifying the logic sequencing and algorithms for the associated control loops. Test equipment shall be checked for proper operation and valid calibration certificates. 5.2.2 Throughout the procedure it may be necessary to remove certain valves, orifice plates, and/or instrumentation. Whenever this occurs a Component Removal/Installation Log, must be completed and tracked through testing and re-installation of said equipment. When equipment discussed above is blank flanged the blank flange location, size, and dates installed and removed shall be listed on the Temporary Blind flange

8/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

Installation/Removal Log. 5.2.3 All temporary wiring changes required by this procedure shall be documented in the Temporary Wiring Change/Jumper Log 5.2.4 Commissioning Test and Sign Off Section Step

Results Remarks

Action

1.

Verify control system available for operation.

2.

Commission Valves list per Appendix C.

3.

Commission Instruments list per Appendix D.

4.

Commission Equipment list per Appendix E.

5.

Perform hot loop checks per Appendix F.

6.

Perform control logic checks per Appendix G.

7.

Checked Sign Date

Verify Operation of PDCV-3401 per control specification (stroking, initial calibration, etc).

5.3 Phase 3 – Start-Up Testing (Cold System) Activities This Section will be used to verify and record initial start-up conditions and parameters of the system. Step

Results Remarks

Action

1.

Verify lube oil system flushing has been completed and all temporary connections have been removed.

2.

Verify seal oil l system flushing has been completed and all temporary connections have been removed.

3. 4. 5.

Perform walk-through inspection of seal oil system. Perform mechanical line-up per Appendix H. Perform electrical line-up per Appendix I.

9/25

Checked Sign Date


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Step 6. 7. 8. 9.

Rev.001

Results Remarks

Action

Checked Sign Date

Verify control system is operational. Verify MK VI operational. Pressurize generator with air through CO2 manifold. Fill and vent seal oil system piping and place seal oil system in operation in accordance with Reference (GEK 107237A).

10.

Place differential regulator in service (PDCV 3401) using care to avoid sudden pressure increases that may damage control valve diaphragm. Reference (GEK 107237A).

11.

Adjust pressure regulator to maintain proper differential pressure across seals in accordance with Reference (GEK 107237A).

12.

Verify discharge check valve reverse-flow tests (one lube oil pump breaker racked out) trip operating pump, check pressures to verify check valve closing has been completed.

13.

Verify discharge check valve reverse-flow tests (one lube oil pump breaker racked out) trip operating pump, check pressures to verify check valve closing gas been completed.

14. 15.

6.0

Perform system walk-down to verify system integrity. Investigate and correct all alarms generated during testing.

POST-COMMISSIONING SYSTEM RESTORATION.

6.1 System Restoration Following completion of testing, all temporary test equipment and arrangements are to be disconnected and the components returned to their normal configuration. Extreme care should be taken that the cleaned systems remain clean during restoration. If any wires were disconnected, these are to be reconnected and the junction boxes re-inspected and tightly closed. 6.2 Post Commissioning

10/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

6.2.1 Summary Checklist CHECK

RESULT

INITIALS & DATE

Review erection completion records and ensure all outstanding items have been cleared. Review all component PCS Check Sheets, attached Loop Check Sheets, and ensure all are completed and any outstanding items have been cleared. A complete component listing is provided in Appendix C, D & E. Review all Turnover Package Pre-Commissioning documents and ensure all outstanding items have been cleared. REMARKS

VERIFIED BY

SIGNATURE

DATE

11/25


7.0

COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

APPENDICES

7.1 Commissioning Acceptance Certificate 7.1.1 Following completion of all commissioning activities, forward this Commissioning Acceptance Certificate for the ST Generator Seal Oil System to the Commissioning Manager and to the appropriate site representative for system acceptance.

ST Generator Seal Oil Qurayyah Project SYSTEM ACCEPTANCE SIGN OFF

SIGNATURE

Commissioning Manager

Field Commissioning Engineer

Customer Representative

12/25

DATE


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

7.2 Appendix A Pre-Commissioning Valve Lineup Tag #

Appendix A Description

Valve Position

HV-3426

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM PRESSURE GAUGE ISOLATION VALVE.

CLOSED

HV-3434

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM PRIOR TO REGULATOR ISOLATION VALVE

CLOSED

HV-3446

SEAL OIL SUPPLY LINE DRAIN VALVE

CLOSED

HV-3433

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM BYPASS VALVE

CLOSED

PDCV-3401

SEAL OIL SUPPLY DIFFERENTIAL PRESSURE REGULATOR VALVE

CLOSED

HV-3402

SEAL OIL SUPPLY DIFFERENTIAL PRESSURE REGULATOR VALVE OUTLET ISOLATION VALVE.

