Eolica Catálogo

Page 1

2021-2022 BIANNUAL REPORT
TABLE OF CONTENTS 1. Welcome to Eólica 2. About Us 3. Our Numbers 4. This is Eólica 5. History 6. Our Offices 7. Projects 8. Our Team 9. Smart O&M (Operation and Maintenance) 06 08 10 12 14 20 28 48 55
26 28 55 14 48 We
What
us valuable: our
Our Trajectory Excellence in Projects Our Projects O & M Software 56 Inside WindIntelli
build the future by honoring the past
makes
people

THE UNSTOPPABLE NEW ERA OF WIND AND SOLAR ENERGY

Being a pioneer company in the renewable energy sector in Brazil is an enormous historic mark. At the same time, maintaining the high-quality international level of wind and solar projects is always challenging.

This is Eólica Tecnologia . An effervescence company always in the frontier of innovation that contributes to Brazil’s protagonism role in the new green world economy and global climate solution.

7
7

Eolica Tecnologia Ltda is one of the leading companies in wind farm development and operation in Brazil. A company that develops, builds, operate and manages renewable energy projects, having a leading role in the wind and solar energy sector.

The company relies on the expertise of its president Everaldo Alencar Feitosa, Ph.D. (Aeronautics and Astronautics, Southampton University, U.K.), a renowned advisor to several renewable energy institutions, former president of the Brazilian Wind Energy Centre (CBEE), and vice president of the World Wind Energy Association (www.wwindea.org). A pioneer in the development of wind energy, he was responsible for the implementation of the very first wind turbine in the country in 1992, as well as the largest hybrid wind-diesel system in the Americas.

Eólica Tecnologia has been in operation in Brazil since 2000.

9 Construction & Installation Operation & Maintenance Financing Project Development Condition Monitoring PMS*: Performance Monitoring System CMS*: Condition Monitoring System WindIntelli*. PMS, CMS and WindInteli are systems developed and used exclusively by Eólica Technology * Eólica Technology acts in all phases of a solar and wind project
HIGHLIGHTS | EÓLICA IN NUMBERS 200 MW WIND OPERATIONAL 95 MW WIND UNDER CONSTRUCTION 90 MWp SOLAR UNDER CONSTRUCTION 3,000 MW PIPELINE WIND & SOLAR

WIND TURBINES IN OPERATION

7

EÓLICA IS PRESENT IN 7 STATES OF BRAZIL

11
20
134
YEARS OF WIND DEVELOPMENT IN BRAZIL

THIS IS EÓLICA

Our history is also the history of renewable energy in Brazil

13

TIMELINE EÓLICA

OUR HISTORY

1995

Eólica Tecnologia is responsible for the development of more than 70% of Brazil’s wind projects.

Starts the construction of the first Wind Farm of the Eólica Group: Alegria Wind Farm, with 92 turbines.

The wind farms

Gravatá (25 MW), Pedra do Reino (18 MW) and Pirauá (5 MW) starts operating

2004

Installation of the first wind turbine of Brazil, in OlindaPernambuco. Installation of the first wind turbine in Fernando de Noronha

2005 Eólica Tecnologia sells part of its projects to Pacific Hydro, CPFL and Életricité de France

2008 2010 2012

The largest Brazilian Wind Farm start operations: Alegria Wind Farm - 151 MW, in Guamaré - RN.

2011

The company’s founder, Dr Everaldo Feitosa, is elected vice-president of the World Wind Energy Association (WWEA)

“WindIntelli” launch: Wind Farm Monitoring Software. Developed 100% inhouse

The Eólica Group together with Furnas - Eletrobrás win the A-5 Auction promoted by the Federal Government with 274 MW of wind projects

2017

2018

2020

2022 New company headquarters in a building listed by the Historical Heritage Recife-PE/ Brazil

2012 2013

The company develops the PMSPerformance Monitoring System, a unique system to increase generation in wind power plants.

