Architecture + Design

Page 1

Professional Graduate Undergraduate



professional works BIM process- LAX Tom Bradley Intl. Terminal U-fone Telecom headquarters Seismic design- Students hostels Product Design

graduate studio SEHEN- Single family house Parametric pavilion Live/work typology for Los Angeles Objectified body collection Urban hybrid

undergraduate studio Thesis: Interactive nature park Sketches



professional 3

03


North Concourse

Core


Professional work Employer: Walsh Construction Project cost: $ 2 billion

Responsibilities: - Assisting in 3D Coordination meetings with subcontractors - Assisting in 3D digital navigation + clash detection using Navisworks - Designing + compiling a detailed publication showing the BIM process

South Concourse

- building information modeling

I have been working with Walsh Construction since June 2012 in their BIM department. I am currently documenting the BIM process at LAX and performing 3D coordination meetings with subcontractors. This opportunity has provided me a great deal of insight into the world of construction and project management.

BIM

June 2012- Present

05


Building Systems

Electrical

North Concourse

Mechanical

Plumbing

Fire protection

Curtain wall

Core

Metal panel

Baggage handling

Structure

CMU

South Concourse

Elevators

Cast in place concrete

BIM process

Confederation Tool Autodesk Navisworks


Structure

Plumbing

Electrical

Interior framing

Mechanical

Fire protection

CMU

Metal Panel

Curtain wall

Systems Identification

07


Systems Complexity Typical gate- All systems


09


All systems Section through Core & North concourse


Sectional perspective Structural system Baggage handling with catwalks Mechanical system Combined system

Systems complextity (Core) Baggage Handling + Other systems

11


All systems Section through Core


13



Professional work Employer: EA Consulting pvt.ltd Project: Ufone telecom office building design demanded a scheme that encouraged interaction within the building and its functions. A central piazza was thought to be the focal element within the scheme that would firstly fulfill the nature of the functions i.e,the connection within themselves and secondly the piazza would expose different vantage points and vistas within the site since it lacks views outside. Site Area: 200,000 sft Competition entry: 1st Position

telecom

March 2009- June 2009

Program: Offices, R&D department, Business center and call center Role: Part of preliminary/ concept design team

15


business center

office

office

Longitudinal section

R & D

Aerial view/ plan


22 17



Professional work

students

Jan 2009- April 2010

NORTHERN AREAS

Employer: EA Consulting pvt.ltd

Funding: International development Bank

AFGHANISTAN

Role: Part of design team + Coordinator

PUNJAB

hostels

Project Location: Kohistan mountain range, Pakistan

KASHMIR

BALOCHISTAN 19



Product design

Transformable stool: The design is based on the mechanics of a HINGE. The product serves as a table, a stool and a lamp. All three systems can be explored by rotating the product around the 45 degree hinge. All the details are custom designed and manufactured. Materials: Wood, custom designed stainless steel hinges and base, white synthetic leather for bench cushioning

transformable

Dec 2009- IVS Alumni Exhibition, Karachi, Pakistan

21


Stool side up


Table + Lamp side up

23


Lighting patterns


25



graduate 27



Graduate Studio Location: Orange county, CA, USA Project “SEHEN”: “Sehen” means to surround, collect and connect. “Sehen” is about redefining the architectural typology- in this case a house of 950 sqft. for a young married couple. The design is based on creating experiences at multiple levels by introducing sectional diversity in the scheme. The ramp is used to connect different parts of the house together. The ramp landings define new unique functional spaces. Hence ramp connects the whole house together choreographically. Courtyard is the collector of sunlight and can be used as an outdoor space. It can also be used as an extesion of the living space in case of large parties and social gatherings.

solar decathlon

Spring 2012

29


Plan (all

levels)


Thin film PV panels

Standing seam metal roof

Modular garden system

Plywood & wood joists

Metal Ceiling

High performance glass Sliding wall panels Drywall- white paint

Bamboo wood flooring

Material Assembly

31


Sectional Perspective


Complete Assembly

2x10 roof joists @ 2’ apart

2x4 stud wallstaggering @ 16”