CLOSED

HV-3407

DIFFERENTIAL PRESSURE REGULATOR DRAIN SENSING LINE MANUAL VALVE

CLOSED

HV-3435

DIFFERENTIAL PRESSURE REGULATOR SUPPLY SENSING LINE MANUAL VALVE

CLOSED

HV-3432

SEAL OIL SUPPLY LINE DRAIN VALVE

CLOSED

HV-3408

DIFFERENTIAL PRESSURER SWITCH MANIFOLD DRAIN SIDE INLET ISOLATION VALVE

CLOSED

HV-3436

DIFFERENTIAL PRESSURER SWITCH MANIFOLD SUPPLY INLET ISOLATION VALVE

CLOSED

HV-3416

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD DRAIN SIDE ISOLATION VALVE

CLOSED

13/25

Done

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix A Description

Valve Position

HV-3415

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD PRESSURE SIDE ISOLATION VALVE

CLOSED

HV-3417

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD EQUALIZATION VALVE

CLOSED

HV-3413

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD PRESSURE SIDE ISOLATION VALVE

CLOSED

HV-3412

SEAL OIL PRESSURE GAUGE (P13401) AFTER REGULATOR ISOLATION VALVE

CLOSED

HV-3445

SEAL OIL BEFORE FLOW INDICATOR 3405 DRAIN VALVE

CLOSED

HV-3447

SEAL OIL AFTER FLOW INDICATOR 3405 DRAIN VALVE

CLOSED

N/A

GENERATOR #2 BEARING SEAL PRESSURE GAUGE (PI-3461) ISOLATION VALVE

CLOSED

N/A

GENERATOR #1 BEARING SEAL PRESSURE GAUGE (PI-3462) ISOLATION VALVE

CLOSED

N/A

#1 BEARING SEAL DRAIN ENLARGEMENT DRAIN VALVE

CLOSED

N/A

#2 BEARING SEAL DRAIN ENLARGEMENT DRAIN VALVE

CLOSED

HV-3401A

LIQUID LEVEL DETECTOR ISOLATION VALVE

CLOSED

HV-3401B

LIQUID LEVEL DETECTOR ISOLATION VALVE

CLOSED

HV-3442

LOQUID LEVEL DETECTOR DRAIN VALVE

CLOSED

14/25

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix A Description

Valve Position

FCV-3459

FLOAT TRAP ASSEMBLY

CLOSED

HV-3438

FLOAT TRAP (FCV-3459) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT VENT ISOLATION VALVE

CLOSED

HV-3437

FLOAT TRAP (FCV-3459) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT DRAIN ISOLATION VALVE

CLOSED

HV-3436

FLOAT TRAP (FCV-3459) ASSEMBLY LOW POINT DRAIN VALVE

CLOSED

HV-3444

FLOAT TRAP (FCV-3459) ASSEMBLY DRAIN VALVE TO SYSTEM

CLOSED

HV-3465

FLOAT TRAP ASSEMBLY LEVEL GAUGE UPPER INLET ISOLATION VALVE

CLOSED

HV-3466

FLOAT TRAP ASSEMBLY LEVEL GAUGE LOWER INLET ISOLATION VALVE

CLOSED

HV-3405

FLOAT TRAP ASSEMBLY LEVEL GAUGE DRAIN VALVE

CLOSED

FCV-3458

FLOAT TRAP ASSEMBLY

CLOSED

HV-3404

FLOAT TRAP (FCV-3458) ASSEMBLY AND LEVEL GAUGE DRAIN VALVE TO SYSTEM

CLOSED

HV-3462

FLOAT TRAP (FCV-3458) ASSEMVLY INLET FROM SEAL OIL DRAIN ENLARGEMENT VENT ISOLATION VALVE

CLOSED

HV-3403

FLOAT TRAP (FCV-3458) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT DRAIN ISOLATION VALVE

CLOSED

HV-3408

FLOAT TRAP (FCV-3458) ASSEMBLY LOW POINT DRAIN VALVE

CLOSED

15/25

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix A Description

Valve Position

Done

Comments

Done

Comments

Done

Comments

CLOSED

FLOAT TRAP DRAIN LINE VENT DRAIN VALVE

N/A

Rev.001

7.3 Appendix B Pre-Commissioning Electrical Alignment Tag #

Appendix B Description

Alignment

/BPM-1

AC LUBE AND SEAL OIL PUMP MOTOR (BPM-1) BREAKER

RO

/BPM-2

AC LUBE AND SEAL OIL PUMP MOTOR (BPM-2) BREAKER

RO

/EBPM

DC EMERGENCY LUBE AND SEAL OIL PUMP MOTOR (EBPM) BREAKER

RO

RO=RACKED OUT

7.4 Appendix C Valve List Tag #

Appendix C Valve List Description

PCS Number

HV-3426

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM PRESSURE GAUGE ISOLATION VALVE.