2015

Eólica Tecnologia wins the A-6 Auction 2017 for the implementation of the wind projects Ouro Branco-1, Ouro Branco-2 and Quatro Ventos

Starts the development of Project Sol Vermelho, the newest Eólica’s solar project

Eólica wins the Solar Energy Auction promoted by the Federal Government with 90 MW of the Boa Hora Complex

1515

FIRST WIND TURBINE OF BRAZIL

Installed in Olinda, Pernambuco State, Brazil.

Thanks to Eólica’s wind turbine it was possible to generate electricity for Olinda’s historical monuments.

UNESCO - The United Nations Educational, Scientific and Cultural Organization –awarded Olinda the title of Cultural World Heritage Site in 1982.

17

FIRST WIND TURBINE OF FERNANDO DE NORONHA

Island located 400km from the coast. Pernambuco State, Brazil.

Eólica built the largest Wind-Diesel Hybrid System in South America, on the island of Fernando de Noronha.

*Fernando de Noronha is a UNESCO Natural World Heritage Site since 2001.

19

OUR OFFICES

21
Headquarter Recife
23
INNOVATIVE ARCHITECTURE AMID
OF THE OLDEST HISTORIC STREETS
ONE
IN BRAZIL

Eólica Tecnologia did the restoration of one of the oldest historical buildings in Brazil (17 th century). The main office captures the effervescence and inspiration of the time when Recife was the principal metropolis of the Americas.

25
25

WE BUILD THE FUTURE BY HONORING THE PAST

In the basement of our office in Recife is an old wall built in the 17 th century to protect the city during the Dutch period (1630 - 1657). The origins of the settlement of Pernambuco date back to 1536 by the Portuguese Duarte Coelho Pereira (14801554). The Captaincy of Pernambuco was a gift from Dom João III, King of Portugal at the time.

The ruins of Recife’s founding site, just below Eólica’s head office building
27

EÓLICA’S PROJECTS

29

Excellence in projects: a unique value of Eólica

Eólica Tecnologia has developed over 2,000 MW of wind and solar projects in several locations in the Northeast and other regions of Brazil. Our excellence in project development also brings excellence to the areas of Construction and Operation .

31
MAP OF PROJECTS MA PI CE BA SE RN PB PE AL WIND | IN OPERATION 194.7 MW WIND | READY TO BUILT 1,260 MW SOLAR| READY TO BUILT 1,212 MW CURRENTLY OWNED BY THIRD PARTIES 573 MW Praia Formosa 105 MW Paracuru 25 MW Foz do Rio Choro 25 MW Icaraizinho 54 MW Acaraú 70 MW Malakoff 250 MW CE | CEARÁ MG Topázio 250 MW Atlântico 450 MW MG | MINAS GERAIS BRAZIL Northeast Region, Brazil

RN | RIO GRANDE DO NORTE

Serra do Mel 84 MW Famosa 3 120 MW

Alegria 1 51 MW Alegria 2 101 MW

Marco Zero 333 MW Aurora 216 MW

Solar Alto 552 MW

PB | PARAÍBA

Millennium 10 MW

PE | PERNAMBUCO Pirauá 5 MW Gravatá 20 MW Ouro Branco 72 MW Quatro Ventos 22 MW

Pedra Azul 117 MW Boa Hora 1 30 MW Boa Hora 2 30 MW Boa Hora 3 30 MW

Headquarter | Recife (Pernambuco’s Capital)