Modular garden structure

2x10 floor joists @ 12” apart

Complete Structural Assembly

33


Interior view

Elevations


Exterior view from the deck

35



Graduate Studio Project: A pavilion consisting of three conditions; - Wall - Roof - Bench Design strategy: Parametric explorations based on the repetition of one single module Software used: Digital project(Gehry Technologies)

pavilion

Fall 2011

37



floor condition flo

wall condition wal ion

roof condition roo

39



Graduate Studio Project: Exploring work-live typologies o for the growing city of Los Angeles. Los Angeles is a sprawling city and lacks public spaces. The main idea of this design is to concentrate on strategies that create public spaces that have a sense of place and community. Another important aspect is to identify the new typologies of living and working in the emerging global trends and lifestyles. Master plan: 10 million sft Detail design: 01 million sft Program: Offices, apartments, lofts, digital library, hotel, urban park, amphitheatre, auditorium

LIVE LI

WOR ORK

campus c stacked horizontal horiz

live work

Fall 2011

lofts

hotel studi io/ o 1 bed SHARED FUNCTIONS

41


Broadway

Future connection -to Dodger Stadium

public facilities

Main

historic re-use

Spring

main streets re-use potential use remains the same

Existing Site

Buildings of importance

Barriers/opportunities

Broadway

Future connection to Dodger Stadium

Broadway Future connection to Dodger Stadium

Main

corn fields

Spring

Spring

opportunity for connection main roads mixed use development zone

Possibilities of connection

Green Infrastructure

research & development zone

P

Future research campus Future research campus zone

Broadway Future connection to Dodger Sta dium

Future entertainment Future entertainment zone zone

P

Main

vehicular

Spring

freeways

vehicular P

proposed tram proposed parking

Proposed Road alterations

major pedestrian

Future Extension


Quieter Zone for family sized apartments, mid to low rise

Public functions (Resturants, Health Spa) opening out to the park Hotel in proximity of Dodger’s Stadium and its proposed future development and the Park, 1 million sq’

Campus Style office space 2 and 3 Large Starbucks Style Rental Offices on Ground Floor

1.6 million sq’

Utilizing existing fabric/footprints

Research and Development Office, Horizontally structured companies 2-4 Utilizing existing fabric/footprints

2.5 million sq’

Hybrid Zone with Shared Programme opening up to park: Amphitheater, convention center, function/ conference halls for public use as

Metro Stop`

well as office,

0.4 million sq’

Leased Office Space 0.6 million sq’

Corporate Office towers. Markers for the start of the urban development,

1.4 million Sq’

Campus Style office space 1, 1million sq’

Site forces

43


Sectional perspective through hotel and office tower


LOUVERED SKIN FACADE

STRUCTURE

VERTICAL CIRCULATION

WORK

LIVE

SHARED FUNCTIONS

PARKING

45


Ecotect analysis


horizontal for South

hybrid for West

Component detail

Facade development

Horizontal shading that moves into building space to create winter gardens where office workers can gather and take advantage of solar gain in winter + in summer. Trees provide protection against direct solar and thermal gains

47



49



51



Graduate Studio Project: Extension to an existing building to serve as a gallery space. The design aims at integrating the old and the new buildings. The new addition is minimal in its form but establishes sectional complexity and connections to create unique experiences/ moments. Program: Display space/ gallery/ museum

objectifi ied

Summer 2011

53


Sectional view emphasizing the connection between courtyard and gallery spaces

Proposal- half underground

Sinking the court

Horizontal gallery


View cones

View cones as exhibits

Circulation diagram

55


sectionalperspective perspective Sectional


y structure Gallery

y skin Gallery

Existing ng structure

ation Circulation

y spaces- Indoor/ Outdoor Gallery

Assembly diagram

57



Graduate Studio Project: Mixed-use Urban development at Santa Monica Blvd and Vermont Ave transit station. The design emphasizes on the edge and porosity into the building. The porosity and sectional interaction between masses/ volumes aims at creating a sense of community within the project. Site Area: 1.26 Acres or 55,000 sft. Total building area: 185,000 sft. Program: Retail, Residences, Community services and Gym/Fitness area.

urban hybrid

Spring 2011

Retail/restaurant Residential units Community facilities Gym/ Fitness center- Public Private vertical circulation