HV-3434

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM PRIOR TO REGULATOR ISOLATION VALVE

HV-3446

SEAL OIL SUPPLY LINE DRAIN VALVE

HV-3433

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM BYPASS VALVE

16/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix C Valve List Description

PCS Number

PDCV-3401

SEAL OIL SUPPLY DIFFERENTIAL PRESSURE REGULATOR VALVE

HV-3402

SEAL OIL SUPPLY DIFFERENTIAL PRESSURE REGULATOR VALVE OUTLET ISOLATION VALVE.

HV-3407

DIFFERENTIAL PRESSURE REGULATOR DRAIN SENSING LINE MANUAL VALVE

HV-3435

DIFFERENTIAL PRESSURE REGULATOR SUPPLY SENSING LINE MANUAL VALVE

HV-3432

SEAL OIL SUPPLY LINE DRAIN VALVE

HV-3408

DIFFERENTIAL PRESSURER SWITCH MANIFOLD DRAIN SIDE INLET ISOLATION VALVE

HV-3436

DIFFERENTIAL PRESSURER SWITCH MANIFOLD SUPPLY INLET ISOLATION VALVE

HV-3416

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD DRAIN SIDE ISOLATION VALVE

HV-3415

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD PRESSURE SIDE ISOLATION VALVE

HV-3417

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD EQUALIZATION VALVE

HV-3413

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD PRESSURE SIDE ISOLATION VALVE

HV-3412

SEAL OIL PRESSURE GAUGE (P13401) AFTER REGULATOR ISOLATION VALVE

17/25

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix C Valve List Description

PCS Number

HV-3445

SEAL OIL BEFORE FLOW INDICATOR 3405 DRAIN VALVE

HV-3447

SEAL OIL AFTER FLOW INDICATOR 3405 DRAIN VALVE

N/A

GENERATOR #2 BEARING SEAL PRESSURE GAUGE (PI-3461) ISOLATION VALVE

N/A

GENERATOR #1 BEARING SEAL PRESSURE GAUGE (PI-3462) ISOLATION VALVE

N/A

#1 BEARING SEAL DRAIN ENLARGEMENT DRAIN VALVE

N/A

#2 BEARING SEAL DRAIN ENLARGEMENT DRAIN VALVE

HV-3401A

LIQUID LEVEL DETECTOR ISOLATION VALVE

HV-3401B

LIQUID LEVEL DETECTOR ISOLATION VALVE

HV-3442

LOQUID LEVEL DETECTOR DRAIN VALVE

FCV-3459

FLOAT TRAP ASSEMBLY

HV-3438

FLOAT TRAP (FCV-3459) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT VENT ISOLATION VALVE

HV-3437

FLOAT TRAP (FCV-3459) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT DRAIN ISOLATION VALVE

HV-3436

FLOAT TRAP (FCV-3459) ASSEMBLY LOW POINT DRAIN VALVE

18/25

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix C Valve List Description

HV-3444

FLOAT TRAP (FCV-3459) ASSEMBLY DRAIN VALVE TO SYSTEM

HV-3465

FLOAT TRAP ASSEMBLY LEVEL GAUGE UPPER INLET ISOLATION VALVE

HV-3466

FLOAT TRAP ASSEMBLY LEVEL GAUGE LOWER INLET ISOLATION VALVE

HV-3405

FLOAT TRAP ASSEMBLY LEVEL GAUGE DRAIN VALVE

FCV-3458

FLOAT TRAP ASSEMBLY

HV-3404

FLOAT TRAP (FCV-3458) ASSEMBLY AND LEVEL GAUGE DRAIN VALVE TO SYSTEM

HV-3462

FLOAT TRAP (FCV-3458) ASSEMVLY INLET FROM SEAL OIL DRAIN ENLARGEMENT VENT ISOLATION VALVE

HV-3403

FLOAT TRAP (FCV-3458) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT DRAIN ISOLATION VALVE

