Getting the design right makes commercial sense

Nigel Waring, Business Development Manager at 48.3 Scaffold Design, discusses how prioritising scaffold design ahead of contractor appointment, and collaborating with permanent works teams, can improve profit margins.

For clients, scaffolding is often the first thing needed but the last thing that is thought about. So it comes as no surprise that the variation costs on some projects can range from 60–150%. So how can scaffold design be the solution to reducing such wild variation costs? Quite simply, proper upfront planning, design and management WILL reduce costs.

Advertisement

By encouraging clients to remove scaffold design from their scaffolding package and appointing a competent scaffold designer early in the project, a clearly defined scope of works and design can be developed that will meet the needs of the project for its duration.

Combine this with an integrated approach between temporary works design and permanent works design, and clients can then be confident of the suitability and compliance of the scaffolding they will be procuring from contractors at tender stage.

On a recent project with Blue Sky Building, construction director Laurence Baptiste, commented on the benefits from a client perspective during the construction of the luxury Radisson Blu hotel in Leicester Square. After appointing a scaffold designer upfront, prior to appointing the scaffold contractor he explained; “It allowed us to develop a clear scope of works to suit the contract and it meant that when we went to tender, the contractors were tendering on a level playing field”.

For the majority of trades design work is undertaken pre-tender, yet the scaffolding requirements are often left open to interpretation by the scaffold contractor. With an agreed scope of works and design in place, scaffold contractors are competing fairly when it comes to tendering for projects. For the contractor who is then awarded the project, the use of a client issued design means that the contractual headaches associated with negotiating variations is all but eliminated. In an increasingly, price driven marketplace this should offer more cost certainty.

Prioritising scaffold design in the early stages of the project can reduce risks, improve margins and increase productivity for both contractor and client!

New Alto Scaffmate Duo

Scaffolders complying with SG4:15 often find it necessary to carry two steps to achieve 0.5m and 1.0m step ups. The new Alto Scaffmate Duo allows scaffolders to replace two items of equipment with one dual height step up.

The Mac Universal Brickguard

Teesside based JMAC Safety Systems have launched their latest product – The Mac Universal Brickguard, created by scaffolders, for scaffolders.

Neatly folding in half to create dual height functionality, the Alto Scaffmate Duo makes the 0.5m hop up step redundant –reducing the amount of equipment to buy, store, carry to site and maintain.

The Alto Scaffmate Duo is corrosion resistant, durable, lightweight, compliant, convenient and auto-latching. The Duo folds flat for easy compact storage and is available direct from the manufacturer Lakeside Industries, and a range of scaffolding stockists. The list price is £125 plus VAT.

Alto Access Products are specialists in aluminium access products – designed for purpose and renowned around the world for their quality, strength and durability.

FIND

The JMSS Brickguard has been designed to overcome the rosette on ring system type scaffolding to provide a flush, continuous run along the scaffold. The unique design of the handle provides a robust, durable and secure connection to the handrail, with the ability to be used on the three different ledger types between 30mm and 60mm.

Their new offering also features two increased length toe board connectors, meaning the design provides high performance on either system scaffold toe boards at 150mm or timber toe boards at 225mm.

The product has been tested to BS EN 12811 – 1 on all major scaffolding systems, and claiming unrivalled performance.

Customers can purchase these products in any colour, with their logo and branding; providing promotion for the business and a strong deterrent against theft.