COSTS
8,00% 27,00%
OS 30,00%
35,00%
BENEFITS 02-Structural work
GEOTHERMAL ENERGY 7KH HQWLUH ORZ WHPSHUDWXUH HQHUJ\ GHPDQG FDQ EH PHW WKURXJK
03-Technical equipment
04-Light construction
06-Outdoor facilities
Determination of the Basic Solution
OTHER SOLUTION PROPOSITIONS
ZDUPWK LV H[WUDFWHG IURP WKH JURXQGZDWHU IRU KHDWLQJ ZKLOH LQ summer cold is extracted for cooling. Over time a balance is
COSTS
WKH UHFRPPHQGHG DQG DFKLHYDEOH JURXQGZDWHU XVH ,Q ZLQWHU 8,00%
VAR1
27,00%
VWUXFN EHWZHHQ WKH GHPDQGV IRU KHDWLQJ DQG FRROLQJ
OS
By including on-site storage capacity for the available heat,
30,00%
D qSKDVH VKLIWr LV FUHDWHG EHWZHHQ WKH DFWXDO KHDW LQ WKH JURXQGZDWHU DQG WKH UHTXLUHG WHPSHUDWXUH 7KH HQHUJ\ WKDW WKH JURXQGZDWHU SURYLGHV LQ VXPPHU LV SDUWLDOO\ stored underground; this energy is later released throughout the ZLQWHU ZKHQ KHDW LV H[WUDFWHG IURP WKHVH ZDWHUV
BENEFITS
JURXQGZDWHU WKH KHDWHG VWRUDJH PDVV LV FRROHG 7KLV DSSURDFK
to be harnessed.
THE INCLUSION OF ADDITIONAL IDEAS COSTS
and, as a consequence, greater energy content is available
VAR1 WASTE HEAT
OS
7KH XVH RI LQWHUQDO KHDW VRXUFHV LV EHLQJ DVVHVVHG 7KH ZDVWH KHDW generated in data centers is used for heating purposes.There is no SODQ WR XVH ZDVWH KHDW IURP RWKHU VRXUFHV LQ QHDUE\ ORFDWLRQV
35,00%
The variants are not solely evaluated based on acquisition costs, but also bearing in mind subsequent costs. By considering the notional cash value, a variant with higher acquisition costs that bears lower subsequent costs may be the logical, economic and ecological solution.
,Q WKH ZLQWHUWLPH ZKHQ WKH KHDW LV H[WUDFWHG IURP WKLV WR XQGHUJURXQG ZDWHU XVH FDXVHV JUHDWHU WHPSHUDWXUH RVFLOODWLRQ
WHAT IS ECOLOGY?
PROCEDURES TO DETERMINE AN OPTIMAL SOLUTION
BENEFITS
Provisions that are not necessarily linked to the general concept are analysed separately. Besides estimating feasibility, an estimate of future developments and depreciation calculations based on subsequent costs are expounded upon, to facilitate the construction site owner’s decision.