HV-3408

FLOAT TRAP (FCV-3458) ASSEMBLY LOW POINT DRAIN VALVE

N/A

FLOAT TRAP DRAIN LINE VENT DRAIN VALVE

Rev.001

PCS Number

Done

Comments

PCS Number

Done

Comments

7.5 Appendix D Instrument List Tag # N/A

Appendix D Instrument List Description FLOAT TRAP (FCV-3458) ASSEMBLY SIGHT GLASS

19/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix D Instrument List Description

N/A

FLOAT TRAP (FCV-3459) ASSEMBLY SIGHT GLASS

PI-3404

SEAL OIL SUPPLY FROM LUBE OIL SYSTME PRESSURE GAUGE

FI-3405

SEAL OIL SUPPLY LINE FLOW INDICATOR

PI-3402

SEAL OIL DIFFERENTIAL PRESSURE GAUGE

PI-3461

GENERATOR #2 BEARING SEAL PRESSURE GAUGE

PI-3462

GENERATOR #1 BEARING SEAL PRESSURE GAUGE

LG-3401

SEAL OIL DRAIN ENLARGEMENT LEVEL GAUGE

LG-3402

SEAL OIL FLOAT TRAP ASSEMBLY LEVEL GAUGE

PI-3401

SEAL OIL SUPPLY PRESSURE GAUGE

PDSL3402

SEAL OIL DIFFERENTIAL PRESSURE ALARM SWITCH

PDSL3406

SEAL OIL DIFFERENTIAL PRESSURE ALARM SEITCH

PDT-3402

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH

LSH-3401

SEAL OIL DRAIN ENLARGEMENT LEVEL SWITCH

PS-3404

SEAL OIL SUPPLY LOW PRESSRE SWITCH

20/25

PCS Number

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Rev.001

7.6 Appendix E Equipment List Tag #

Appendix E Equipment List Description

/BPM-1

AC LUBE ANDSEAL OIL PUMP MOTOR (BPM-1) BREAKER

/BPM-2

AC LUBE ANDSEAL OIL PUMP MOTOR (BPM-2) BREAKER

/ESPM

DC EMERGENCY SEAL OIL PUMP MOTOR (ESPM) BREAKER

PCS Number

Done

Comments

7.7 Appendix F Component Hot Loop Checks Tag #

Master / Wiring Schematic

Appendix F Description

PDSL3402

SEAL OIL SIFFERENTIAL PRESSURE ALARM SWITCH

EE-01719(397A3480)

PDSL3406

SEAL OIL SIFFERENTIAL PRESSURE ALARM SWITCH

EE-01719(397A3480)

PDT-3402

SEAL OIL SIFFERENTIAL PRESSURE TRIP SWITCH

EE-01719(397A3480)

LSH-3401

SEAL OIL DRAIN ENLARGEMENT LEVEL SWITCH

EE-01719(397A3480)

PS-3404

SEAL OIL SUPPLY LOW PRESSURE SWITCH

EE-01719(397A3480)

Done

Comments

Done

Comments

7.8 Appendix G System Control Logic Checks Tag #

Appendix G Description

Logic Check

21/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix G Description

PDSL3402

SEAL OIL DIFFERENTIAL PRESSURE ALARM SWITCH

PDSL3406

SEAL OIL DIFFERENTIAL PRESSURE ALARM SWITCH

PDT-3402

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH

LSH-3401

SEAL OIL DRAIN ENLARGEMENT LEVEL SWITCH

PS-3404

SEAL OIL SUPPLY LOW PRESSURE SWITCH

Rev.001

Logic Check

Done

Comments

Valve Position

Done

Comments

7.9 Appendix H Post Commissioning Valve Lineup Tag #

Appendix H Description

HV-3426

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM PRESSURE GAUGE ISOLATION VALVE.

HV-3434

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM PRIOR TO REGULATOR ISOLATION VALVE

HV-3446

SEAL OIL SUPPLY LINE DRAIN VALVE

HV-3433

SEAL OIL SUPPLY FROM LUBE OIL SYSTEM BYPASS VALVE

PDCV-3401

SEAL OIL SUPPLY DIFFERENTIAL PRESSURE REGULATOR VALVE

HV-3402

SEAL OIL SUPPLY DIFFERENTIAL PRESSURE REGULATOR VALVE OUTLET ISOLATION VALVE.