Boa Hora 4 27 MW Boa Hora 5 27 MW Boa Hora 6 27 MW Boa Hora 7 27 MW

Boa Hora 8 27 MW Boa Hora 9 27 MW Boa Hora 10 24 MW Boa Hora 11 24 MW

BA | BAHIA

Pedra do Reino 3 18 MW

33

WIND FARM ALEGRIA

Total capacity: 151 MW Location: Guamaré-RN Number of turbines: 92 35

WIND FARM GRAVATÁ

37 Total capacity: 20 MW Location: Gravatá-PE Number of turbines: 12

WIND FARM

PIRAUÁ

39 Total capacity: 5 MW Location: Macaparana-PE Number of turbines: 3

WIND FARM

PEDRA DO REINO

41 Total capacity: 18 MW Location: Sobradinho-BA Number of turbines: 6

WIND FARM OURO BRANCO

Total capacity: 72 MW Location: Poção-PE Number of turbines: 16

WIND FARM QUATRO VENTOS

45 Total capacity: 22.5 MW Location: Macaparana-PE Number of turbines: 5

SOLAR FARM BOA HORA 4, 5 & 6

47 Total capacity: 81.9 MWp Location: Tacaimbó-PE Start of Operation: 2024 Winning project of the A-3 2021 Auction

WHAT MAKES US VALUABLE: OUR PEOPLE

The main values of our team and company are: Agility, Versatility, Excitement, Trust, Courage and Ambition.

49
49

OUR TEAM

51

FUEL THAT

TALENT: THE

DRIVES EÓLICA

SMART O&M

We are pioneers in Wind Energy operation in Brazil. Our pioneer spirit can also be felt in the creation of our original systems.

The actions of our Smart O&M (Operation & Maintenance) Systems results in more availability, quality, reliability and extension of the wind turbine´s lifetime. We are able to reduce maintenance costs and unplanned downtimes with systems developed and used exclusively by Eólica, such as:

. CMS – Condition Monitoring System

. PMS – Performance Monitoring System

55
55

INSIDE OUR EXCLUSIVE SMART O&M

OPERATION AND MAINTENANCE

57

CMS Condition Monitoring System

System for monitoring the condition and operational health of the wind turbine based on the analysis of vibrations of its main components, which makes it possible to identify defects in advance.

Eólica Tecnologia has a Vibration-based Condition Monitoring System (CMS) on all wind turbines. The targets of the system are reduction of maintenance costs, increase of availability, avoidance of unplanned downtimes, improvement of quality & reliability and extend wind turbine’s lifetime.

Futhermore, Eólica Tecnologia has developed its own online system to treat and analyze automatically a large database from specific vibration data for all main components of the wind turbine. It works in three main steps: data acquisition using 8 sensors per turbine, signal processing/analysis with various techniques, and daily tracking/diagnosis. The system is also capable of generating reports and alarms identifying the fault and its location, maximizing reliability of Eólica Tecnologia’s wind farms.

59
59

PMS Performance Monitoring System

Performance monitoring system for wind turbines based on operational data (SCADA system) to detect deviations and operating anomalies.

Eólica Tecnologia developed the Performance Monitoring System (PMS) as an effort to optimize the production and reduce O&M costs of its own wind farms. Data from the Supervisory Control and Data Acquisition (SCADA) system (which records every possible operational characteristic of the wind turbines) is used as input to the performance monitoring solution. The data analysis of our PMS system is able to capture the true state of each wind turbine and detect performance issues, which in turn are readily informed to O&M manager that ensures their correction.

THE SYSTEMS DEVELOPED AND USED EXCLUSIVELY BY EÓLICA ALSO COUNTS WITH:

WIND TURBINE DASHBOARD

Individual wind turbine dashboard

Key performance indicators in evidence

Real power curve versus reference power curve plot

Energy production per wind speed bin

ALARM MANAGER

Downtime events Key Performance Indicators

Filter events clicking directly on the chart

Energy and financial loss by downtime event type

Metrics based on duration and frequency of alarms

VIBRATION OVERVIEW

Wind turbine components vibration general data

Historical vibration levels heat map

SPECTRUM ANALYSIS

Interactive spectrum plot

Wind turbine components main frequencies available

Set harmonics and sidebands

Automated analysis per frequency band

63
THE PIONEER BRAZILIAN WIND
ENERGY
COMPANY Rua do Bom Jesus, 207 | Recife Antigo | Recife . PE | Brazil www.eolica.com.br

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.