An easy overview of leveling a floor before tiling

Page 1

An easy overview of leveling a floor before tiling If you are intending on opting for floor tiling in Milton Keynes, then you have to ensure that the floor is entirely level and balanced. Tile floorings are really attractive but if they are refrained from doing appropriately, they can look simply as terrible and that would ultimately develop more work for you. What is more is that if you have to redo the entire flooring again, then it would generate additional expenses. The very first thing you need to make certain of is that the flooring upon which the tiles are laid down is strong enough to handle the weight of the tiles.

Normally, the concrete floorings are preferable for this type of a task however you ought to still check to see if it is well balanced. It is advised that you utilize self-leveling concrete for the best results. Now, prior to you begin, you need to make certain that you have the proper tools and products to ensure optimal performance. Following items are required for the successful completion of your job.     

Floor leveling compound A four-foot nylon String Trowel Drill and blending container Five-gallon pail

Use the following guidelines if you are leveling your floors: High and low areas Utilize the right tools to inspect the high and low spots in the floors. Mark all the low areas with a pencil so that you know where to use your effort.


Make the leveling compound Next thing you have to do is make the leveling substance in a container (the directions are supplied with the leveler). Typically, it involves adding 2 inches of water in the pail and after that filling the remaining bucket with the substance. Then, effectively blend the water and the substance in the bucket till a smooth texture kinds. If you are unsure about the water to powder ratio, then describe the directions that came with the leveling substance or from the shopkeeper who sold you the item. Add enough leveling compound and water until you have a one-gallon mix. It must have the consistency as that of a thin soup. Put the liquid Now, pour the liquid over the low areas you marked earlier. Make sure to start from the corner that is outermost from the door. When you put the liquid, let it settle prior to you include more and use a trowel to level the mix where it is needed. Setting As soon as you begin filling out all the low areas, do the in such a method that you can gradually move to the door as you reach completion. Let the entire floor dry for a minimum of 24 hours. It needs to effectively set before you can start with floor tiling in Milton Keynes. The something you need to keep an eye out for is that these compounds do not need to be completely dried off otherwise the tiling will not sit. You need to only let them dry to a point where they are treated and can be tiled. Some floors can be dealt with after 3 hours of utilizing the leveler however it is suggested that you let it sit for 24 hours.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.