Tuggerah Lakes The Entrance Morphodynamic Modelling

Page 82

Value 0.80 m 10.7 s 4.1 m 2 0.2 5 2600 kg/m3 6 hours

Core Details

Secondary Armour

Primary Armour

50% Passing 15% Passing 85% Passing 50% Passing 15% Passing 85% Passing 50% Passing 15% Passing 85% Passing

Unfactored Diameter (m) Mass (kg) 0.30 70 0.27 50 0.34 100 0.16 10 0.14 10 0.18 10 0.06 1 0.05 0 0.06 1

Factored by 10% Diameter (m) Mass (kg) 0.31 80 0.28 60 0.35 110 0.16 10 0.16 10 0.16 10 0.06 1 0.05 0 0.07 1

Comments Wave Height Exceeded at toe of structure 6 hours every 100 years 100 years ARI Tp = 15.0s Depth = -1.1mAHD Bed level at toe of structure + 2.3m Flood Level + 0.9m SLR Batter Slope Porosity of Structure Damage Factor Dry Rock Density Typical Wave Event Duration

Rock Armour Specifications (Van Der Meer (1998)):

Tz d cot P SD Wr Storm Duration

Design Criteria: Component H100

Training Wall Armour Design Calculations Rock Sizings to Resist Wave Action Structure: Revetment Wall - Karagi Point Section: Section C: +4.5mAHD Crest Level