22/25


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix H Description

Valve Position

HV-3407

DIFFERENTIAL PRESSURE REGULATOR DRAIN SENSING LINE MANUAL VALVE

HV-3435

DIFFERENTIAL PRESSURE REGULATOR SUPPLY SENSING LINE MANUAL VALVE

HV-3432

SEAL OIL SUPPLY LINE DRAIN VALVE

HV-3408

DIFFERENTIAL PRESSURER SWITCH MANIFOLD DRAIN SIDE INLET ISOLATION VALVE

HV-3436

DIFFERENTIAL PRESSURER SWITCH MANIFOLD SUPPLY INLET ISOLATION VALVE

HV-3416

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD DRAIN SIDE ISOLATION VALVE

HV-3415

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD PRESSURE SIDE ISOLATION VALVE

HV-3417

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD EQUALIZATION VALVE

HV-3413

SEAL OIL DIFFERENTIAL PRESSURE TRIP SWITCH (PDT-3402) MANIFOLD PRESSURE SIDE ISOLATION VALVE

HV-3412

SEAL OIL PRESSURE GAUGE (P13401) AFTER REGULATOR ISOLATION VALVE

HV-3445

SEAL OIL BEFORE FLOW INDICATOR 3405 DRAIN VALVE

HV-3447

SEAL OIL AFTER FLOW INDICATOR 3405 DRAIN VALVE

23/25

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix H Description

Valve Position

N/A

GENERATOR #2 BEARING SEAL PRESSURE GAUGE (PI-3461) ISOLATION VALVE

N/A

GENERATOR #1 BEARING SEAL PRESSURE GAUGE (PI-3462) ISOLATION VALVE

N/A

#1 BEARING SEAL DRAIN ENLARGEMENT DRAIN VALVE

N/A

#2 BEARING SEAL DRAIN ENLARGEMENT DRAIN VALVE

HV-3401A

LIQUID LEVEL DETECTOR ISOLATION VALVE

HV-3401B

LIQUID LEVEL DETECTOR ISOLATION VALVE

HV-3442

LOQUID LEVEL DETECTOR DRAIN VALVE

FCV-3459

FLOAT TRAP ASSEMBLY

HV-3438

FLOAT TRAP (FCV-3459) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT VENT ISOLATION VALVE

HV-3437

FLOAT TRAP (FCV-3459) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT DRAIN ISOLATION VALVE

HV-3436

FLOAT TRAP (FCV-3459) ASSEMBLY LOW POINT DRAIN VALVE

HV-3444

FLOAT TRAP (FCV-3459) ASSEMBLY DRAIN VALVE TO SYSTEM

HV-3465

FLOAT TRAP ASSEMBLY LEVEL GAUGE UPPER INLET ISOLATION VALVE

HV-3466

FLOAT TRAP ASSEMBLY LEVEL GAUGE LOWER INLET ISOLATION VALVE

24/25

Done

Rev.001

Comments


COMMISSIONING PACKAGE FOR ST GENERATOR SEAL OIL

Doc. Number

QURAYYAH COMBINED CYCLE POWER PLANT

30621127-000-GAP-00038

Tag #

Appendix H Description

HV-3405

FLOAT TRAP ASSEMBLY LEVEL GAUGE DRAIN VALVE

FCV-3458

FLOAT TRAP ASSEMBLY

HV-3404

FLOAT TRAP (FCV-3458) ASSEMBLY AND LEVEL GAUGE DRAIN VALVE TO SYSTEM

HV-3462

FLOAT TRAP (FCV-3458) ASSEMVLY INLET FROM SEAL OIL DRAIN ENLARGEMENT VENT ISOLATION VALVE

HV-3403

FLOAT TRAP (FCV-3458) ASSEMBLY INLET FROM SEAL OIL DRAIN ENLARGEMENT DRAIN ISOLATION VALVE

HV-3408

FLOAT TRAP (FCV-3458) ASSEMBLY LOW POINT DRAIN VALVE

N/A

FLOAT TRAP DRAIN LINE VENT DRAIN VALVE

Rev.001

Valve Position

Done

Comments

Alignment

Done

Comments

7.10 Appendix I Post Commissioning Electrical Alignment Tag #

Appendix I Description

/BPM-1

AC LUBE AND SEAL OIL PUMP MOTOR (BPM-1) BREAKER

RI

/BPM-2

AC LUBE AND SEAL OIL PUMP MOTOR (BPM-2) BREAKER

RI

/ESPM

DC EMERGENCY SEAL OIL PUMP MOTOR (ESPM) BREAKER

RI

RI=RACKED IN

25/25