59


Ground level plan


Sectional perspective

Public circulation

Private circulation

Structure

Massing

61


Longitudinal section bb


63



undergraduate 3

65



Undergraduate thesis

interactive

Fall 2008

Project: A nature park for the vegetation and entertainment deprived city educating people about the extinct species of the region. Site Area: 196 ACRE, Safari Park, Karachi Program: Museum,safari terminal, viewing deck,data collection, workshops, library, administration, chairlift, cafeteria

67


Sections at multiple levels


Plan at gallery level

22 69



Undergraduate

sketches

Following sketches are done using pencil on canson sheet. The sketches represent architecture of one of my favorite architect - Tadao Ando.

71



73



75


AFFILIATIONS AIAS Registered member of Pakistan Council of Architects and Town Planners (PCATP)

SKILLS BIM + Parametric tools: Revit Architecture, Autodesk Navis Works, Digital Project Grasshopper

EDUCATION Master of Architecture, M.Arch University of Southern California (USC), USA, Dec-2012 Building Science Certificate University of Southern California (USC), USA, Dec-2012 -

Advanced Systems integration (Facade analyses in Ecotect & Revit) Advanced research in Environmental controls (Energy modeling/simulation) Theories of Computer technologies (Revit, Navisworks & Horizontal Glue) Parametric Design: Programing in architecture (Digital Project)

Bachelor of Architecture, B.Arch (Gold medal) Indus Valley School of Art and Architecture, Karachi,Pakistan, 2008

2D/ 3D CAD tools: Auto Cad, Rhino

WORK EXPERIENCE

Rendering tools: Rhino- Vray Energy Modelling tools: Ecotect, EQuest, HEED, BEopt, EnergyPro, IES Editing + Management tools: Adobe Creative Suite, Ms Office Other: Sketching & model making

AWARDS RECEIVED 2011- 2012: Academic Scholarship Architectural merit grant, School of Architecture (USC) Los Angeles, Ca, USA 2008: Agha Hasan Abedi Award Academic Excellence in Architecture, Indus Valley School of Art and Architecture, Pakistan 2008: Mehdi Ali Mirza Award Academic Excellence in Architecture, Institute of Architects Pakistan (IAP) 2003 Gold Medal High school Annual Examination, Pakistan

Walsh Construction (Jun 2012- Present), Los Angeles, USA Building Information Modeling (BIM)- Intern Assisting in BIM procedures and documenting the complex 3d construction coordination process of $2 billion- LAX Tom Bradley International Terminal Extension at Los Angeles, California, USA. Responsibilities: - Assisting in 3D Coordination meetings with subcontractors - Assisting in 3D digital navigation + clash detection using Navisworks - Designing + compiling a detailed publication showing the BIM process EA Consulting Pvt. Ltd

(Jan 2009- May 2010) Karachi, Pakistan

Designer/ Project leader One of the leading engineering and architectural firms in Pakistan with branches nationwide and in the Middle East. I have worked on projects ranging from low-cost structures and mixed-use developments to high-end office and commercial towers. - Al- Shifa Eye trust “Self Reliance Tower”: Master planning, design development and construction drawings for (250,000 sft) highrise office building for one of the largest eye hospitals in Pakistan. - U-fone Headquarters Islamabad, Pak: Concept and design development for 300,000 sft Office building for one of the largest cellular network company in Pakistan. Competition entry, 1st Position - KCIP Financial Towers Karachi, Pak: Conceptualization, master planning and design development for 20-Storey High-rise office building for the upcoming Industrial city. Competition entry: 3rd position - Student- Teacher Hostels Kohistan, Pak: Concept, design development and construction drawings for Low cost Earthquake resistant structures at 40 sites, funded by International Development Bank.

PARTICIPATIONS Exhibit Design for Dr. David Jason Gerber’s research at TED conference, San Francisco, Feb 2012 Teaching Assistant, University of Southern California, Aug 2011- Jun 2012 Graduate Research Scholar, University of Southern California,Jan 2012-Jun 2012

Contact: cell: 213.265.1852 email: abdulalk@usc.edu e- portfolio: www.abdulali.net Linkedin: http://www.linkedin.com/in/abdulalikhan




Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.